Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Research Institute of Technology for Machinery as follows:
- Has relationships with 3 project owners.
- Has relationships with 49 contractor.
- Announced 35 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 22 contractor selection plans with a total of 46 bidding packages, of which 12 prequalification documents have not found the investment project.
- Has invited bids for 25 packages (with 28 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 25 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 9 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 26 packages that have not fully posted the contractor selection results. Of these 23 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.10 contractors.
- Breakdown by bidding field: Goods 85.71%, Construction 10.71%, Consultancy 3.57%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 30,204,704,286 VND, of which the total winning bid value is: 30,016,016,338 VND.
- The savings rate is: 0.62%.
Data analysis results of DauThau.info software for bid solicitors Research Institute of Technology for Machinery as follows:
- Has relationships with 49 contractor.
- The average number of contractors participating in each bidding package is: 1.10 contractors.
- Proportion of bidding fields: Goods 85.71%, Construction 10.71%, Consulting 3.57%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 30,204,704,286 VND, in which the total winning value is: 30,016,016,338 VND.
- The savings rate is: 0.62%.
This Bid solicitor is also an investor. The analysis results of data for the investor Research Institute of Technology for Machinery are as follows:
- Is the investor of 35 development investment projects.
- Is the investor of 21 contractor selection plans, of which 20 were self-published, and 1 were published by other entities.
- Is the investor of 19 Tender Notices, of which 18 were self-invited, and 1 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 15 bidding packages, of which 4 were won, 10 were lost, 0 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 93.06% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 96.83% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Ninh Bình (11), Undefined (4)
- Provinces before the merger where the contractor has participated in bidding : Ninh Bình (11), Undefined (4)
- Has relationships with 1 Bid Solicitors
- Has competed against 3 contractors in 14 bidding packages, won 3 packages, lost 10 packages, 0 are pending results, and 1 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Bid solicitor Viện Công Nghệ has posted Tender Notice Tender package No 2: Procurement of raw materials for steelmaking of the investor Research Institute of Technology for Machinery with the form National Competitive Bidding.
05/09/2022 11:07
Bid solicitor Viện Công Nghệ has posted Tender Notice Tender package No 1: Procurement of metal materials of the investor Research Institute of Technology for Machinery with the form National Competitive Bidding.
05/09/2022 11:03
The Bid solicitor Research Institute of Technology for Machinery has posted the results of the bidding package Repair, maintain and upgrade slag electrical equipment of the investor Research Institute of Technology for Machinery.
30/07/2022 10:22
The Bid solicitor Research Institute of Technology for Machinery has posted the results of the bidding package Shop for high-quality electrodes of the investor Research Institute of Technology for Machinery.
30/07/2022 10:18
The Bid solicitor Research Institute of Technology for Machinery has posted the results of the bidding package Installation, maintenance and upgrading of medium frequency furnaces of the investor Research Institute of Technology for Machinery.
29/07/2022 16:52
The Bid solicitor Research Institute of Technology for Machinery has posted the results of the bidding package Procurement of high-quality materials for processing and testing of the investor Research Institute of Technology for Machinery.
29/07/2022 16:48
The Bid solicitor Research Institute of Technology for Machinery has posted the results of the bidding package Shopping fero of the investor Research Institute of Technology for Machinery.
29/07/2022 16:40
The Bid solicitor Research Institute of Technology for Machinery has posted the results of the bidding package Procurement of main materials (metal) for smelting of the investor Research Institute of Technology for Machinery.
29/07/2022 16:28
The Bid solicitor Research Institute of Technology for Machinery has posted the results of the bidding package Procurement of materials for manufacturing technology equipment and tools of the investor Research Institute of Technology for Machinery.
29/07/2022 15:58
The Bid solicitor Research Institute of Technology for Machinery has posted the results of the bidding package Equipment rental of the investor Research Institute of Technology for Machinery.
29/07/2022 15:16
The data sheet has been partially hidden, to see the full information please Login or Register
Research Institute of Technology for Machinery announced the results of the bid package Repair, maintain and upgrade slag electrical equipment .
- Winning bidder: Công ty cổ phần Eridan
30/07/2022 10:22
Research Institute of Technology for Machinery announced the results of the bid package Shop for high-quality electrodes .
- Winning bidder: CÔNG TY CỔ PHẦN TECHNO CORPORATION
30/07/2022 10:18
Research Institute of Technology for Machinery announced the results of the bid package Installation, maintenance and upgrading of medium frequency furnaces .
- Winning bidder: Công ty cổ phần Eridan
29/07/2022 16:52
Research Institute of Technology for Machinery announced the results of the bid package Procurement of high-quality materials for processing and testing .
- Winning bidder: CÔNG TY SẢN XUẤT VÀ THƯƠNG MẠI THUẬN PHÁT – (TNHH)
29/07/2022 16:48
Research Institute of Technology for Machinery announced the results of the bid package Shopping fero .
- Winning bidder: Cửa hàng kinh doanh hóa chất và vật tư khoa học kỹ thuật Lê Thu Thủy
29/07/2022 16:40
Research Institute of Technology for Machinery announced the results of the bid package Procurement of main materials (metal) for smelting .
- Winning bidder: Cửa hàng kinh doanh hóa chất và vật tư khoa học kỹ thuật Lê Thu Thủy
29/07/2022 16:28
Research Institute of Technology for Machinery announced the results of the bid package Procurement of materials for manufacturing technology equipment and tools .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI ĐẦU TƯ VÀ PHÁT TRIỂN HẢI ANH
29/07/2022 15:58
Research Institute of Technology for Machinery announced the results of the bid package Equipment rental .
- Winning bidder: CÔNG TY TNHH KỸ THUẬT VÀ THƯƠNG MẠI LAM PHƯƠNG
29/07/2022 15:16
Research Institute of Technology for Machinery announced the results of the bid package Steel, aluminum and auxiliary welding supplies .
- Winning bidder: Cửa hàng kinh doanh hóa chất và vật tư khoa học kỹ thuật Lê Thu Thủy
29/07/2022 15:07
Research Institute of Technology for Machinery announced the results of the bid package Procurement of chemicals and consumables .
- Winning bidder: Hộ Kinh Doanh Vật tư KHKT, Thiết bị, Hóa chất và Dụng cụ thí nghiệm
28/07/2022 16:36
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Viện Công Nghệ has posted Tender Notice Tender package No 2: Procurement of raw materials for steelmaking of the investor Research Institute of Technology for Machinery with the form National Competitive Bidding.
05/09/2022 11:07
Bid solicitor Viện Công Nghệ has posted Tender Notice Tender package No 1: Procurement of metal materials of the investor Research Institute of Technology for Machinery with the form National Competitive Bidding.
05/09/2022 11:03
The Bid solicitor Research Institute of Technology for Machinery has posted the results of the bidding package Repair, maintain and upgrade slag electrical equipment of the investor Research Institute of Technology for Machinery.
30/07/2022 10:22
The Bid solicitor Research Institute of Technology for Machinery has posted the results of the bidding package Shop for high-quality electrodes of the investor Research Institute of Technology for Machinery.
30/07/2022 10:18
The Bid solicitor Research Institute of Technology for Machinery has posted the results of the bidding package Installation, maintenance and upgrading of medium frequency furnaces of the investor Research Institute of Technology for Machinery.
29/07/2022 16:52
The Bid solicitor Research Institute of Technology for Machinery has posted the results of the bidding package Procurement of high-quality materials for processing and testing of the investor Research Institute of Technology for Machinery.
29/07/2022 16:48
The Bid solicitor Research Institute of Technology for Machinery has posted the results of the bidding package Shopping fero of the investor Research Institute of Technology for Machinery.
29/07/2022 16:40
The Bid solicitor Research Institute of Technology for Machinery has posted the results of the bidding package Procurement of main materials (metal) for smelting of the investor Research Institute of Technology for Machinery.
29/07/2022 16:28
The Bid solicitor Research Institute of Technology for Machinery has posted the results of the bidding package Procurement of materials for manufacturing technology equipment and tools of the investor Research Institute of Technology for Machinery.
29/07/2022 15:58
The Bid solicitor Research Institute of Technology for Machinery has posted the results of the bidding package Equipment rental of the investor Research Institute of Technology for Machinery.
29/07/2022 15:16
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Research Institute of Technology for Machinery has posted 22 of the contractor selection plan, which contains 46 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Research Institute of Technology for Machinery has posted 28 Tender Notices in 25 bidding packages. Among these, 19 Tender Notices were self-invited, and 9 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Research Institute of Technology for Machinery has posted 25 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 25 package, canceled the bid 0 package (among the bidding packages above).
- There are 9 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Research Institute of Technology for Machinery has a relationship with 49 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Research Institute of Technology for Machinery has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects