Data analysis results of DauThau.info software for bid solicitors SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY as follows:
- Has relationships with 1 project owners.
- Has relationships with 11 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 14 contractor selection plans with a total of 13 bidding packages, of which 14 prequalification documents have not found the investment project.
- Has invited bids for 3 packages (with 4 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 13 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 12 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 50.00%, Construction 0%, Consultancy 50.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,677,602,860 VND, of which the total winning bid value is: 1,515,984,973 VND.
- The savings rate is: 9.63%.
Data analysis results of DauThau.info software for bid solicitors SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY as follows:
- Has relationships with 11 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 50.00%, Construction 0%, Consulting 50.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,677,602,860 VND, in which the total winning value is: 1,515,984,973 VND.
- The savings rate is: 9.63%.
This Bid solicitor is also an investor. The analysis results of data for the investor SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 26 contractor selection plans, of which 14 were self-published, and 12 were published by other entities.
- Is the investor of 4 Tender Notices, of which 2 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Measure and map the location of 35kV line pier foundations .
- Winning bidder: Công ty TNHH tư vấn Tài nguyên và Môi trường Quang Minh
08/12/2025 14:28
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package INSURANCE OF COMPLETED CIVIL ENGINEERING WORKS - HA TAY HYDROPOWER PLANT IN 2025 .
- Winning bidder: Agriculture Bank Insurance Joint Stock Corporation
08/12/2025 14:21
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY publishes the plan INSURANCE OF COMPLETED CIVIL ENGINEERING WORKS - HA TAY HYDROPOWER PLANT IN 2025 with 1 bidding package .
04/12/2025 08:59
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY publishes the plan Measure and map the location of 35kV line pier foundations with 1 bidding package .
03/12/2025 13:59
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Construction deformation monitoring cycle 6 - Ha Tay hydroelectric plant .
- Winning bidder: CÔNG TY TNHH HUY TÂY NGUYÊN
27/11/2025 09:33
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY publishes the plan Construction deformation monitoring cycle 6 - Ha Tay hydroelectric plant with 1 bidding package .
25/11/2025 09:49
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Periodic inspection of meters, TU, TI of the electricity measurement system of Ha Tay hydropower plant in 2025 .
- Winning bidder: CENTRAL ELECTRICAL TESTING COMPANY LIMITED
17/10/2025 13:00
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY publishes the plan Periodic inspection of meters, TU, TI of the electricity measurement system of Ha Tay hydropower plant in 2025 with 1 bidding package .
17/10/2025 12:56
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY publishes the plan Periodic inspection of meters, TU, TI of the electricity measurement system of Ha Tay hydropower plant in 2025 with 1 bidding package .
17/10/2025 07:52
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY publishes the plan Periodic inspection of meters, TU, TI of the electricity measurement system of Ha Tay hydropower plant in 2025 with 1 bidding package .
13/10/2025 16:13
The data sheet has been partially hidden, to see the full information please Login or Register
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Dredging streams behind the canal to discharge Ha Tay Hydroelectric Plant .
- Winning bidder: MINH NGUYEN CONSTRUCTION BUSINESS COMPANY LIMITED
24/06/2025 08:32
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY publishes the plan Dredging streams behind the canal to discharge Ha Tay Hydroelectric Plant with 1 bidding package .
18/06/2025 14:39
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Modeling, analyzing environmental parameters and making reports on environmental protection periodically and synthesizing data, making reports on environmental protection in 2025 for Ha Tay Hydroelectric Plant .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN THƯƠNG MẠI VÀ DỊCH VỤ MÔI TRƯỜNG NHÂN HÒA GIA LAI
01/04/2025 16:23
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY publishes the plan Implementing sampling, analyzing environmental parameters and making reports on environmental protection periodically and synthesizing data, making reports on environmental protection in 2025 for Ha Tay Hydroelectric Plant with 1 bidding package .
01/04/2025 13:53
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Prepare documents to adjust the minimum flow after the project and apply for re-issue of Water Resources Exploitation and Use License - Ha Tay Hydroelectric Plant .
- Winning bidder: PHU CUONG PHAT ENVIRONMENT AND RESOURCE SERVICES JOINT STOCK COMPANY
14/03/2025 15:11
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY announced the results of the bidding package Prepare documents to adjust the minimum flow after the project and apply for re-issue of Water Resources Exploitation and Use License - Ha Tay Hydroelectric Plant with 1 participating contractors .
06/03/2025 09:05
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Prepare documents to adjust the minimum flow after the project and apply for re-issue of Water Resources Exploitation and Use License - Ha Tay Hydroelectric Plant in the form Open bidding .
05/02/2025 14:35
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Prepare documents to adjust the minimum flow after the project and apply for re-issue of Water Resources Exploitation and Use License - Ha Tay Hydroelectric Plant in the form Open bidding .
14/01/2025 14:32
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Hire a consulting unit to evaluate the E-HSMT and the results of contractor selection for the package of preparing documents to adjust the minimum flow after the project and apply for re-issuance of the License to exploit and use Water Resources - Hydroelectric Plant Ha Tay .
- Winning bidder: Công ty TNHH Tư vấn Xây dựng Bảo Kiến Uy
30/12/2024 10:42
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Hire a consulting unit to prepare E-Bidding, evaluate the E-Bidding package to prepare documents to adjust the minimum flow after the project and apply for re-issuance of License to exploit and use Water Resources - Ha Tay Hydropower Plant .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TUẤN DƯƠNG PHÁT
30/12/2024 10:39
The data sheet has been partially hidden, to see the full information please Login or Register
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Measure and map the location of 35kV line pier foundations .
- Winning bidder: Công ty TNHH tư vấn Tài nguyên và Môi trường Quang Minh
08/12/2025 14:28
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package INSURANCE OF COMPLETED CIVIL ENGINEERING WORKS - HA TAY HYDROPOWER PLANT IN 2025 .
- Winning bidder: Agriculture Bank Insurance Joint Stock Corporation
08/12/2025 14:21
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY publishes the plan INSURANCE OF COMPLETED CIVIL ENGINEERING WORKS - HA TAY HYDROPOWER PLANT IN 2025 with 1 bidding package .
04/12/2025 08:59
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY publishes the plan Measure and map the location of 35kV line pier foundations with 1 bidding package .
03/12/2025 13:59
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Construction deformation monitoring cycle 6 - Ha Tay hydroelectric plant .
- Winning bidder: CÔNG TY TNHH HUY TÂY NGUYÊN
27/11/2025 09:33
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY publishes the plan Construction deformation monitoring cycle 6 - Ha Tay hydroelectric plant with 1 bidding package .
25/11/2025 09:49
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Periodic inspection of meters, TU, TI of the electricity measurement system of Ha Tay hydropower plant in 2025 .
- Winning bidder: CENTRAL ELECTRICAL TESTING COMPANY LIMITED
17/10/2025 13:00
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY publishes the plan Periodic inspection of meters, TU, TI of the electricity measurement system of Ha Tay hydropower plant in 2025 with 1 bidding package .
17/10/2025 12:56
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY publishes the plan Periodic inspection of meters, TU, TI of the electricity measurement system of Ha Tay hydropower plant in 2025 with 1 bidding package .
17/10/2025 07:52
SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY publishes the plan Periodic inspection of meters, TU, TI of the electricity measurement system of Ha Tay hydropower plant in 2025 with 1 bidding package .
13/10/2025 16:13
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY has posted 14 of the contractor selection plan, which contains 13 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY has posted 4 Tender Notices in 3 bidding packages. Among these, 0 Tender Notices were self-invited, and 4 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY has posted 13 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 13 package, canceled the bid 0 package (among the bidding packages above).
- There are 12 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY has a relationship with 11 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY has a relationship with 2 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity SONG DA TAY NGUYEN HYDROPOWER JOINT STOCK COMPANY has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects