Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON NGUYÊN GIÁP as follows:
- Has relationships with 1 project owners.
- Has relationships with 10 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 11 bidding packages, of which 8 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 10 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,992,553,000 VND, of which the total winning bid value is: 1,992,553,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON NGUYÊN GIÁP as follows:
- Has relationships with 10 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,992,553,000 VND, in which the total winning value is: 1,992,553,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON NGUYÊN GIÁP are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 14 contractor selection plans, of which 8 were self-published, and 6 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG MẦM NON NGUYÊN GIÁP announced the results of the bid package Providing industrial gas cylinders to serve the boarding kitchen of children at Nguyen Giap Kindergarten January 2026 - August 2026 .
- Winning bidder: Lê Văn Thụ
26/12/2025 14:16
TRƯỜNG MẦM NON NGUYÊN GIÁP publishes the plan Providing industrial gas cylinders to serve the boarding kitchen of children at Nguyen Giap Kindergarten January 2026 - August 2026 with 1 bidding package .
24/12/2025 07:49
TRƯỜNG MẦM NON NGUYÊN GIÁP publishes the plan Approving the plan to select the contractor for food procurement for semi -boarding activities at Nguyen Giap Kindergarten from September 2025 to August 31, 2026 with 2 bidding package .
26/08/2025 15:22
TRƯỜNG MẦM NON NGUYÊN GIÁP announced the results of the bid package FAMLAC school dairy shopping for semi -boarding activities .
- Winning bidder: CÔNG TY TNHH SẢN XUẤT THƯƠNG MẠI MI NA
26/08/2025 15:04
TRƯỜNG MẦM NON NGUYÊN GIÁP announced the results of the bid package Shopping, food for semi -boarding kitchen .
- Winning bidder: Hộ kinh doanh Nguyễn Thị Mai
26/08/2025 14:59
TRƯỜNG MẦM NON NGUYÊN GIÁP publishes the plan Approving the plan to select the contractor for food procurement for semi -boarding activities at Nguyen Giap Kindergarten from September 2025 to August 31, 2026 with 2 bidding package .
26/08/2025 10:26
TRƯỜNG MẦM NON NGUYÊN GIÁP publishes the plan Approving the plan to select the contractor for food procurement for semi -boarding activities at Nguyen Giap Kindergarten from September 2025 to August 31, 2026 with 2 bidding package .
26/08/2025 10:24
TRƯỜNG MẦM NON NGUYÊN GIÁP publishes the plan Approving the plan to select the contractor for food procurement for semi -boarding activities at Nguyen Giap Kindergarten from September 2025 to August 31, 2026 with 2 bidding package .
26/08/2025 10:15
TRƯỜNG MẦM NON NGUYÊN GIÁP publishes the plan Approving the plan to select the contractor for food procurement for semi -boarding activities at Nguyen Giap Kindergarten from September 2025 to August 31, 2026 with 2 bidding package .
22/08/2025 16:10
The Bid solicitor TRƯỜNG MẦM NON NGUYÊN GIÁP has posted the results of the bidding package The arch of Nguyen Kindergarten of the investor TRƯỜNG MẦM NON NGUYÊN GIÁP.
- Winning bidder: Hộ kinh doanh Nguyễn Tiến Tuân
01/04/2025 16:08
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON NGUYÊN GIÁP announced the results of the bid package The arch of Nguyen Kindergarten .
- Winning bidder: Hộ kinh doanh Nguyễn Tiến Tuân
01/04/2025 16:08
TRƯỜNG MẦM NON NGUYÊN GIÁP publishes the plan The arch of Nguyen Kindergarten with 1 bidding package .
01/04/2025 16:04
TRƯỜNG MẦM NON NGUYÊN GIÁP announced the results of the bid package Food shopping for semi -boarding activities at Nguyen Giap Kindergarten .
- Winning bidder: Hộ kinh doanh Nguyễn Thị Mai
27/03/2025 10:11
TRƯỜNG MẦM NON NGUYÊN GIÁP publishes the plan Approving the plan to select the contractor of food procurement for semi -boarding activities at Nguyen Giap Kindergarten with 1 bidding package .
26/03/2025 11:15
TRƯỜNG MẦM NON NGUYÊN GIÁP announced the results of the bid package Shopping for preschool tables and chairs, cabinets for children's personal belongings, curtain cabinets, water tanks, televisions, toys, stainless steel footwear prices, stainless steel troughs of arches and PVC pipes of Nguyen Giap Kindergarten .
- Winning bidder: Đinh Thị Tuyết
21/03/2025 16:01
TRƯỜNG MẦM NON NGUYÊN GIÁP publishes the plan Shopping for preschool tables and chairs, cabinets for children's personal belongings, curtain cabinets, water tanks, televisions, toys, stainless steel footwear prices, stainless steel troughs of arches and PVC pipes of Nguyen Giap Kindergarten with 1 bidding package .
21/03/2025 15:36
TRƯỜNG MẦM NON NGUYÊN GIÁP announced the results of the bid package Approving the contractor selection plan: Supplying school sanitary supplies for Nguyen Giap Kindergarten in 2025 .
- Winning bidder: PHẠM VĂN HUY
14/03/2025 16:20
TRƯỜNG MẦM NON NGUYÊN GIÁP publishes the plan Approving the contractor selection plan: Supplying school sanitary supplies for Nguyen Giap Kindergarten in 2025 with 1 bidding package .
14/03/2025 16:15
TRƯỜNG MẦM NON NGUYÊN GIÁP announced the results of the bid package Providing industrial gas cylinders to serve children's boarding kitchens for Nguyen Giap Kindergarten in 2025 .
- Winning bidder: Lê Văn Thụ
18/01/2025 08:59
TRƯỜNG MẦM NON NGUYÊN GIÁP publishes the plan Providing industrial gas cylinders to serve children's boarding kitchens for Nguyen Giap Kindergarten in 2025 with 1 bidding package .
17/01/2025 15:46
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON NGUYÊN GIÁP announced the results of the bid package Providing industrial gas cylinders to serve the boarding kitchen of children at Nguyen Giap Kindergarten January 2026 - August 2026 .
- Winning bidder: Lê Văn Thụ
26/12/2025 14:16
TRƯỜNG MẦM NON NGUYÊN GIÁP publishes the plan Providing industrial gas cylinders to serve the boarding kitchen of children at Nguyen Giap Kindergarten January 2026 - August 2026 with 1 bidding package .
24/12/2025 07:49
TRƯỜNG MẦM NON NGUYÊN GIÁP publishes the plan Approving the plan to select the contractor for food procurement for semi -boarding activities at Nguyen Giap Kindergarten from September 2025 to August 31, 2026 with 2 bidding package .
26/08/2025 15:22
TRƯỜNG MẦM NON NGUYÊN GIÁP announced the results of the bid package FAMLAC school dairy shopping for semi -boarding activities .
- Winning bidder: CÔNG TY TNHH SẢN XUẤT THƯƠNG MẠI MI NA
26/08/2025 15:04
TRƯỜNG MẦM NON NGUYÊN GIÁP announced the results of the bid package Shopping, food for semi -boarding kitchen .
- Winning bidder: Hộ kinh doanh Nguyễn Thị Mai
26/08/2025 14:59
TRƯỜNG MẦM NON NGUYÊN GIÁP publishes the plan Approving the plan to select the contractor for food procurement for semi -boarding activities at Nguyen Giap Kindergarten from September 2025 to August 31, 2026 with 2 bidding package .
26/08/2025 10:26
TRƯỜNG MẦM NON NGUYÊN GIÁP publishes the plan Approving the plan to select the contractor for food procurement for semi -boarding activities at Nguyen Giap Kindergarten from September 2025 to August 31, 2026 with 2 bidding package .
26/08/2025 10:24
TRƯỜNG MẦM NON NGUYÊN GIÁP publishes the plan Approving the plan to select the contractor for food procurement for semi -boarding activities at Nguyen Giap Kindergarten from September 2025 to August 31, 2026 with 2 bidding package .
26/08/2025 10:15
TRƯỜNG MẦM NON NGUYÊN GIÁP publishes the plan Approving the plan to select the contractor for food procurement for semi -boarding activities at Nguyen Giap Kindergarten from September 2025 to August 31, 2026 with 2 bidding package .
22/08/2025 16:10
The Bid solicitor TRƯỜNG MẦM NON NGUYÊN GIÁP has posted the results of the bidding package The arch of Nguyen Kindergarten of the investor TRƯỜNG MẦM NON NGUYÊN GIÁP.
- Winning bidder: Hộ kinh doanh Nguyễn Tiến Tuân
01/04/2025 16:08
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON NGUYÊN GIÁP has posted 8 of the contractor selection plan, which contains 11 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG MẦM NON NGUYÊN GIÁP has posted 10 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 10 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON NGUYÊN GIÁP has a relationship with 10 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON NGUYÊN GIÁP has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects