Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors The Northern Power Viet Nam Projects Management Board as follows:
- Has relationships with 9 project owners.
- Has relationships with 305 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 425 contractor selection plans with a total of 1494 bidding packages, of which 289 prequalification documents have not found the investment project.
- Has invited bids for 1149 packages (with 1201 tender notices), and conducted prequalification for 0 packages.
- There are 80 bidding packages with content that needs clarification.
- Announced the results of 927 package, and canceled bids for 2 packages (among the packages mentioned above).
- There are 177 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 763 packages that have not fully posted the contractor selection results. Of these 729 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.12 contractors.
- Breakdown by bidding field: Goods 34.80%, Construction 18.48%, Consultancy 33.06%, Non-consultancy 13.16%, Mixed 0.25%, Other fields 0.25%.
- The total value according to the packages with valid contractor selection results is: 11,953,786,630,899 VND, of which the total winning bid value is: 9,930,990,522,538 VND.
- The savings rate is: 16.92%.
Data analysis results of DauThau.info software for bid solicitors The Northern Power Viet Nam Projects Management Board as follows:
- Has relationships with 305 contractor.
- The average number of contractors participating in each bidding package is: 2.12 contractors.
- Proportion of bidding fields: Goods 34.80%, Construction 18.48%, Consulting 33.06%, Non-consulting 13.16%, Mixed 0.25%, Other 0.25%.
- The total value according to the bidding package with valid IMP is: 11,953,786,630,899 VND, in which the total winning value is: 9,930,990,522,538 VND.
- The savings rate is: 16.92%.
This Bid solicitor is also an investor. The analysis results of data for the investor The Northern Power Viet Nam Projects Management Board are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 105 contractor selection plans, of which 94 were self-published, and 11 were published by other entities.
- Is the investor of 410 Tender Notices, of which 281 were self-invited, and 129 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package No. 8: Supply and transport the first VTTB of the investor The Northern Power Viet Nam Projects Management Board.
30/11/2023 09:54
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package No. 5: Supply and transportation of VTTB first part of station; Conductors, lightning arresters, insulators, accessories for conductors and lightning arresters; Optical fiber cables and connection line accessories of the investor The Northern Power Viet Nam Projects Management Board.
29/11/2023 10:20
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package 6: Supply and transport of VTTB, the first part of the station of the investor The Northern Power Viet Nam Projects Management Board.
- Winning bidder: CÔNG TY CỔ PHẦN CÔNG NGHỆ DỊCH VỤ ĐIỆN TỔNG HỢP GEST
17/10/2023 09:55
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package No. 9: Supply and transport VTTB first station part; conductors, lightning conductors, insulators and accessories, optical cables and accessories, connection parts of 220 kV lines of the investor The Northern Power Viet Nam Projects Management Board.
- Winning bidder: Công ty Cổ phần YOTEK
18/09/2023 10:07
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package No. 3: Supply and transport transformer 220 kV - 250 MVA of the investor The Northern Power Viet Nam Projects Management Board.
17/07/2023 16:23
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package No. 8: Supply and transportation of 220 kV - 250 MVA transformers of the investor The Northern Power Viet Nam Projects Management Board.
04/07/2023 11:49
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package No. 8: Supply and delivery of Transformers of the investor The Northern Power Viet Nam Projects Management Board.
04/07/2023 11:11
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package No. 9: Supply and transport the first VTTB of the investor The Northern Power Viet Nam Projects Management Board.
- Winning bidder: CÔNG TY CỔ PHẦN HỆ THỐNG KỸ THUẬT NĂNG LƯỢNG
23/06/2023 17:13
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package 10: Supply and transport of secondary VTTB and information VTTB of the investor The Northern Power Viet Nam Projects Management Board.
- Winning bidder: Công ty Cổ phần Hệ thống kỹ thuật ứng dụng
18/01/2023 09:54
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package 10: Supply and transport of second VTTB, information VTTB and SCADA of the investor The Northern Power Viet Nam Projects Management Board.
- Winning bidder: CÔNG TY TNHH PHÁT TRIỂN KỸ THUẬT CÔNG NGHỆ FRA
18/01/2023 09:51
The data sheet has been partially hidden, to see the full information please Login or Register
The Northern Power Viet Nam Projects Management Board announced the results of the bid package Package No. 8: Supply and transport the first VTTB .
- Winning bidder: Công ty cổ phần ENTEC Kỹ thuật Năng lượng
30/11/2023 09:54
The Northern Power Viet Nam Projects Management Board announced the results of the bid package Package No. 5: Supply and transportation of VTTB first part of station; Conductors, lightning arresters, insulators, accessories for conductors and lightning arresters; Optical fiber cables and connection line accessories .
- Winning bidder: Công ty cổ phần Telematic
29/11/2023 10:20
The Northern Power Viet Nam Projects Management Board announced the results of the bid package Package 6: Supply and transport of VTTB, the first part of the station .
- Winning bidder: CÔNG TY CỔ PHẦN TELEMATIC, CÔNG TY CỔ PHẦN CÔNG NGHỆ DỊCH VỤ ĐIỆN TỔNG HỢP GEST
17/10/2023 09:55
The Northern Power Viet Nam Projects Management Board announced the results of the bid package Package No. 9: Supply and transport VTTB first station part; conductors, lightning conductors, insulators and accessories, optical cables and accessories, connection parts of 220 kV lines .
- Winning bidder: Công ty Cổ phần YOTEK
18/09/2023 10:07
The Northern Power Viet Nam Projects Management Board announced the results of the bid package Package No. 3: Supply and transport transformer 220 kV - 250 MVA .
- Winning bidder: TỔNG CÔNG TY THIẾT BỊ ĐIỆN ĐÔNG ANH - CÔNG TY CỔ PHẦN
17/07/2023 16:23
The Northern Power Viet Nam Projects Management Board announced the results of the bid package Package No. 8: Supply and transportation of 220 kV - 250 MVA transformers .
- Winning bidder: TỔNG CÔNG TY THIẾT BỊ ĐIỆN ĐÔNG ANH - CÔNG TY CỔ PHẦN
04/07/2023 11:49
The Northern Power Viet Nam Projects Management Board announced the results of the bid package Package No. 8: Supply and delivery of Transformers .
- Winning bidder: TỔNG CÔNG TY THIẾT BỊ ĐIỆN ĐÔNG ANH - CÔNG TY CỔ PHẦN
04/07/2023 11:11
The Northern Power Viet Nam Projects Management Board announced the results of the bid package Package No. 9: Supply and transport the first VTTB .
- Winning bidder: CÔNG TY CỔ PHẦN YOTEK, CÔNG TY CỔ PHẦN HỆ THỐNG KỸ THUẬT NĂNG LƯỢNG
23/06/2023 17:13
The Northern Power Viet Nam Projects Management Board announced the results of the bid package Package 10: Supply and transport of secondary VTTB and information VTTB .
- Winning bidder: Công ty Cổ phần Hệ thống kỹ thuật ứng dụng
18/01/2023 09:54
The Northern Power Viet Nam Projects Management Board announced the results of the bid package Package 10: Supply and transport of second VTTB, information VTTB and SCADA .
- Winning bidder: CÔNG TY CỔ PHẦN HỆ THỐNG KỸ THUẬT NĂNG LƯỢNG, CÔNG TY TNHH PHÁT TRIỂN KỸ THUẬT CÔNG NGHỆ FRA
18/01/2023 09:51
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package No. 8: Supply and transport the first VTTB of the investor The Northern Power Viet Nam Projects Management Board.
30/11/2023 09:54
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package No. 5: Supply and transportation of VTTB first part of station; Conductors, lightning arresters, insulators, accessories for conductors and lightning arresters; Optical fiber cables and connection line accessories of the investor The Northern Power Viet Nam Projects Management Board.
29/11/2023 10:20
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package 6: Supply and transport of VTTB, the first part of the station of the investor The Northern Power Viet Nam Projects Management Board.
- Winning bidder: CÔNG TY CỔ PHẦN CÔNG NGHỆ DỊCH VỤ ĐIỆN TỔNG HỢP GEST
17/10/2023 09:55
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package No. 9: Supply and transport VTTB first station part; conductors, lightning conductors, insulators and accessories, optical cables and accessories, connection parts of 220 kV lines of the investor The Northern Power Viet Nam Projects Management Board.
- Winning bidder: Công ty Cổ phần YOTEK
18/09/2023 10:07
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package No. 3: Supply and transport transformer 220 kV - 250 MVA of the investor The Northern Power Viet Nam Projects Management Board.
17/07/2023 16:23
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package No. 8: Supply and transportation of 220 kV - 250 MVA transformers of the investor The Northern Power Viet Nam Projects Management Board.
04/07/2023 11:49
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package No. 8: Supply and delivery of Transformers of the investor The Northern Power Viet Nam Projects Management Board.
04/07/2023 11:11
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package No. 9: Supply and transport the first VTTB of the investor The Northern Power Viet Nam Projects Management Board.
- Winning bidder: CÔNG TY CỔ PHẦN HỆ THỐNG KỸ THUẬT NĂNG LƯỢNG
23/06/2023 17:13
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package 10: Supply and transport of secondary VTTB and information VTTB of the investor The Northern Power Viet Nam Projects Management Board.
- Winning bidder: Công ty Cổ phần Hệ thống kỹ thuật ứng dụng
18/01/2023 09:54
The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted the results of the bidding package Package 10: Supply and transport of second VTTB, information VTTB and SCADA of the investor The Northern Power Viet Nam Projects Management Board.
- Winning bidder: CÔNG TY TNHH PHÁT TRIỂN KỸ THUẬT CÔNG NGHỆ FRA
18/01/2023 09:51
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s The Northern Power Viet Nam Projects Management Board has posted 425 of the contractor selection plan, which contains 1494 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted 1201 Tender Notices in 1149 bidding packages. Among these, 232 Tender Notices were self-invited, and 969 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor The Northern Power Viet Nam Projects Management Board has posted 927 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 927 package, canceled the bid 2 package (among the bidding packages above).
- There are 177 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor The Northern Power Viet Nam Projects Management Board has a relationship with 305 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor The Northern Power Viet Nam Projects Management Board has a relationship with 97 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity The Northern Power Viet Nam Projects Management Board has a relationship with 9 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects