Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors The University of Danang ODA Project Management Unit as follows:
- Has relationships with 2 project owners.
- Has relationships with 9 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 10 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 7 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 7 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 9 packages that have not fully posted the contractor selection results. Of these 9 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 100.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,906,787,895 VND, of which the total winning bid value is: 2,822,666,000 VND.
- The savings rate is: 2.89%.
Data analysis results of DauThau.info software for bid solicitors The University of Danang ODA Project Management Unit as follows:
- Has relationships with 9 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 100.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,906,787,895 VND, in which the total winning value is: 2,822,666,000 VND.
- The savings rate is: 2.89%.
This Bid solicitor is also an investor. The analysis results of data for the investor The University of Danang ODA Project Management Unit are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 2 contractor selection plans, of which 2 were self-published, and 0 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor The University of Danang ODA Project Management Unit has posted the request Contractor selection plan for equipment procurement packages in the implementation phase after the basic design of the category Smart teaching and learning organization system on a digital platform (Digital Learning Materials Production Center of UD) under Subproject 1 Construction of technical infrastructure and urgent works for the University of Danang at Hoa Quy - Dien Ngoc, borrowed from the World Bank under the Project of Construction of technical infrastructure and urgent works for Danang University at Hoa Quy - Dien Ngoc of the investor The University of Danang ODA Project Management Unit with 4 bidding package.
30/10/2024 10:45
The Bid solicitor The University of Danang ODA Project Management Unit has posted the request Plan for selecting contractors to estimate the procurement of regularly operating assets for the first phase of 2024 of the ODA-UDDA Project Management Board of the investor The University of Danang ODA Project Management Unit with 2 bidding package.
16/09/2024 08:30
The Bid solicitor The University of Danang ODA Project Management Unit has posted the results of the bidding package Construction of clearing mines and explosives on the project site of the investor The University of Danang ODA Project Management Unit.
- Winning bidder: TỔNG CÔNG TY 319 BỘ QUỐC PHÒNG
09/12/2022 15:28
The Bid solicitor The University of Danang ODA Project Management Unit has posted the results of the bidding package Supervising and surveying topography and geology of the investor The University of Danang ODA Project Management Unit.
- Winning bidder: Công ty cổ phần tư vấn và đầu tư xây dựng hạ tầng Phương Đông
02/12/2022 17:24
The Bid solicitor The University of Danang ODA Project Management Unit has posted the results of the bidding package Consultancy on appraisal of bidding documents and contractor selection results for bidding packages in the design stage after basic design of the investor The University of Danang ODA Project Management Unit.
17/11/2022 09:58
The Bid solicitor The University of Danang ODA Project Management Unit has posted the results of the bidding package Consultancy on preparation of bidding documents, evaluation of bids for bidding packages in the design stage after basic design of the investor The University of Danang ODA Project Management Unit.
17/11/2022 09:54
The Bid solicitor The University of Danang ODA Project Management Unit has posted the results of the bidding package Surveying, making technical construction plans, cost estimates for clearing mines and explosives on the project site of the investor The University of Danang ODA Project Management Unit.
17/11/2022 09:08
The Bid solicitor The University of Danang ODA Project Management Unit has posted the results of the bidding package Consulting to verify the outline of tasks, estimate consulting packages in the design phase after the basic design of the investor The University of Danang ODA Project Management Unit.
17/11/2022 08:55
The Bid solicitor The University of Danang ODA Project Management Unit has posted the results of the bidding package Consultancy on making outline of tasks, estimating consulting packages in the design phase after basic design of the investor The University of Danang ODA Project Management Unit.
- Winning bidder: Công ty Cổ phần tư vấn xây dựng VNA Việt Nam
17/11/2022 08:48
Bid solicitor The University of Danang ODA Project Management Unit has posted Tender Notice Surveying topography, geology and designing construction drawings, cost estimates of the investor The University of Danang ODA Project Management Unit with the form National competitive bidding.
15/09/2022 17:10
The data sheet has been partially hidden, to see the full information please Login or Register
The University of Danang ODA Project Management Unit publishes the plan Contractor selection plan for equipment procurement packages in the implementation phase after the basic design of the category Smart teaching and learning organization system on a digital platform (Digital Learning Materials Production Center of UD) under Subproject 1 Construction of technical infrastructure and urgent works for the University of Danang at Hoa Quy - Dien Ngoc, borrowed from the World Bank under the Project of Construction of technical infrastructure and urgent works for Danang University at Hoa Quy - Dien Ngoc with 4 bidding package .
30/10/2024 10:45
The University of Danang ODA Project Management Unit publishes the plan Plan for selecting contractors to estimate the procurement of regularly operating assets for the first phase of 2024 of the ODA-UDDA Project Management Board with 2 bidding package .
16/09/2024 08:30
The University of Danang ODA Project Management Unit announced the results of the bid package Construction of clearing mines and explosives on the project site .
- Winning bidder: TỔNG CÔNG TY 319 BỘ QUỐC PHÒNG
09/12/2022 15:28
The University of Danang ODA Project Management Unit announced the results of the bid package Supervising and surveying topography and geology .
- Winning bidder: Công ty cổ phần tư vấn và đầu tư xây dựng hạ tầng Phương Đông
02/12/2022 17:24
The University of Danang ODA Project Management Unit announced the results of the bid package Consultancy on appraisal of bidding documents and contractor selection results for bidding packages in the design stage after basic design .
- Winning bidder: Công ty Cổ phần Tư vấn và Đầu tư xây dựng Việt Nam
17/11/2022 09:58
The University of Danang ODA Project Management Unit announced the results of the bid package Consultancy on preparation of bidding documents, evaluation of bids for bidding packages in the design stage after basic design .
- Winning bidder: Công ty Cổ phần Xây dựng và Môi trường Việt Nam
17/11/2022 09:54
The University of Danang ODA Project Management Unit announced the results of the bid package Surveying, making technical construction plans, cost estimates for clearing mines and explosives on the project site .
- Winning bidder: Tổng công ty Thành An, Bộ Quốc phòng
17/11/2022 09:08
The University of Danang ODA Project Management Unit announced the results of the bid package Consulting to verify the outline of tasks, estimate consulting packages in the design phase after the basic design .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN KỸ THUẬT VÀ ĐẦU TƯ XÂY DỰNG ACOCI
17/11/2022 08:55
The University of Danang ODA Project Management Unit announced the results of the bid package Consultancy on making outline of tasks, estimating consulting packages in the design phase after basic design .
- Winning bidder: Công ty Cổ phần tư vấn xây dựng VNA Việt Nam
17/11/2022 08:48
The University of Danang ODA Project Management Unit announced the results of the bidding package Equipment cost appraisal with 1 participating contractors .
28/10/2022 11:03
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor The University of Danang ODA Project Management Unit has posted the request Contractor selection plan for equipment procurement packages in the implementation phase after the basic design of the category Smart teaching and learning organization system on a digital platform (Digital Learning Materials Production Center of UD) under Subproject 1 Construction of technical infrastructure and urgent works for the University of Danang at Hoa Quy - Dien Ngoc, borrowed from the World Bank under the Project of Construction of technical infrastructure and urgent works for Danang University at Hoa Quy - Dien Ngoc of the investor The University of Danang ODA Project Management Unit with 4 bidding package.
30/10/2024 10:45
The Bid solicitor The University of Danang ODA Project Management Unit has posted the request Plan for selecting contractors to estimate the procurement of regularly operating assets for the first phase of 2024 of the ODA-UDDA Project Management Board of the investor The University of Danang ODA Project Management Unit with 2 bidding package.
16/09/2024 08:30
The Bid solicitor The University of Danang ODA Project Management Unit has posted the results of the bidding package Construction of clearing mines and explosives on the project site of the investor The University of Danang ODA Project Management Unit.
- Winning bidder: TỔNG CÔNG TY 319 BỘ QUỐC PHÒNG
09/12/2022 15:28
The Bid solicitor The University of Danang ODA Project Management Unit has posted the results of the bidding package Supervising and surveying topography and geology of the investor The University of Danang ODA Project Management Unit.
- Winning bidder: Công ty cổ phần tư vấn và đầu tư xây dựng hạ tầng Phương Đông
02/12/2022 17:24
The Bid solicitor The University of Danang ODA Project Management Unit has posted the results of the bidding package Consultancy on appraisal of bidding documents and contractor selection results for bidding packages in the design stage after basic design of the investor The University of Danang ODA Project Management Unit.
17/11/2022 09:58
The Bid solicitor The University of Danang ODA Project Management Unit has posted the results of the bidding package Consultancy on preparation of bidding documents, evaluation of bids for bidding packages in the design stage after basic design of the investor The University of Danang ODA Project Management Unit.
17/11/2022 09:54
The Bid solicitor The University of Danang ODA Project Management Unit has posted the results of the bidding package Surveying, making technical construction plans, cost estimates for clearing mines and explosives on the project site of the investor The University of Danang ODA Project Management Unit.
17/11/2022 09:08
The Bid solicitor The University of Danang ODA Project Management Unit has posted the results of the bidding package Consulting to verify the outline of tasks, estimate consulting packages in the design phase after the basic design of the investor The University of Danang ODA Project Management Unit.
17/11/2022 08:55
The Bid solicitor The University of Danang ODA Project Management Unit has posted the results of the bidding package Consultancy on making outline of tasks, estimating consulting packages in the design phase after basic design of the investor The University of Danang ODA Project Management Unit.
- Winning bidder: Công ty Cổ phần tư vấn xây dựng VNA Việt Nam
17/11/2022 08:48
Bid solicitor The University of Danang ODA Project Management Unit has posted Tender Notice Surveying topography, geology and designing construction drawings, cost estimates of the investor The University of Danang ODA Project Management Unit with the form National competitive bidding.
15/09/2022 17:10
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s The University of Danang ODA Project Management Unit has posted 3 of the contractor selection plan, which contains 10 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor The University of Danang ODA Project Management Unit has posted 1 Tender Notices in 1 bidding packages. Among these, 0 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor The University of Danang ODA Project Management Unit has posted 7 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 7 package, canceled the bid 0 package (among the bidding packages above).
- There are 7 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor The University of Danang ODA Project Management Unit has a relationship with 9 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor The University of Danang ODA Project Management Unit has a relationship with 2 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity The University of Danang ODA Project Management Unit has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects