Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Traffic Infrastructure Management Center of Quang Nam as follows:
- Has relationships with 0 project owners.
- Has relationships with 35 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 28 packages (with 30 tender notices), and conducted prequalification for 0 packages.
- There are 3 bidding packages with content that needs clarification.
- Announced the results of 28 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.79 contractors.
- Breakdown by bidding field: Goods 0%, Construction 30.00%, Consultancy 63.33%, Non-consultancy 6.67%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 185,885,080,000 VND, of which the total winning bid value is: 174,613,358,994 VND.
- The savings rate is: 6.06%.
Data analysis results of DauThau.info software for bid solicitors Traffic Infrastructure Management Center of Quang Nam as follows:
- Has relationships with 35 contractor.
- The average number of contractors participating in each bidding package is: 1.79 contractors.
- Proportion of bidding fields: Goods 0%, Construction 30.00%, Consulting 63.33%, Non-consulting 6.67%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 185,885,080,000 VND, in which the total winning value is: 174,613,358,994 VND.
- The savings rate is: 6.06%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Traffic Infrastructure Management Center of Quang Nam announced the results of the bid package Construction audit .
- Winning bidder: COM. PT AUDITING, INVESTMENT, TAX, FINANCAL, ACCOUNTING, CONSULTANCY COMPANY LIMITED
27/06/2025 10:00
Traffic Infrastructure Management Center of Quang Nam announced the results of the bid package Package No. 03: Construction audit .
- Winning bidder: COM. PT AUDITING, INVESTMENT, TAX, FINANCAL, ACCOUNTING, CONSULTANCY COMPANY LIMITED
27/06/2025 09:59
Traffic Infrastructure Management Center of Quang Nam announced the results of the bidding package Construction audit with 1 participating contractors .
23/06/2025 10:01
Traffic Infrastructure Management Center of Quang Nam announced the results of the bidding package Tender package No 03: Construction audit with 1 participating contractors .
23/06/2025 10:01
Traffic Infrastructure Management Center of Quang Nam publishes Tender Notice Tender package No 03: Construction audit in the form Open bidding .
04/06/2025 16:45
Traffic Infrastructure Management Center of Quang Nam publishes Tender Notice Construction audit in the form Open bidding .
04/06/2025 16:45
Traffic Infrastructure Management Center of Quang Nam announced the results of the bid package Package No. 03: Final settlement audit completed .
- Winning bidder: PACIFIC AUDIT COMPANY LIMITED
23/04/2025 16:27
Traffic Infrastructure Management Center of Quang Nam announced the results of the bid package Package 3: Auditing the finalization of the completed project .
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
17/04/2025 08:05
Traffic Infrastructure Management Center of Quang Nam announced the results of the bid package Package No. 03: Final settlement audit completed .
- Winning bidder: COM. PT AUDITING, INVESTMENT, TAX, FINANCAL, ACCOUNTING, CONSULTANCY COMPANY LIMITED
03/04/2025 17:25
Traffic Infrastructure Management Center of Quang Nam announced the results of the bid package Package No. 03: Final settlement audit completed .
- Winning bidder: COM. PT AUDITING, INVESTMENT, TAX, FINANCAL, ACCOUNTING, CONSULTANCY COMPANY LIMITED
17/02/2025 16:03
The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted 30 Tender Notices in 28 bidding packages. Among these, 0 Tender Notices were self-invited, and 30 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted 28 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 28 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has a relationship with 35 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has a relationship with 21 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects