Data analysis results of DauThau.info software for bid solicitors Traffic Infrastructure Management Center of Quang Nam as follows:
- Has relationships with 28 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 22 packages (with 22 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 22 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.05 contractors.
- Breakdown by bidding field: Goods 0%, Construction 40.91%, Consultancy 50.00%, Non-consultancy 9.09%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 185,224,090,000 VND, of which the total winning bid value is: 174,195,760,994 VND.
- The savings rate is: 5.95%.
Data analysis results of DauThau.info software for bid solicitors Traffic Infrastructure Management Center of Quang Nam as follows:
- Has relationships with 28 contractor.
- The average number of contractors participating in each bidding package is: 2.05 contractors.
- Proportion of bidding fields: Goods 0%, Construction 40.91%, Consulting 50.00%, Non-consulting 9.09%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 185,224,090,000 VND, in which the total winning value is: 174,195,760,994 VND.
- The savings rate is: 5.95%.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Package 02: Construction supervision of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: CÔNG TY TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG CÔNG TRÌNH NAM LONG
22/07/2024 16:50
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Package 02: Construction supervision of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: CÔNG TY TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG CÔNG TRÌNH NAM LONG
22/07/2024 16:45
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Package No. 01: Construction works of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: CÔNG TY TNHH KIẾN TRÚC XÂY DỰNG PHÚC HƯNG
13/07/2024 08:08
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Package No. 01: Construction works of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: CÔNG TY TNHH KIẾN TRÚC XÂY DỰNG PHÚC HƯNG
12/07/2024 17:16
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Survey, prepare Economic - Technical report of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: DUONG VIET QUANG NAM JOINT STOCK COMPANY
10/07/2024 13:23
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Package 02: Construction supervision of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: TRAN LE NGUYEN JOINT STOCK COMPANY
05/07/2024 17:25
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Package 02: Construction supervision of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: NGHE AN CONSULTING AND INVESTMENT FOR INFRASTRUCTURE
10/06/2024 08:17
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Package 02: Construction supervision of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: QUANG MINH TV & XD JOINT STOCK COMPANY
06/06/2024 17:39
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Package 02: Construction supervision of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: QUANG NGAI INVESTMENT DEVELOPMENT AND CONSULTANTS JOINT STOCK COMPANY
05/06/2024 16:53
Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted Tender Notice Survey, prepare Economic - Technical report of the investor Traffic Infrastructure Management Center of Quang Nam with the form Open bidding.
05/06/2024 11:28
The data sheet has been partially hidden, to see the full information please Login or Register
Traffic Infrastructure Management Center of Quang Nam announced the results of the bid package Package 02: Construction supervision .
- Winning bidder: CÔNG TY TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG CÔNG TRÌNH NAM LONG
22/07/2024 16:50
Traffic Infrastructure Management Center of Quang Nam announced the results of the bid package Package 02: Construction supervision .
- Winning bidder: CÔNG TY TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG CÔNG TRÌNH NAM LONG
22/07/2024 16:45
Traffic Infrastructure Management Center of Quang Nam announced the results of the bid package Package No. 01: Construction works .
- Winning bidder: CÔNG TY TNHH KIẾN TRÚC XÂY DỰNG PHÚC HƯNG
13/07/2024 08:08
Traffic Infrastructure Management Center of Quang Nam announced the results of the bid package Package No. 01: Construction works .
- Winning bidder: CÔNG TY TNHH KIẾN TRÚC XÂY DỰNG PHÚC HƯNG
12/07/2024 17:16
Traffic Infrastructure Management Center of Quang Nam announced the results of the bid package Survey, prepare Economic - Technical report .
- Winning bidder: DUONG VIET QUANG NAM JOINT STOCK COMPANY
10/07/2024 13:23
Traffic Infrastructure Management Center of Quang Nam announced the results of the bid package Package 02: Construction supervision .
- Winning bidder: TRAN LE NGUYEN JOINT STOCK COMPANY
05/07/2024 17:25
Traffic Infrastructure Management Center of Quang Nam announced the results of the bidding package Survey, prepare Economic - Technical report with 1 participating contractors .
24/06/2024 09:44
Traffic Infrastructure Management Center of Quang Nam announced the results of the bid package Package 02: Construction supervision .
- Winning bidder: NGHE AN CONSULTING AND INVESTMENT FOR INFRASTRUCTURE
10/06/2024 08:17
Traffic Infrastructure Management Center of Quang Nam announced the results of the bid package Package 02: Construction supervision .
- Winning bidder: QUANG MINH TV & XD JOINT STOCK COMPANY
06/06/2024 17:39
Traffic Infrastructure Management Center of Quang Nam announced the results of the bid package Package 02: Construction supervision .
- Winning bidder: QUANG NGAI INVESTMENT DEVELOPMENT AND CONSULTANTS JOINT STOCK COMPANY
05/06/2024 16:53
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Package 02: Construction supervision of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: CÔNG TY TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG CÔNG TRÌNH NAM LONG
22/07/2024 16:50
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Package 02: Construction supervision of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: CÔNG TY TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG CÔNG TRÌNH NAM LONG
22/07/2024 16:45
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Package No. 01: Construction works of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: CÔNG TY TNHH KIẾN TRÚC XÂY DỰNG PHÚC HƯNG
13/07/2024 08:08
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Package No. 01: Construction works of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: CÔNG TY TNHH KIẾN TRÚC XÂY DỰNG PHÚC HƯNG
12/07/2024 17:16
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Survey, prepare Economic - Technical report of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: DUONG VIET QUANG NAM JOINT STOCK COMPANY
10/07/2024 13:23
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Package 02: Construction supervision of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: TRAN LE NGUYEN JOINT STOCK COMPANY
05/07/2024 17:25
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Package 02: Construction supervision of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: NGHE AN CONSULTING AND INVESTMENT FOR INFRASTRUCTURE
10/06/2024 08:17
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Package 02: Construction supervision of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: QUANG MINH TV & XD JOINT STOCK COMPANY
06/06/2024 17:39
The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted the results of the bidding package Package 02: Construction supervision of the investor Traffic Infrastructure Management Center of Quang Nam.
- Winning bidder: QUANG NGAI INVESTMENT DEVELOPMENT AND CONSULTANTS JOINT STOCK COMPANY
05/06/2024 16:53
Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted Tender Notice Survey, prepare Economic - Technical report of the investor Traffic Infrastructure Management Center of Quang Nam with the form Open bidding.
05/06/2024 11:28
The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted 22 Tender Notice in the 22 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has posted 22 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 22 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Traffic Infrastructure Management Center of Quang Nam has a relationship with 28 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code