Data analysis results of DauThau.info software for bid solicitors VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 as follows:
- Has relationships with 1 project owners.
- Has relationships with 189 contractor.
- Announced 4 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 8 bidding packages, of which 7 prequalification documents have not found the investment project.
- Has invited bids for 63 packages (with 72 tender notices), and conducted prequalification for 0 packages.
- There are 22 bidding packages with content that needs clarification.
- Announced the results of 59 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.03 contractors.
- Breakdown by bidding field: Goods 29.17%, Construction 25.00%, Consultancy 20.83%, Non-consultancy 25.00%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 4,996,412,412,014 VND, of which the total winning bid value is: 4,248,777,293,950 VND.
- The savings rate is: 14.96%.
Data analysis results of DauThau.info software for bid solicitors VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 as follows:
- Has relationships with 189 contractor.
- The average number of contractors participating in each bidding package is: 3.03 contractors.
- Proportion of bidding fields: Goods 29.17%, Construction 25.00%, Consulting 20.83%, Non-consulting 25.00%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 4,996,412,412,014 VND, in which the total winning value is: 4,248,777,293,950 VND.
- The savings rate is: 14.96%.
This Bid solicitor is also an investor. The analysis results of data for the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 4 contractor selection plans, of which 3 were self-published, and 1 were published by other entities.
- Is the investor of 7 Tender Notices, of which 5 were self-invited, and 2 were invited by other entities.
- Name of construction organization: BAN QUẢN LÝ DỰ ÁN ĐIỆN 2
- Code of capacity certificate of construction activities: 00048161
- Issuer:
- Fields:
⚬ Quản lý dự án đầu tư xây dựng: Công nghiệp năng lượng (trừ điện hạt nhân)
⚬ Giám sát thi công xây dựng công trình: Công nghiệp năng lượng (trừ điện hạt nhân)
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted the results of the bidding package Object, repair car Mitsubishi Pajero BKS 36M-3513 of Power Project Management Board 2 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2.
18/06/2025 14:17
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted the request Approve the contractor selection plan: Mitsubishi Pajero Pajero BKS 36M-3513. of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 with 1 bidding package.
30/05/2025 09:31
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted the results of the bidding package Maintenance and repair of Toyota Land Cruiser BKS 31A-5315 cars of the Power Project Management Board 2 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2.
29/05/2025 08:30
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted the request Bidding package selection plan: Maintenance and repair of Toyota Land Cruiser BKS 31A-5315 cars of the Power Project Management Board 2 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 with 1 bidding package.
24/04/2025 16:32
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted the results of the bidding package Bidding package providing cleaning services at Quang Trach LLD Board in 2025 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2.
25/03/2025 07:58
Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted Tender Notice Bidding package providing cleaning services at Quang Trach LLD Board in 2025 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 with the form Competitive Offer.
25/02/2025 15:50
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted the request Bidding package selection plan: Providing cleaning services at Quang Trach Development Executive Committee in 2025 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 with 1 bidding package.
13/02/2025 09:31
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted the results of the bidding package Cleaning service of the Management Board of Quang Trach Power Center in 2024 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2.
15/03/2024 08:30
Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted Tender Notice Cleaning service of the Management Board of Quang Trach Power Center in 2024 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 with the form Shortened competitive offer.
15/12/2023 15:22
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted the results of the bidding package Bidding package for cleaning services at Quang Trach Power Center's Executive Board in 2023 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2.
31/01/2023 21:58
The data sheet has been partially hidden, to see the full information please Login or Register
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 announced the results of the bid package Package 04 (TV-04): Investment audit consultancy consultancy .
- Winning bidder: A&C AUDITING AND CONSULTING COMPANY LIMITED
03/09/2025 13:33
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 announced the results of the bid package Package No. 21 (MS03-QT1): Providing imported coal for testing .
- Winning bidder: CÔNG TY CỔ PHẦN KHOÁNG SẢN LAM SƠN
07/08/2025 14:47
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 announced the results of the bid package Bidding package No. 01 (TV01-QTIII) consulting to prepare a pre-feasibility study report and the survey, making feasibility study reports, consulting bidding documents, evaluating bids and supporting investors negotiating contracts .
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 2
29/07/2025 10:48
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 announced the results of the bidding package Package 04 (TV-04): Investment audit consultancy consultancy with 2 participating contractors .
24/07/2025 10:33
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 announced the results of the bidding package Bidding package No. 01 (TV01-QTIII) consulting to prepare a pre-feasibility study report and the survey, making feasibility study reports, consulting bidding documents, evaluating bids and supporting investors negotiating contracts with 1 participating contractors .
19/07/2025 10:15
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 publishes Tender Notice Package 04 (TV-04): Investment audit consultancy consultancy in the form Open bidding .
26/06/2025 10:14
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 publishes Tender Notice Bidding package No. 01 (TV01-QTIII) consulting to prepare a pre-feasibility study report and the survey, making feasibility study reports, consulting bidding documents, evaluating bids and supporting investors negotiating contracts in the form Open bidding .
24/06/2025 23:22
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 publishes Tender Notice Bidding package No. 01 (TV01-QTIII) consulting to prepare a pre-feasibility study report and the survey, making feasibility study reports, consulting bidding documents, evaluating bids and supporting investors negotiating contracts in the form Open bidding .
24/06/2025 21:08
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 announced the results of the bid package Object, repair car Mitsubishi Pajero BKS 36M-3513 of Power Project Management Board 2 .
- Winning bidder: Công Ty TNHH Hoàng Anh Lực
18/06/2025 14:17
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 publishes the plan Approve the contractor selection plan: Mitsubishi Pajero Pajero BKS 36M-3513. with 1 bidding package .
30/05/2025 09:31
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted the results of the bidding package Object, repair car Mitsubishi Pajero BKS 36M-3513 of Power Project Management Board 2 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2.
18/06/2025 14:17
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted the request Approve the contractor selection plan: Mitsubishi Pajero Pajero BKS 36M-3513. of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 with 1 bidding package.
30/05/2025 09:31
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted the results of the bidding package Maintenance and repair of Toyota Land Cruiser BKS 31A-5315 cars of the Power Project Management Board 2 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2.
29/05/2025 08:30
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted the request Bidding package selection plan: Maintenance and repair of Toyota Land Cruiser BKS 31A-5315 cars of the Power Project Management Board 2 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 with 1 bidding package.
24/04/2025 16:32
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted the results of the bidding package Bidding package providing cleaning services at Quang Trach LLD Board in 2025 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2.
25/03/2025 07:58
Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted Tender Notice Bidding package providing cleaning services at Quang Trach LLD Board in 2025 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 with the form Competitive Offer.
25/02/2025 15:50
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted the request Bidding package selection plan: Providing cleaning services at Quang Trach Development Executive Committee in 2025 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 with 1 bidding package.
13/02/2025 09:31
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted the results of the bidding package Cleaning service of the Management Board of Quang Trach Power Center in 2024 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2.
15/03/2024 08:30
Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted Tender Notice Cleaning service of the Management Board of Quang Trach Power Center in 2024 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 with the form Shortened competitive offer.
15/12/2023 15:22
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted the results of the bidding package Bidding package for cleaning services at Quang Trach Power Center's Executive Board in 2023 of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2.
31/01/2023 21:58
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted 8 of the contractor selection plan, which contains 8 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted 72 Tender Notices in 63 bidding packages. Among these, 5 Tender Notices were self-invited, and 67 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has posted 59 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 59 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has a relationship with 189 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has a relationship with 30 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.2 has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects