Data analysis results of DauThau.info software for bid solicitors VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED as follows:
- Has relationships with 1 project owners.
- Has relationships with 99 contractor.
- Announced 27 investment development project, of which 6 projects have not yet announced the prequalification documents.
- Announced 114 contractor selection plans with a total of 147 bidding packages, of which 85 prequalification documents have not found the investment project.
- Has invited bids for 55 packages (with 80 tender notices), and conducted prequalification for 0 packages.
- There are 9 bidding packages with content that needs clarification.
- Announced the results of 109 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 62 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 30 packages that have not fully posted the contractor selection results. Of these 20 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.56 contractors.
- Breakdown by bidding field: Goods 27.50%, Construction 0%, Consultancy 6.25%, Non-consultancy 66.25%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 26,897,499,811,923 VND, of which the total winning bid value is: 24,370,064,360,535 VND.
- The savings rate is: 9.40%.
Data analysis results of DauThau.info software for bid solicitors VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED as follows:
- Has relationships with 99 contractor.
- The average number of contractors participating in each bidding package is: 1.56 contractors.
- Proportion of bidding fields: Goods 27.50%, Construction 0%, Consulting 6.25%, Non-consulting 66.25%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 26,897,499,811,923 VND, in which the total winning value is: 24,370,064,360,535 VND.
- The savings rate is: 9.40%.
This Bid solicitor is also an investor. The analysis results of data for the investor VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED are as follows:
- Is the investor of 27 development investment projects.
- Is the investor of 119 contractor selection plans, of which 90 were self-published, and 29 were published by other entities.
- Is the investor of 114 Tender Notices, of which 80 were self-invited, and 34 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 56 bidding packages, of which 54 were won, 2 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 83.65% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.84% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Quảng Ninh (39), Hà Nội (5), Thái Nguyên (5), Lào Cai (2), Tuyên Quang (1), Undefined (4)
- Provinces before the merger where the contractor has participated in bidding : Quảng Ninh (39), Hà Nội (5), Thái Nguyên (4), Lào Cai (1), Tuyên Quang (1), Undefined (7)
- Has relationships with 21 Bid Solicitors
- Has competed against 2 contractors in 2 bidding packages, won 1 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 2 contractors in 2 bidding packages, won 2 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 42 bidding packages with 21 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Package 3: Completed construction and installation of meeting rooms .
- Winning bidder: DALITA ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY
09/01/2026 17:15
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED publishes the plan Plan for selecting a consulting contractor to create a project to invest in TKV's shift management software, daily orders and statistics for safety training and occupational accidents with 1 bidding package .
08/01/2026 07:40
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED publishes the plan Plan to select contractors to carry out mandatory fire and explosion insurance for the Production Control Center Building in Quang Ninh with 1 bidding package .
07/01/2026 17:23
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Package No. 3: Construction supervision .
- Winning bidder: VINACOMIN - INFORMATICS, TECHNOLOGY, ENVIRONMENT JOINT STOCK COMPANY
02/01/2026 15:24
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Package No. 2: Providing network layer access control equipment .
- Winning bidder: 129 CO.,LTD
02/01/2026 15:18
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Procurement of caustic soda (NaOH) to serve production needs in 2026, package number 01/2026/TKV-XUT .
- Winning bidder: SOUTH BASIC CHEMICALS JOINT STOCK COMPANY
02/01/2026 13:59
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Implement mandatory fire and explosion insurance in 2026 for assets belonging to the Lam Dong Bauxite - Aluminum Complex .
- Winning bidder: PVI Insurance
25/12/2025 15:55
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Goods insurance (coal) transported in Vietnam in 2026-2027 .
- Winning bidder: BaoViet Insurance Corporation
24/12/2025 20:10
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Providing coal transportation services by sea to Duyen Hai 1 Thermal Power Plant. .
24/12/2025 19:24
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Providing coal transportation services by sea to Vung Ang 1 Thermal Power Plant. .
- Winning bidder: TRUONG NGUYEN TRANSPORT IMPORT EXPORT TRADING LIMITED COMPANY
24/12/2025 19:24
The data sheet has been partially hidden, to see the full information please Login or Register
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Package No. 6: Audit to the completed project settlement .
- Winning bidder: KDG VIET NAM AUDITING COMPANY LIMITED
10/10/2025 16:54
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Soften shopping (NaOH) for production needs in 2025-2026, package number 02/2025/TKV-XUT .
- Winning bidder: VINACOMIN - TOURISM & TRADING JOINT STOCK COMPANY, VINACOMIN - TOURISM & TRADING JOINT STOCK COMPANY, SOUTH BASIC CHEMICALS JOINT STOCK COMPANY
21/08/2025 13:17
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Bidding package 1: Consulting on setting up technical projects on investment projects on IT infrastructure and telecommunications system of TTĐHHSX Building in Quang Ninh .
- Winning bidder: VINACOMIN - INFORMATICS, TECHNOLOGY, ENVIRONMENT JOINT STOCK COMPANY, MINH AN HD CONSTRUCTION COMPANY LIMITED
01/08/2025 07:45
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Package No. 3: Project Audit .
- Winning bidder: KVA AUDITING AND VALUATION COMPANY LIMITED
28/07/2025 08:46
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Package No. 4: Supervision of construction and installation of equipment .
- Winning bidder: GLOBAL ENGINEERING & CONSTRUCTION JOINT STOCK COMPANY
23/07/2025 16:55
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Bidding package 3: Examination of economic and technical reports on construction investment .
- Winning bidder: HAI NAM PHONG CONSULTING CONSTRUCTION AND TRADING JOINT STOCK COMPANY
16/07/2025 11:14
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Package 2: Economic and construction technical report .
- Winning bidder: GREEN ERA CONSTRUCTION AND CONSULTANCY JOINT STOCK COMPANY
16/07/2025 11:09
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Package number 5: Construction insurance .
- Winning bidder: Techcom Non-life Insurance Joint Stock Company
09/07/2025 11:03
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Package No. 6: Audit to the completed project settlement .
- Winning bidder: KDG VIET NAM AUDITING COMPANY LIMITED
07/07/2025 13:41
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bidding package Soften shopping (NaOH) for production needs in 2025-2026, package number 02/2025/TKV-XUT with 2 participating contractors .
01/07/2025 10:03
The data sheet has been partially hidden, to see the full information please Login or Register
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Package 3: Completed construction and installation of meeting rooms .
- Winning bidder: DALITA ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY
09/01/2026 17:15
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED publishes the plan Plan for selecting a consulting contractor to create a project to invest in TKV's shift management software, daily orders and statistics for safety training and occupational accidents with 1 bidding package .
08/01/2026 07:40
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED publishes the plan Plan to select contractors to carry out mandatory fire and explosion insurance for the Production Control Center Building in Quang Ninh with 1 bidding package .
07/01/2026 17:23
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Package No. 3: Construction supervision .
- Winning bidder: VINACOMIN - INFORMATICS, TECHNOLOGY, ENVIRONMENT JOINT STOCK COMPANY
02/01/2026 15:24
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Package No. 2: Providing network layer access control equipment .
- Winning bidder: 129 CO.,LTD
02/01/2026 15:18
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Procurement of caustic soda (NaOH) to serve production needs in 2026, package number 01/2026/TKV-XUT .
- Winning bidder: SOUTH BASIC CHEMICALS JOINT STOCK COMPANY
02/01/2026 13:59
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Implement mandatory fire and explosion insurance in 2026 for assets belonging to the Lam Dong Bauxite - Aluminum Complex .
- Winning bidder: PVI Insurance
25/12/2025 15:55
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Goods insurance (coal) transported in Vietnam in 2026-2027 .
- Winning bidder: BaoViet Insurance Corporation
24/12/2025 20:10
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Providing coal transportation services by sea to Duyen Hai 1 Thermal Power Plant. .
24/12/2025 19:24
VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED announced the results of the bid package Providing coal transportation services by sea to Vung Ang 1 Thermal Power Plant. .
- Winning bidder: TRUONG NGUYEN TRANSPORT IMPORT EXPORT TRADING LIMITED COMPANY
24/12/2025 19:24
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED has posted 114 of the contractor selection plan, which contains 147 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED has posted 80 Tender Notices in 55 bidding packages. Among these, 80 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED has posted 109 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 109 package, canceled the bid 0 package (among the bidding packages above).
- There are 62 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED has a relationship with 99 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED has a relationship with 7 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity VIETNAM NATIONAL COAL AND MINERAL INDUSTRIES HOLDING CORPORATION LIMITED has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects