Data analysis results of DauThau.info software for bid solicitors VINH TAN 4 THERMAL POWER PLANT as follows:
- Has relationships with 2 project owners.
- Has relationships with 492 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 166 contractor selection plans with a total of 505 bidding packages, of which 161 prequalification documents have not found the investment project.
- Has invited bids for 592 packages (with 657 tender notices), and conducted prequalification for 3 packages.
- There are 8 bidding packages with content that needs clarification.
- Announced the results of 447 package, and canceled bids for 1 packages (among the packages mentioned above).
- There are 17 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 92 packages that have not fully posted the contractor selection results. Of these 44 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.53 contractors.
- Breakdown by bidding field: Goods 52.97%, Construction 8.83%, Consultancy 6.85%, Non-consultancy 28.46%, Mixed 2.89%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,613,677,434,678 VND, of which the total winning bid value is: 2,447,635,736,401 VND.
- The savings rate is: 6.35%.
Data analysis results of DauThau.info software for bid solicitors VINH TAN 4 THERMAL POWER PLANT as follows:
- Has relationships with 492 contractor.
- The average number of contractors participating in each bidding package is: 2.53 contractors.
- Proportion of bidding fields: Goods 52.97%, Construction 8.83%, Consulting 6.85%, Non-consulting 28.46%, Mixed 2.89%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,613,677,434,678 VND, in which the total winning value is: 2,447,635,736,401 VND.
- The savings rate is: 6.35%.
This Bid solicitor is also an investor. The analysis results of data for the investor VINH TAN 4 THERMAL POWER PLANT are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 163 contractor selection plans, of which 163 were self-published, and 0 were published by other entities.
- Is the investor of 600 Tender Notices, of which 581 were self-invited, and 19 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Bidding package No. 96: Supply of materials and equipment for Network security system of the investor VINH TAN 4 THERMAL POWER PLANT.
22/12/2022 10:09
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package No. 79: Supply of electrical materials and CI of the investor VINH TAN 4 THERMAL POWER PLANT.
19/12/2022 13:14
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package 21: Construction supervision consultancy, installation of equipment to renovate, upgrade and complete the automatic and continuous wastewater monitoring system of Vinh Tan 44MR Thermal Power Plant (the remaining 4 stations) according to the regulations environmental legislation of the investor VINH TAN 4 THERMAL POWER PLANT.
19/12/2022 10:01
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package No. 57: Providing TU TI inspection services of the investor VINH TAN 4 THERMAL POWER PLANT.
14/12/2022 13:30
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package 74: Supplying lubricants in 2022 of the investor VINH TAN 4 THERMAL POWER PLANT.
- Winning bidder: Công ty Cổ phần Dầu khí Quốc tế PS
14/12/2022 13:26
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package 73: Providing repair and maintenance services for automatic fire alarm systems of the investor VINH TAN 4 THERMAL POWER PLANT.
14/12/2022 12:39
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package 52: Providing oil analysis services of the investor VINH TAN 4 THERMAL POWER PLANT.
- Winning bidder: Viện Hóa học Công nghiệp Việt Nam
14/12/2022 12:28
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package No.88: Repairing paint for 02 common coal depot shredders and conveyor motor pedestals of the investor VINH TAN 4 THERMAL POWER PLANT.
- Winning bidder: CÔNG TY CỔ PHẦN HÓA DẦU CÔNG NGHỆ CAO HI PEC
01/12/2022 15:34
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package 62: Providing the service of making reports on social and environmental action plans for the operation period for Vinh Tan 4 Thermal Power Plant in 2022 of the investor VINH TAN 4 THERMAL POWER PLANT.
- Winning bidder: Trung Tâm Nghiên Cứu Và Tư Vấn Về Phát Triển
01/12/2022 10:23
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package 95: Supplying materials to complete IT infrastructure and video conferencing of the investor VINH TAN 4 THERMAL POWER PLANT.
- Winning bidder: Công ty TNHH Thương mại Gia Lợi
29/11/2022 13:52
The data sheet has been partially hidden, to see the full information please Login or Register
VINH TAN 4 THERMAL POWER PLANT announced the results of the bid package Bidding package No. 96: Supply of materials and equipment for Network security system .
- Winning bidder: Công ty TNHH Thương mại Gia Lợi
22/12/2022 10:09
VINH TAN 4 THERMAL POWER PLANT announced the results of the bid package Package No. 79: Supply of electrical materials and CI .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ THƯƠNG MẠI VÀ KỸ THUẬT LƯƠNG GIA
19/12/2022 13:14
VINH TAN 4 THERMAL POWER PLANT announced the results of the bid package Package 21: Construction supervision consultancy, installation of equipment to renovate, upgrade and complete the automatic and continuous wastewater monitoring system of Vinh Tan 44MR Thermal Power Plant (the remaining 4 stations) according to the regulations environmental legislation .
- Winning bidder: CÔNG TY CỔ PHẦN NƯỚC VÀ XÂY DỰNG ĐƯỜNG THÀNH
19/12/2022 10:01
VINH TAN 4 THERMAL POWER PLANT announced the results of the bid package Package No. 57: Providing TU TI inspection services .
- Winning bidder: Trung tâm Nghiên cứu và Ứng dụng Khoa học Công nghệ, CÔNG TY CỔ PHẦN ĐO LƯỜNG QUỐC TẾ
14/12/2022 13:30
VINH TAN 4 THERMAL POWER PLANT announced the results of the bid package Package 74: Supplying lubricants in 2022 .
- Winning bidder: Công ty Cổ phần Dầu khí Quốc tế PS
14/12/2022 13:26
VINH TAN 4 THERMAL POWER PLANT announced the results of the bid package Package 73: Providing repair and maintenance services for automatic fire alarm systems .
- Winning bidder: Công ty cổ phần đầu tư phát triển xây dựng và thương mại Nam Thắng
14/12/2022 12:39
VINH TAN 4 THERMAL POWER PLANT announced the results of the bid package Package 52: Providing oil analysis services .
- Winning bidder: Viện Hóa học Công nghiệp Việt Nam
14/12/2022 12:28
VINH TAN 4 THERMAL POWER PLANT announced the results of the bid package Package No.88: Repairing paint for 02 common coal depot shredders and conveyor motor pedestals .
- Winning bidder: CÔNG TY CỔ PHẦN HÓA DẦU CÔNG NGHỆ CAO HI PEC
01/12/2022 15:34
VINH TAN 4 THERMAL POWER PLANT announced the results of the bid package Package 62: Providing the service of making reports on social and environmental action plans for the operation period for Vinh Tan 4 Thermal Power Plant in 2022 .
- Winning bidder: Trung Tâm Nghiên Cứu Và Tư Vấn Về Phát Triển
01/12/2022 10:23
VINH TAN 4 THERMAL POWER PLANT announced the results of the bid package Package 95: Supplying materials to complete IT infrastructure and video conferencing .
- Winning bidder: Công ty TNHH Thương mại Gia Lợi
29/11/2022 13:52
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Bidding package No. 96: Supply of materials and equipment for Network security system of the investor VINH TAN 4 THERMAL POWER PLANT.
22/12/2022 10:09
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package No. 79: Supply of electrical materials and CI of the investor VINH TAN 4 THERMAL POWER PLANT.
19/12/2022 13:14
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package 21: Construction supervision consultancy, installation of equipment to renovate, upgrade and complete the automatic and continuous wastewater monitoring system of Vinh Tan 44MR Thermal Power Plant (the remaining 4 stations) according to the regulations environmental legislation of the investor VINH TAN 4 THERMAL POWER PLANT.
19/12/2022 10:01
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package No. 57: Providing TU TI inspection services of the investor VINH TAN 4 THERMAL POWER PLANT.
14/12/2022 13:30
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package 74: Supplying lubricants in 2022 of the investor VINH TAN 4 THERMAL POWER PLANT.
- Winning bidder: Công ty Cổ phần Dầu khí Quốc tế PS
14/12/2022 13:26
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package 73: Providing repair and maintenance services for automatic fire alarm systems of the investor VINH TAN 4 THERMAL POWER PLANT.
14/12/2022 12:39
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package 52: Providing oil analysis services of the investor VINH TAN 4 THERMAL POWER PLANT.
- Winning bidder: Viện Hóa học Công nghiệp Việt Nam
14/12/2022 12:28
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package No.88: Repairing paint for 02 common coal depot shredders and conveyor motor pedestals of the investor VINH TAN 4 THERMAL POWER PLANT.
- Winning bidder: CÔNG TY CỔ PHẦN HÓA DẦU CÔNG NGHỆ CAO HI PEC
01/12/2022 15:34
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package 62: Providing the service of making reports on social and environmental action plans for the operation period for Vinh Tan 4 Thermal Power Plant in 2022 of the investor VINH TAN 4 THERMAL POWER PLANT.
- Winning bidder: Trung Tâm Nghiên Cứu Và Tư Vấn Về Phát Triển
01/12/2022 10:23
The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted the results of the bidding package Package 95: Supplying materials to complete IT infrastructure and video conferencing of the investor VINH TAN 4 THERMAL POWER PLANT.
- Winning bidder: Công ty TNHH Thương mại Gia Lợi
29/11/2022 13:52
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s VINH TAN 4 THERMAL POWER PLANT has posted 166 of the contractor selection plan, which contains 505 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VINH TAN 4 THERMAL POWER PLANT posted 3 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted 657 Tender Notices in 592 bidding packages. Among these, 652 Tender Notices were self-invited, and 5 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has posted 447 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 447 package, canceled the bid 1 package (among the bidding packages above).
- There are 17 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has a relationship with 492 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VINH TAN 4 THERMAL POWER PLANT has a relationship with 15 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity VINH TAN 4 THERMAL POWER PLANT has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects