Data analysis results of DauThau.info software for bid solicitors VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 as follows:
- Has relationships with 1 project owners.
- Has relationships with 10 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 2 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 10.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 100.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,200,000,000 VND, of which the total winning bid value is: 450,278,000 VND.
- The savings rate is: 79.53%.
Data analysis results of DauThau.info software for bid solicitors VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 as follows:
- Has relationships with 10 contractor.
- The average number of contractors participating in each bidding package is: 10.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 100.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,200,000,000 VND, in which the total winning value is: 450,278,000 VND.
- The savings rate is: 79.53%.
This Bid solicitor is also an investor. The analysis results of data for the investor VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 3 contractor selection plans, of which 2 were self-published, and 1 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 publishes the plan Package: Repair of Toyota Camry car number 86A-043.18 with 1 bidding package .
12/12/2025 15:25
The Bid solicitor VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 has posted the request Contractor selection plan Package: Consulting on calculating the equipment ratio to increase from 2 600MW generator units to 3 600MW generator units for Vinh Tan 4 and Vinh Tan 4 thermal power plant expansion projects of the investor VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 with 1 bidding package.
24/06/2024 16:18
The Bid solicitor VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 has posted the request Contractor selection plan - Package: Repair of Toyota Camry car number 86A-043.18 and PRADO TRJ150L-GKPEKV car number 86A-042.43 of the investor VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 with 1 bidding package.
13/03/2024 08:25
Investor VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 has posted an investment and development project Vinh Tan 4 Thermal Power Plant Expansion.
09/08/2018 19:19
The data sheet has been partially hidden, to see the full information please Login or Register
VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 publishes the plan Contractor selection plan Package: Consulting on calculating the equipment ratio to increase from 2 600MW generator units to 3 600MW generator units for Vinh Tan 4 and Vinh Tan 4 thermal power plant expansion projects with 1 bidding package .
24/06/2024 16:18
VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 announced the results of the bid package Auditing project costs related to equipment declared for import by the contractor under the EPC Contract
Vinh Tan 4 and Vinh Tan 4 Thermal Power Plant expansion projects .
- Winning bidder: VIET AUSTRALIA AUDITING COMPANY LIMITED
12/04/2024 09:00
VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 announced the results of the bidding package Auditing project costs related to equipment declared for import by the contractor under the EPC Contract
Vinh Tan 4 and Vinh Tan 4 Thermal Power Plant expansion projects with 10 participating contractors .
25/03/2024 09:01
VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 publishes the plan Contractor selection plan - Package: Repair of Toyota Camry car number 86A-043.18 and PRADO TRJ150L-GKPEKV car number 86A-042.43 with 1 bidding package .
13/03/2024 08:25
VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 publishes Tender Notice Auditing project costs related to equipment declared for import by the contractor under the EPC Contract
Vinh Tan 4 and Vinh Tan 4 Thermal Power Plant expansion projects in the form Open bidding .
05/03/2024 09:16
The data sheet has been partially hidden, to see the full information please Login or Register
VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 publishes the plan Package: Repair of Toyota Camry car number 86A-043.18 with 1 bidding package .
12/12/2025 15:25
The Bid solicitor VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 has posted the request Contractor selection plan Package: Consulting on calculating the equipment ratio to increase from 2 600MW generator units to 3 600MW generator units for Vinh Tan 4 and Vinh Tan 4 thermal power plant expansion projects of the investor VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 with 1 bidding package.
24/06/2024 16:18
The Bid solicitor VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 has posted the request Contractor selection plan - Package: Repair of Toyota Camry car number 86A-043.18 and PRADO TRJ150L-GKPEKV car number 86A-042.43 of the investor VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 with 1 bidding package.
13/03/2024 08:25
Investor VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 has posted an investment and development project Vinh Tan 4 Thermal Power Plant Expansion.
09/08/2018 19:19
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 has posted 2 of the contractor selection plan, which contains 2 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 has posted 1 Tender Notices in 1 bidding packages. Among these, 0 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 has a relationship with 10 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 has a relationship with 1 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 3 has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects