Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Vietnam Maritime Administration as follows:
- Has relationships with 64 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 109 contractor selection plans with a total of 230 bidding packages, of which 104 prequalification documents have not found the investment project.
- Has invited bids for 51 packages (with 66 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 139 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 97 packages with results that do not have tender notice or prequalification notice.
- There are 79 packages that have not fully posted the contractor selection results. Of these 70 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.77 contractors.
- Breakdown by bidding field: Goods 0%, Construction 6.06%, Consultancy 89.39%, Non-consultancy 3.03%, Mixed 1.52%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 197,291,877,626 VND, of which the total winning bid value is: 194,358,876,982 VND.
- The savings rate is: 1.49%.
Data analysis results of DauThau.info software for bid solicitors Vietnam Maritime Administration as follows:
- Has relationships with 64 contractor.
- The average number of contractors participating in each bidding package is: 1.77 contractors.
- Proportion of bidding fields: Goods 0%, Construction 6.06%, Consulting 89.39%, Non-consulting 3.03%, Mixed 1.52%, Other 0%.
- The total value according to the bidding package with valid IMP is: 197,291,877,626 VND, in which the total winning value is: 194,358,876,982 VND.
- The savings rate is: 1.49%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 2 investment and development projects.
- As the owner of 86 Contractor selection plan in which 86 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 80 bidding packages in which 66 packages are self-invited, and 14 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor Vietnam Maritime Administration has posted Tender Notice Tender package No 01: Project management consulting of the investor Vietnam Maritime Administration with the form Open bidding.
23/10/2024 14:10
The Bid solicitor Vietnam Maritime Administration has posted the request AIS information management and exploitation service to serve the management of construction vehicles dredging and maintaining the Rach Gia navigation channel (Work to be implemented in 2024) of the investor Vietnam Maritime Administration with 1 bidding package.
16/10/2024 11:07
Bid solicitor Vietnam Maritime Administration has posted Tender Notice Consulting package No. 08: Survey for acceptance of the investor Vietnam Maritime Administration with the form Open bidding.
15/10/2024 10:02
Bid solicitor Vietnam Maritime Administration has posted Tender Notice Consulting package number 05: Topographic survey for BGMB of the investor Vietnam Maritime Administration with the form Open bidding.
15/10/2024 09:39
Bid solicitor Vietnam Maritime Administration has posted Tender Notice Bidding package No. 02: Survey consulting, preparation of technical and economic reports of the investor Vietnam Maritime Administration with the form Open bidding.
14/10/2024 16:09
Bid solicitor Vietnam Maritime Administration has posted Tender Notice Consulting package No. 07: Supervision of BGMB topographic survey, acceptance of the project and Supervision of dredging and maintenance of channels, temporary storage tanks, construction and reinforcement of dykes surrounding dredged material storage yards of the investor Vietnam Maritime Administration with the form Open bidding.
11/10/2024 16:05
Bid solicitor Vietnam Maritime Administration has posted Tender Notice Tender package No 11: "AIS information management and exploitation service to serve the management of construction and maintenance facilities for Hai Phong navigation channel in 2022 - 2025 (Ha Nam and Bach Dang Canal sections)" of the investor Vietnam Maritime Administration with the form Open bidding.
10/10/2024 18:07
The Bid solicitor Vietnam Maritime Administration has posted the request Contractor selection plan Project: Dredging and maintaining the Saigon - Vung Tau navigation channel in 2023 of the investor Vietnam Maritime Administration with 6 bidding package.
09/10/2024 17:02
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package No. 7: Acceptance survey of the investor Vietnam Maritime Administration.
- Winning bidder: THIEN BAO CONSTRUCTION ENGINEERING COMPANY LIMITED
09/10/2024 16:21
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package No. 4: Survey for BGMB of the investor Vietnam Maritime Administration.
- Winning bidder: CONSTRUCTION CONSULTATION JOINT STOCK COMPANY FOR MARITIME BUILDING
09/10/2024 16:12
The data sheet has been partially hidden, to see the full information please Login or Register
Vietnam Maritime Administration announced the results of the bidding package Tender package No 11: "AIS information management and exploitation service to serve the management of construction and maintenance facilities for Hai Phong navigation channel in 2022 - 2025 (Ha Nam and Bach Dang Canal sections)" with 2 participating contractors .
25/10/2024 10:19
Vietnam Maritime Administration publishes Tender Notice Tender package No 01: Project management consulting in the form Open bidding .
23/10/2024 14:10
Vietnam Maritime Administration publishes the plan AIS information management and exploitation service to serve the management of construction vehicles dredging and maintaining the Rach Gia navigation channel (Work to be implemented in 2024) with 1 bidding package .
16/10/2024 11:07
Vietnam Maritime Administration publishes Tender Notice Consulting package No. 08: Survey for acceptance in the form Open bidding .
15/10/2024 10:02
Vietnam Maritime Administration publishes Tender Notice Consulting package number 05: Topographic survey for BGMB in the form Open bidding .
15/10/2024 09:39
Vietnam Maritime Administration publishes Tender Notice Bidding package No. 02: Survey consulting, preparation of technical and economic reports in the form Open bidding .
14/10/2024 16:09
Vietnam Maritime Administration publishes Tender Notice Consulting package No. 07: Supervision of BGMB topographic survey, acceptance of the project and Supervision of dredging and maintenance of channels, temporary storage tanks, construction and reinforcement of dykes surrounding dredged material storage yards in the form Open bidding .
11/10/2024 16:05
Vietnam Maritime Administration publishes Tender Notice Tender package No 11: "AIS information management and exploitation service to serve the management of construction and maintenance facilities for Hai Phong navigation channel in 2022 - 2025 (Ha Nam and Bach Dang Canal sections)" in the form Open bidding .
10/10/2024 18:07
Vietnam Maritime Administration publishes the plan Contractor selection plan Project: Dredging and maintaining the Saigon - Vung Tau navigation channel in 2023 with 6 bidding package .
09/10/2024 17:02
Vietnam Maritime Administration announced the results of the bid package Package No. 7: Acceptance survey .
- Winning bidder: PHU HA BUILDING AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY, THIEN BAO CONSTRUCTION ENGINEERING COMPANY LIMITED
09/10/2024 16:21
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Vietnam Maritime Administration has posted Tender Notice Tender package No 01: Project management consulting of the investor Vietnam Maritime Administration with the form Open bidding.
23/10/2024 14:10
The Bid solicitor Vietnam Maritime Administration has posted the request AIS information management and exploitation service to serve the management of construction vehicles dredging and maintaining the Rach Gia navigation channel (Work to be implemented in 2024) of the investor Vietnam Maritime Administration with 1 bidding package.
16/10/2024 11:07
Bid solicitor Vietnam Maritime Administration has posted Tender Notice Consulting package No. 08: Survey for acceptance of the investor Vietnam Maritime Administration with the form Open bidding.
15/10/2024 10:02
Bid solicitor Vietnam Maritime Administration has posted Tender Notice Consulting package number 05: Topographic survey for BGMB of the investor Vietnam Maritime Administration with the form Open bidding.
15/10/2024 09:39
Bid solicitor Vietnam Maritime Administration has posted Tender Notice Bidding package No. 02: Survey consulting, preparation of technical and economic reports of the investor Vietnam Maritime Administration with the form Open bidding.
14/10/2024 16:09
Bid solicitor Vietnam Maritime Administration has posted Tender Notice Consulting package No. 07: Supervision of BGMB topographic survey, acceptance of the project and Supervision of dredging and maintenance of channels, temporary storage tanks, construction and reinforcement of dykes surrounding dredged material storage yards of the investor Vietnam Maritime Administration with the form Open bidding.
11/10/2024 16:05
Bid solicitor Vietnam Maritime Administration has posted Tender Notice Tender package No 11: "AIS information management and exploitation service to serve the management of construction and maintenance facilities for Hai Phong navigation channel in 2022 - 2025 (Ha Nam and Bach Dang Canal sections)" of the investor Vietnam Maritime Administration with the form Open bidding.
10/10/2024 18:07
The Bid solicitor Vietnam Maritime Administration has posted the request Contractor selection plan Project: Dredging and maintaining the Saigon - Vung Tau navigation channel in 2023 of the investor Vietnam Maritime Administration with 6 bidding package.
09/10/2024 17:02
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package No. 7: Acceptance survey of the investor Vietnam Maritime Administration.
- Winning bidder: THIEN BAO CONSTRUCTION ENGINEERING COMPANY LIMITED
09/10/2024 16:21
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package No. 4: Survey for BGMB of the investor Vietnam Maritime Administration.
- Winning bidder: CONSTRUCTION CONSULTATION JOINT STOCK COMPANY FOR MARITIME BUILDING
09/10/2024 16:12
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Vietnam Maritime Administration has posted 109 of the contractor selection plan, which contains 230 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Vietnam Maritime Administration has posted 66 Tender Notice in the 51 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Vietnam Maritime Administration has posted 139 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 139 package, canceled the bid 0 package (among the bidding packages above).
- There are 97 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Vietnam Maritime Administration has a relationship with 64 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Vietnam Maritime Administration has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Vietnam Maritime Administration is the investor of 80 package, of which 66 package is self-invited, other units invite bid 14 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Vietnam Maritime Administration is the owner of 86 contractor selection plan. In which, they self-invite 86 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Vietnam Maritime Administration is an investor with 76 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Vietnam Maritime Administration is the investor of 2 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code