Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY as follows:
- Has relationships with 5 contractor.
- Announced 4 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 34 bidding packages, of which 7 prequalification documents have not found the investment project.
- Has invited bids for 9 packages (with 9 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 9 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 26 packages that have not fully posted the contractor selection results. Of these 24 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 12,503,453,000 VND, of which the total winning bid value is: 11,955,032,464 VND.
- The savings rate is: 4.39%.
Data analysis results of DauThau.info software for bid solicitors AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 12,503,453,000 VND, in which the total winning value is: 11,955,032,464 VND.
- The savings rate is: 4.39%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 4 investment and development projects.
- As the owner of 7 Contractor selection plan in which 7 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 9 bidding packages in which 9 packages are self-invited, and 0 packages are invited by other units.
You need to Login or Sign up to view all informations.
- Participated in 11 bidding packages, of which 10 were won, 0 were lost, 1 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 99.62% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100.62% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hải Phòng (4), Undefined (7)
- Has relationships with 6 Bid Solicitors
- Has competed against 3 contractors in 2 bidding packages, won 2 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 15 contractors in 8 bidding packages, won 8 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Name of construction organization: CÔNG TY TNHH MỘT THÀNH VIÊN KHAI THÁC CÔNG TRÌNH THỦY LỢI AN HẢI
- Code of capacity certificate of construction activities: 00013961
- Issuer: Sở Kế hoạch và Đầu tư thành phố Hải Phòng
- Fields:
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình thủy lợi.
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình cấp nước - thoát nước.
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình đê điều.
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình hàng hải.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted the results of the bidding package Civil Works of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY.
- Winning bidder: HUNG LONG KHANH COMPANY LIMITED
29/10/2024 08:14
Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted Tender Notice Civil Works of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY with the form Open bidding.
17/10/2024 14:36
The Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted the results of the bidding package Civil Works of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY.
- Winning bidder: HUNG LONG KHANH COMPANY LIMITED
16/10/2024 14:44
Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted Tender Notice Tender package No 03: Construction work of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY with the form Open bidding.
15/10/2024 16:28
Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted Tender Notice Civil Works of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY with the form Open bidding.
10/10/2024 14:28
The Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted the request Canal behind Kieu Thuong sewer. Item: Upgrading arch sewer 2 (KT.QK2) of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY with 4 bidding package.
07/10/2024 08:40
The Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted the request Project: An Kim Hai canal branch 2. Items: (1) Dredging and embanking the canal section from Dang Cuong pumping station to Nguyen Truong To street; (2) Dredging the canal bed from Bach Mai dam to Nguyen Van Linh street of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY with 4 bidding package.
27/09/2024 14:50
Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted Tender Notice Civil Works of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY with the form Open bidding.
25/09/2024 11:24
The Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted the request Project: Dredging, clearing the flow, handling blockages and shallows in Dai Hung canal, Tan Hung Hong canal branch 1 and suction canal of Dong Hoa pumping station. Items: (1) Dredging, clearing the flow, handling blockages and shallows in Dai Hung canal; (2) Dredging, clearing the flow, handling blockages and shallow areas of Tan Hung Hong canal, branch 1; (3) Dredging, clearing the flow, handling blockages and shallows in the suction canal of Dong Hoa pumping station of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY with 4 bidding package.
24/09/2024 10:50
The Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted the request Project: Irrigation canal behind An Hoa pumping station. Item: Clearing grass, dredging, embanking the canal adjacent to the hard canal to Hoa Phong canal of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY with 4 bidding package.
18/09/2024 15:26
The data sheet has been partially hidden, to see the full information please Login or Register
AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY announced the results of the bid package Civil Works .
- Winning bidder: HUNG LONG KHANH COMPANY LIMITED
29/10/2024 08:14
AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY announced the results of the bidding package Civil Works with 1 participating contractors .
26/10/2024 15:29
AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY announced the results of the bidding package Tender package No 03: Construction work with 1 participating contractors .
24/10/2024 16:57
AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY announced the results of the bidding package Civil Works with 1 participating contractors .
20/10/2024 12:05
AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY publishes Tender Notice Civil Works in the form Open bidding .
17/10/2024 14:36
AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY announced the results of the bid package Civil Works .
- Winning bidder: HUNG LONG KHANH COMPANY LIMITED
16/10/2024 14:44
AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY publishes Tender Notice Tender package No 03: Construction work in the form Open bidding .
15/10/2024 16:28
AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY publishes Tender Notice Civil Works in the form Open bidding .
10/10/2024 14:28
AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY publishes the plan Canal behind Kieu Thuong sewer. Item: Upgrading arch sewer 2 (KT.QK2) with 4 bidding package .
07/10/2024 08:40
AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY announced the results of the bidding package Civil Works with 1 participating contractors .
04/10/2024 15:35
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted the results of the bidding package Civil Works of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY.
- Winning bidder: HUNG LONG KHANH COMPANY LIMITED
29/10/2024 08:14
Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted Tender Notice Civil Works of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY with the form Open bidding.
17/10/2024 14:36
The Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted the results of the bidding package Civil Works of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY.
- Winning bidder: HUNG LONG KHANH COMPANY LIMITED
16/10/2024 14:44
Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted Tender Notice Tender package No 03: Construction work of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY with the form Open bidding.
15/10/2024 16:28
Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted Tender Notice Civil Works of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY with the form Open bidding.
10/10/2024 14:28
The Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted the request Canal behind Kieu Thuong sewer. Item: Upgrading arch sewer 2 (KT.QK2) of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY with 4 bidding package.
07/10/2024 08:40
The Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted the request Project: An Kim Hai canal branch 2. Items: (1) Dredging and embanking the canal section from Dang Cuong pumping station to Nguyen Truong To street; (2) Dredging the canal bed from Bach Mai dam to Nguyen Van Linh street of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY with 4 bidding package.
27/09/2024 14:50
Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted Tender Notice Civil Works of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY with the form Open bidding.
25/09/2024 11:24
The Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted the request Project: Dredging, clearing the flow, handling blockages and shallows in Dai Hung canal, Tan Hung Hong canal branch 1 and suction canal of Dong Hoa pumping station. Items: (1) Dredging, clearing the flow, handling blockages and shallows in Dai Hung canal; (2) Dredging, clearing the flow, handling blockages and shallow areas of Tan Hung Hong canal, branch 1; (3) Dredging, clearing the flow, handling blockages and shallows in the suction canal of Dong Hoa pumping station of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY with 4 bidding package.
24/09/2024 10:50
The Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted the request Project: Irrigation canal behind An Hoa pumping station. Item: Clearing grass, dredging, embanking the canal adjacent to the hard canal to Hoa Phong canal of the investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY with 4 bidding package.
18/09/2024 15:26
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted 8 of the contractor selection plan, which contains 34 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted 9 Tender Notice in the 9 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has posted 9 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 9 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY is the investor of 9 package, of which 9 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY is the owner of 7 contractor selection plan. In which, they self-invite 7 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY is an investor with 5 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor AN HAI EXPLOITING IRRIGATION ONE MEMBER LIMITED COMPANY is the investor of 4 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code