Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY as follows:
- Has relationships with 12 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 38 contractor selection plans with a total of 156 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 40 packages (with 41 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 31 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 126 packages that have not fully posted the contractor selection results. Of these 121 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0.96 contractors.
- Breakdown by bidding field: Goods 2.44%, Construction 97.56%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 156,044,075,080 VND, of which the total winning bid value is: 155,456,684,525 VND.
- The savings rate is: 0.38%.
Data analysis results of DauThau.info software for bid solicitors B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY as follows:
- Has relationships with 12 contractor.
- The average number of contractors participating in each bidding package is: 0.96 contractors.
- Proportion of bidding fields: Goods 2.44%, Construction 97.56%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 156,044,075,080 VND, in which the total winning value is: 155,456,684,525 VND.
- The savings rate is: 0.38%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 1 Contractor selection plan in which 1 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 1 bidding packages in which 1 packages are self-invited, and 0 packages are invited by other units.
You need to Login or Sign up to view all informations.
- Participated in 2 bidding packages, of which 2 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 0% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.91% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hải Phòng (2)
- Has relationships with 2 Bid Solicitors
- Has competed against 2 contractors in 2 bidding packages, won 2 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 2 contractors in 2 bidding packages, won 2 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
30/07/2022 15:10
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
30/07/2022 02:19
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
30/07/2022 02:03
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
30/07/2022 01:41
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
30/07/2022 01:36
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
30/07/2022 01:28
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
30/07/2022 01:24
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
30/07/2022 01:19
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
- Winning bidder: Công ty cổ phần xây dựng Bạch Đằng
30/07/2022 01:08
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
- Winning bidder: Công ty cổ phần xây dựng Bạch Đằng
30/07/2022 01:03
The data sheet has been partially hidden, to see the full information please Login or Register
B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY announced the results of the bid package Construction .
- Winning bidder: Công ty TNHH xây dựng và thương mại Thiên Lâm
30/07/2022 15:10
B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY announced the results of the bid package Construction .
- Winning bidder: Công ty TNHH xây dựng và thương mại Thiên Lâm
30/07/2022 02:19
B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY announced the results of the bid package Construction .
- Winning bidder: Công ty TNHH Đầu tư và Thương mại Hưng Cường
30/07/2022 02:03
B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY announced the results of the bidding package Construction with 1 participating contractors .
30/07/2022 02:00
B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY announced the results of the bid package Construction .
- Winning bidder: Công ty TNHH Đầu tư và Thương mại Hưng Cường
30/07/2022 01:41
B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY announced the results of the bid package Construction .
- Winning bidder: Công ty TNHH Đầu tư và Thương mại Hưng Cường
30/07/2022 01:36
B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY announced the results of the bid package Construction .
- Winning bidder: Công ty TNHH xây dựng và thương mại Thiên Lâm
30/07/2022 01:28
B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY announced the results of the bid package Construction .
- Winning bidder: Công ty TNHH xây dựng và thương mại Thiên Lâm
30/07/2022 01:24
B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY announced the results of the bid package Construction .
- Winning bidder: Công ty cổ phần xây dựng Bạch Đằng
30/07/2022 01:19
B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY announced the results of the bid package Construction .
- Winning bidder: Công ty cổ phần xây dựng Bạch Đằng
30/07/2022 01:08
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
30/07/2022 15:10
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
30/07/2022 02:19
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
30/07/2022 02:03
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
30/07/2022 01:41
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
30/07/2022 01:36
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
30/07/2022 01:28
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
30/07/2022 01:24
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
30/07/2022 01:19
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
- Winning bidder: Công ty cổ phần xây dựng Bạch Đằng
30/07/2022 01:08
The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted the results of the bidding package Construction of the investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY.
- Winning bidder: Công ty cổ phần xây dựng Bạch Đằng
30/07/2022 01:03
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted 38 of the contractor selection plan, which contains 156 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted 41 Tender Notice in the 40 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has posted 31 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 31 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has a relationship with 12 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY is the investor of 1 package, of which 1 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY is the owner of 1 contractor selection plan. In which, they self-invite 1 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY is an investor with 10 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor B.I.M TECHNOLOGY ARCHITECTURE JOINT STOCK COMPANY is the investor of 0 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code