Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Project management traffic Phu Tho as follows:
- Has relationships with 0 project owners.
- Has relationships with 2 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 100.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 827,371,000 VND, of which the total winning bid value is: 628,165,000 VND.
- The savings rate is: 24.08%.
Data analysis results of DauThau.info software for bid solicitors Project management traffic Phu Tho as follows:
- Has relationships with 2 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 100.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 827,371,000 VND, in which the total winning value is: 628,165,000 VND.
- The savings rate is: 24.08%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Package 05: Surveying, measuring, drawing up land acquisition and allocation, planting ground clearance landmarks for construction works: Renovating and upgrading DT.316B Tan Phuong - Hung Hoa section (for km0 section) +000 - km4+200, from Tan Phuong commune to Dao Xa commune - Thanh Thuy district) of the investor Project management traffic Phu Tho.
03/01/2017 10:42
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Package 08: Construction insurance: Renovating and upgrading DT.316B section Tan Phuong - Hung Hoa (for the section km0+000 - km4+200, from Tan Phuong commune to Dao Xa commune - Thanh Thuy district). ) of the investor Project management traffic Phu Tho.
29/12/2016 09:08
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Package 10: Consulting on traffic safety inspection before putting the project into operation of the investor Project management traffic Phu Tho.
- Winning bidder: Viện chuyên ngành đường bộ và sân bay - Viện khoa học và công nghệ giao thông vận tải
26/09/2016 15:46
The data sheet has been partially hidden, to see the full information please Login or Register
Project management traffic Phu Tho announced the results of the bid package Package 05: Surveying, measuring, drawing up land acquisition and allocation, planting ground clearance landmarks for construction works: Renovating and upgrading DT.316B Tan Phuong - Hung Hoa section (for km0 section) +000 - km4+200, from Tan Phuong commune to Dao Xa commune - Thanh Thuy district) .
- Winning bidder: Công ty cổ phần khảo sát đo đạc Anh Thư
03/01/2017 10:42
Project management traffic Phu Tho announced the results of the bid package Package 08: Construction insurance: Renovating and upgrading DT.316B section Tan Phuong - Hung Hoa (for the section km0+000 - km4+200, from Tan Phuong commune to Dao Xa commune - Thanh Thuy district). ) .
- Winning bidder: Công ty Bảo Minh Phú Thọ - Tổng công ty cổ phần Bảo Minh
29/12/2016 09:08
Project management traffic Phu Tho announced the results of the bid package Package 10: Consulting on traffic safety inspection before putting the project into operation .
- Winning bidder: Viện chuyên ngành đường bộ và sân bay - Viện khoa học và công nghệ giao thông vận tải
26/09/2016 15:46
Project management traffic Phu Tho publishes Tender Notice Construction work (Package 1) in the form National competitive bidding .
07/03/2014 08:11
Project management traffic Phu Tho publishes Tender Notice Surveying and making construction investment projects in the form National competitive bidding .
15/12/2011 11:11
Project management traffic Phu Tho publishes Tender Notice Construction and installation of section Km0+00-Km3+00 (Bid Tender package No 1); Construction and installation of section Km3+00-Km6+600 (Bid Tender package No 2). in the form National competitive bidding .
25/10/2011 16:07
Project management traffic Phu Tho publishes Tender Notice RT3-20-06-01-1-1: Periodic maintenance of roads in Cam Khe district in the form National competitive bidding .
28/04/2011 10:03
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Package 05: Surveying, measuring, drawing up land acquisition and allocation, planting ground clearance landmarks for construction works: Renovating and upgrading DT.316B Tan Phuong - Hung Hoa section (for km0 section) +000 - km4+200, from Tan Phuong commune to Dao Xa commune - Thanh Thuy district) of the investor Project management traffic Phu Tho.
03/01/2017 10:42
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Package 08: Construction insurance: Renovating and upgrading DT.316B section Tan Phuong - Hung Hoa (for the section km0+000 - km4+200, from Tan Phuong commune to Dao Xa commune - Thanh Thuy district). ) of the investor Project management traffic Phu Tho.
29/12/2016 09:08
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Package 10: Consulting on traffic safety inspection before putting the project into operation of the investor Project management traffic Phu Tho.
- Winning bidder: Viện chuyên ngành đường bộ và sân bay - Viện khoa học và công nghệ giao thông vận tải
26/09/2016 15:46
The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Project management traffic Phu Tho has posted 1 Tender Notices in 1 bidding packages. Among these, -3 Tender Notices were self-invited, and 4 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project management traffic Phu Tho has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Project management traffic Phu Tho has a relationship with 2 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects