Data analysis results of DauThau.info software for bid solicitors Ban quản lý, bảo trì công trình đường bộ as follows:
- Has relationships with 22 contractor.
- Announced 46 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 74 contractor selection plans with a total of 117 bidding packages, of which 9 prequalification documents have not found the investment project.
- Has invited bids for 7 packages (with 7 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 97 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 90 packages with results that do not have tender notice or prequalification notice.
- There are 12 packages that have not fully posted the contractor selection results. Of these 8 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.86 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 100.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 11,092,929,373 VND, of which the total winning bid value is: 10,265,344,000 VND.
- The savings rate is: 7.46%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý, bảo trì công trình đường bộ as follows:
- Has relationships with 22 contractor.
- The average number of contractors participating in each bidding package is: 1.86 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 100.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 11,092,929,373 VND, in which the total winning value is: 10,265,344,000 VND.
- The savings rate is: 7.46%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 46 investment and development projects.
- As the owner of 84 Contractor selection plan in which 74 Contractor selection plan is self-published, and 10 Contractor selection plan is posted by other units.
- Being the investor of 63 bidding packages in which 7 packages are self-invited, and 56 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban quản lý, bảo trì công trình đường bộ has posted the results of the bidding package Prepare bidding documents for construction repair bidding packages of the investor Ban quản lý, bảo trì công trình đường bộ.
- Winning bidder: BINH AN SERVICES CONSULTING INVESTMENT COMPANY LIMITED
15/10/2024 11:04
The Bid solicitor Ban quản lý, bảo trì công trình đường bộ has posted the request Unscheduled repair to prevent erosion of pillar T2 of An Hoa bridge Km37+677, National Highway 57B, Ben Tre province of the investor Ban quản lý, bảo trì công trình đường bộ with 5 bidding package.
03/10/2024 08:46
Ban quản lý, bảo trì công trình đường bộ Posted Development Investment Project Unscheduled repair to prevent erosion of pillar T2 of An Hoa bridge Km37+677, National Highway 57B, Ben Tre province.
03/10/2024 08:08
The Bid solicitor Ban quản lý, bảo trì công trình đường bộ has posted the request Contractor selection plan, consulting package for preparing bidding documents, evaluating bids and survey packages, preparing construction drawing designs - project estimates Repairing damage to the foundation, road surface, system Drainage system and completion of traffic safety system, section Km91+470 - Km97+100, National Highway 57, Ben Tre province of the investor Ban quản lý, bảo trì công trình đường bộ with 2 bidding package.
02/10/2024 15:59
Ban quản lý, bảo trì công trình đường bộ Posted Development Investment Project Repair damage to the foundation, road surface, drainage system and complete the traffic safety system at section Km91+470 - Km97+100, National Highway 57, Ben Tre province.
02/10/2024 15:15
The Bid solicitor Ban quản lý, bảo trì công trình đường bộ has posted the results of the bidding package Prepare and Evaluate Tender documents of the investor Ban quản lý, bảo trì công trình đường bộ.
- Winning bidder: VIET TRI TIN TRADING SERVICES COMPANY LIMITED
16/08/2024 08:12
The Bid solicitor Ban quản lý, bảo trì công trình đường bộ has posted the request Plan for selecting contractors for repairing reinforced curbs and road surface from Km0+000 (adjacent to National Highway 57) - Km3+000, adding drainage system Km0+000 - Km2+000, DH.93 , Thanh Phu district of the investor Ban quản lý, bảo trì công trình đường bộ with 2 bidding package.
14/08/2024 08:45
Ban quản lý, bảo trì công trình đường bộ Posted Development Investment Project Repair reinforced curbs, road surface section from Km0+000 (adjacent to National Highway 57) - Km3+000, supplement drainage system Km0+000 - Km2+000, DH.93, Thanh Phu district.
14/08/2024 08:08
The Bid solicitor Ban quản lý, bảo trì công trình đường bộ has posted the results of the bidding package Consulting on preparing bidding documents, evaluating bidding documents for survey consulting packages, and preparing technical and economic reports of the investor Ban quản lý, bảo trì công trình đường bộ.
- Winning bidder: TOAN TAM MANAGEMENT CONSTRUCTION AND CONSULTING LIMITED COMPANY
07/08/2024 08:48
The Bid solicitor Ban quản lý, bảo trì công trình đường bộ has posted the results of the bidding package Consulting on setting up bidding documents, evaluating bids for survey consultancy bidding packages, making technical reports of the investor Ban quản lý, bảo trì công trình đường bộ.
- Winning bidder: TOAN TAM MANAGEMENT CONSTRUCTION AND CONSULTING LIMITED COMPANY
07/08/2024 08:46
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý, bảo trì công trình đường bộ announced the results of the bid package Prepare bidding documents for construction repair bidding packages .
- Winning bidder: BINH AN SERVICES CONSULTING INVESTMENT COMPANY LIMITED
15/10/2024 11:04
Ban quản lý, bảo trì công trình đường bộ publishes the plan Unscheduled repair to prevent erosion of pillar T2 of An Hoa bridge Km37+677, National Highway 57B, Ben Tre province with 5 bidding package .
03/10/2024 08:46
Ban quản lý, bảo trì công trình đường bộ publishes the plan Contractor selection plan, consulting package for preparing bidding documents, evaluating bids and survey packages, preparing construction drawing designs - project estimates Repairing damage to the foundation, road surface, system Drainage system and completion of traffic safety system, section Km91+470 - Km97+100, National Highway 57, Ben Tre province with 2 bidding package .
02/10/2024 15:59
Ban quản lý, bảo trì công trình đường bộ announced the results of the bid package Prepare and Evaluate Tender documents .
- Winning bidder: VIET TRI TIN TRADING SERVICES COMPANY LIMITED
16/08/2024 08:12
Ban quản lý, bảo trì công trình đường bộ publishes the plan Plan for selecting contractors for repairing reinforced curbs and road surface from Km0+000 (adjacent to National Highway 57) - Km3+000, adding drainage system Km0+000 - Km2+000, DH.93 , Thanh Phu district with 2 bidding package .
14/08/2024 08:45
Ban quản lý, bảo trì công trình đường bộ announced the results of the bid package Consulting on preparing bidding documents, evaluating bidding documents for survey consulting packages, and preparing technical and economic reports .
- Winning bidder: TOAN TAM MANAGEMENT CONSTRUCTION AND CONSULTING LIMITED COMPANY
07/08/2024 08:48
Ban quản lý, bảo trì công trình đường bộ announced the results of the bid package Consulting on setting up bidding documents, evaluating bids for survey consultancy bidding packages, making technical reports .
- Winning bidder: TOAN TAM MANAGEMENT CONSTRUCTION AND CONSULTING LIMITED COMPANY
07/08/2024 08:46
Ban quản lý, bảo trì công trình đường bộ announced the results of the bid package Consulting on setting up bidding documents, evaluating bids for survey consultancy bidding packages, making technical reports .
- Winning bidder: BINH AN SERVICES CONSULTING INVESTMENT COMPANY LIMITED
07/08/2024 08:43
Ban quản lý, bảo trì công trình đường bộ announced the results of the bid package Consulting on setting up bidding documents, evaluating bids for survey consultancy bidding packages, making technical reports .
- Winning bidder: VIET TRI TIN TRADING SERVICES COMPANY LIMITED
07/08/2024 08:41
Ban quản lý, bảo trì công trình đường bộ announced the results of the bid package Consulting on setting up bidding documents, evaluating bids for survey consultancy bidding packages, making technical reports .
- Winning bidder: VIET TRI TIN TRADING SERVICES COMPANY LIMITED
07/08/2024 08:39
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý, bảo trì công trình đường bộ has posted the results of the bidding package Prepare bidding documents for construction repair bidding packages of the investor Ban quản lý, bảo trì công trình đường bộ.
- Winning bidder: BINH AN SERVICES CONSULTING INVESTMENT COMPANY LIMITED
15/10/2024 11:04
The Bid solicitor Ban quản lý, bảo trì công trình đường bộ has posted the request Unscheduled repair to prevent erosion of pillar T2 of An Hoa bridge Km37+677, National Highway 57B, Ben Tre province of the investor Ban quản lý, bảo trì công trình đường bộ with 5 bidding package.
03/10/2024 08:46
Ban quản lý, bảo trì công trình đường bộ Posted Development Investment Project Unscheduled repair to prevent erosion of pillar T2 of An Hoa bridge Km37+677, National Highway 57B, Ben Tre province.
03/10/2024 08:08
The Bid solicitor Ban quản lý, bảo trì công trình đường bộ has posted the request Contractor selection plan, consulting package for preparing bidding documents, evaluating bids and survey packages, preparing construction drawing designs - project estimates Repairing damage to the foundation, road surface, system Drainage system and completion of traffic safety system, section Km91+470 - Km97+100, National Highway 57, Ben Tre province of the investor Ban quản lý, bảo trì công trình đường bộ with 2 bidding package.
02/10/2024 15:59
Ban quản lý, bảo trì công trình đường bộ Posted Development Investment Project Repair damage to the foundation, road surface, drainage system and complete the traffic safety system at section Km91+470 - Km97+100, National Highway 57, Ben Tre province.
02/10/2024 15:15
The Bid solicitor Ban quản lý, bảo trì công trình đường bộ has posted the results of the bidding package Prepare and Evaluate Tender documents of the investor Ban quản lý, bảo trì công trình đường bộ.
- Winning bidder: VIET TRI TIN TRADING SERVICES COMPANY LIMITED
16/08/2024 08:12
The Bid solicitor Ban quản lý, bảo trì công trình đường bộ has posted the request Plan for selecting contractors for repairing reinforced curbs and road surface from Km0+000 (adjacent to National Highway 57) - Km3+000, adding drainage system Km0+000 - Km2+000, DH.93 , Thanh Phu district of the investor Ban quản lý, bảo trì công trình đường bộ with 2 bidding package.
14/08/2024 08:45
Ban quản lý, bảo trì công trình đường bộ Posted Development Investment Project Repair reinforced curbs, road surface section from Km0+000 (adjacent to National Highway 57) - Km3+000, supplement drainage system Km0+000 - Km2+000, DH.93, Thanh Phu district.
14/08/2024 08:08
The Bid solicitor Ban quản lý, bảo trì công trình đường bộ has posted the results of the bidding package Consulting on preparing bidding documents, evaluating bidding documents for survey consulting packages, and preparing technical and economic reports of the investor Ban quản lý, bảo trì công trình đường bộ.
- Winning bidder: TOAN TAM MANAGEMENT CONSTRUCTION AND CONSULTING LIMITED COMPANY
07/08/2024 08:48
The Bid solicitor Ban quản lý, bảo trì công trình đường bộ has posted the results of the bidding package Consulting on setting up bidding documents, evaluating bids for survey consultancy bidding packages, making technical reports of the investor Ban quản lý, bảo trì công trình đường bộ.
- Winning bidder: TOAN TAM MANAGEMENT CONSTRUCTION AND CONSULTING LIMITED COMPANY
07/08/2024 08:46
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý, bảo trì công trình đường bộ has posted 74 of the contractor selection plan, which contains 117 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý, bảo trì công trình đường bộ has posted 7 Tender Notice in the 7 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý, bảo trì công trình đường bộ has posted 97 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 97 package, canceled the bid 0 package (among the bidding packages above).
- There are 90 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý, bảo trì công trình đường bộ has a relationship with 22 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý, bảo trì công trình đường bộ has a relationship with 2 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý, bảo trì công trình đường bộ is the investor of 63 package, of which 7 package is self-invited, other units invite bid 56 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý, bảo trì công trình đường bộ is the owner of 84 contractor selection plan. In which, they self-invite 74 of contractor selection plan, other units invite bids of 10 of contractor selection plan.
Summary: Investor Ban quản lý, bảo trì công trình đường bộ is an investor with 63 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý, bảo trì công trình đường bộ is the investor of 46 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code