Data analysis results of DauThau.info software for bid solicitors Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông as follows:
- Has relationships with 39 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 60 contractor selection plans with a total of 221 bidding packages, of which 6 prequalification documents have not found the investment project.
- Has invited bids for 43 packages (with 44 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 5 package, and canceled bids for 1 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 159 packages that have not fully posted the contractor selection results. Of these 158 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.33 contractors.
- Breakdown by bidding field: Goods 9.09%, Construction 86.36%, Consultancy 4.55%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 8,919,811,000 VND, of which the total winning bid value is: 7,165,147,000 VND.
- The savings rate is: 19.67%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông as follows:
- Has relationships with 39 contractor.
- The average number of contractors participating in each bidding package is: 1.33 contractors.
- Proportion of bidding fields: Goods 9.09%, Construction 86.36%, Consulting 4.55%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 8,919,811,000 VND, in which the total winning value is: 7,165,147,000 VND.
- The savings rate is: 19.67%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 6 Contractor selection plan in which 6 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 0 bidding packages in which 0 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted the request Office of the Center for Culture, Sports and Broadcasting of Tan Phu Dong District of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông with 2 bidding package.
02/08/2022 08:08
The Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted the request Phu Dong Primary School, Tan Phu Dong District of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông with 2 bidding package.
01/08/2022 14:50
The Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted the request Installation of public lighting system Provincial road 872B (section from Tan Long ferry terminal - Phu Thanh junction) and provincial road section through the central area of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông with 5 bidding package.
01/08/2022 14:42
The Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted the request District Road 84B (Vam Giong Ferry Wharf) of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông with 5 bidding package.
01/08/2022 14:27
The Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted the request Repairing school points in the district in 2022 of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông with 3 bidding package.
23/06/2022 07:58
Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông Posted Development Investment Project Repairing school points in the district in 2022.
23/06/2022 07:00
Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted Tender Notice Package 3: Construction of Vo Van Hen Canal Bridge (next to Iron Bridge 1) of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông with the form National Competitive Bidding.
20/09/2019 15:57
The Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted the results of the bidding package Package 3: Construction of Vo Van Hen Canal Bridge (next to Iron Bridge 1) of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông.
- Winning bidder: There are no winning bidders
30/08/2019 11:00
Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted Tender Notice New construction of cultural and sports center in Tan Thoi commune of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông with the form National Competitive Bidding.
23/08/2019 11:35
Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted Tender Notice Tender package No 3: Construction of Ban Ranh Bridge 2 of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông with the form National Competitive Bidding.
23/08/2019 11:30
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông publishes the plan Office of the Center for Culture, Sports and Broadcasting of Tan Phu Dong District with 2 bidding package .
02/08/2022 08:08
Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông publishes the plan Phu Dong Primary School, Tan Phu Dong District with 2 bidding package .
01/08/2022 14:50
Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông publishes the plan Installation of public lighting system Provincial road 872B (section from Tan Long ferry terminal - Phu Thanh junction) and provincial road section through the central area with 5 bidding package .
01/08/2022 14:42
Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông publishes the plan District Road 84B (Vam Giong Ferry Wharf) with 5 bidding package .
01/08/2022 14:27
Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông publishes the plan Repairing school points in the district in 2022 with 3 bidding package .
23/06/2022 07:58
Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông announced the results of the bidding package Package 3: Construction of Vo Van Hen Canal Bridge (next to Iron Bridge 1) with 1 participating contractors .
27/09/2019 16:04
Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông publishes Tender Notice Package 3: Construction of Vo Van Hen Canal Bridge (next to Iron Bridge 1) in the form National Competitive Bidding .
20/09/2019 15:57
Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông announced the results of the bidding package Package 3: Construction of Cua Trung - Tan Hoa river road (section 2) with 4 participating contractors .
30/08/2019 11:04
Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông announced the results of the bid package Package 3: Construction of Vo Van Hen Canal Bridge (next to Iron Bridge 1) .
- Winning bidder: There are no winning bidders
30/08/2019 11:00
Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông publishes Tender Notice New construction of cultural and sports center in Tan Thoi commune in the form National Competitive Bidding .
23/08/2019 11:35
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted the request Office of the Center for Culture, Sports and Broadcasting of Tan Phu Dong District of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông with 2 bidding package.
02/08/2022 08:08
The Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted the request Phu Dong Primary School, Tan Phu Dong District of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông with 2 bidding package.
01/08/2022 14:50
The Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted the request Installation of public lighting system Provincial road 872B (section from Tan Long ferry terminal - Phu Thanh junction) and provincial road section through the central area of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông with 5 bidding package.
01/08/2022 14:42
The Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted the request District Road 84B (Vam Giong Ferry Wharf) of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông with 5 bidding package.
01/08/2022 14:27
The Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted the request Repairing school points in the district in 2022 of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông with 3 bidding package.
23/06/2022 07:58
Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông Posted Development Investment Project Repairing school points in the district in 2022.
23/06/2022 07:00
Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted Tender Notice Package 3: Construction of Vo Van Hen Canal Bridge (next to Iron Bridge 1) of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông with the form National Competitive Bidding.
20/09/2019 15:57
The Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted the results of the bidding package Package 3: Construction of Vo Van Hen Canal Bridge (next to Iron Bridge 1) of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông.
- Winning bidder: There are no winning bidders
30/08/2019 11:00
Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted Tender Notice New construction of cultural and sports center in Tan Thoi commune of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông with the form National Competitive Bidding.
23/08/2019 11:35
Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted Tender Notice Tender package No 3: Construction of Ban Ranh Bridge 2 of the investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông with the form National Competitive Bidding.
23/08/2019 11:30
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted 60 of the contractor selection plan, which contains 221 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted 44 Tender Notice in the 43 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 1 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has a relationship with 39 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông is the owner of 6 contractor selection plan. In which, they self-invite 6 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông is an investor with 3 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý các dự án đầu tư và xây dựng huyện Tân Phú Đông is the investor of 0 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register