Data analysis results of DauThau.info software for bid solicitors Ban Quản lý Cảng Phú Quý as follows:
- Has relationships with 1 project owners.
- Has relationships with 7 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 16 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 9 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 7 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 990,170,821 VND, of which the total winning bid value is: 990,170,348 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý Cảng Phú Quý as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 990,170,821 VND, in which the total winning value is: 990,170,348 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban Quản lý Cảng Phú Quý are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 8 contractor selection plans, of which 7 were self-published, and 1 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the results of the bidding package Surveying the depth of the depth to notify the maritime area of Phu Quy port area in service of the announcement of the maritime periodically by 2025 of the investor Ban Quản lý Cảng Phú Quý.
12/05/2025 16:21
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the request The decision on the approval of estimates and plans for selecting contractors to survey the depth of the depth to notify the maritime area of Phu Quy port area in service of the periodic maritime notice in 2025 of the investor Ban Quản lý Cảng Phú Quý with 1 bidding package.
12/05/2025 15:56
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the results of the bidding package Package No. 02: Project management costs for Package No. 01 of the investor Ban Quản lý Cảng Phú Quý.
- Winning bidder: TRIEU TIN CONSTRUCTION CONSULTING COMPANY LIMITED
01/11/2023 20:59
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the results of the bidding package Package 01: Construction and installation of the whole project (including contingency costs) of the investor Ban Quản lý Cảng Phú Quý.
- Winning bidder: DOANH NGHIỆP TN XÂY LẮP - THƯƠNG MẠI HOÀNG PHÚ QUỐC
01/11/2023 20:49
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the request Repair of 400DWT berth wharf surface, damage to 1000DWT berth barrier, damage to west dyke fence of the investor Ban Quản lý Cảng Phú Quý with 3 bidding package.
23/10/2023 19:01
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the request Repair of 400DWT berth wharf surface, damage to 1000DWT berth barrier, damage to west dyke fence of the investor Ban Quản lý Cảng Phú Quý with 3 bidding package.
23/10/2023 18:41
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the request Repair of 400DWT berth wharf surface, damage to 1000DWT berth barrier, damage to west dyke fence of the investor Ban Quản lý Cảng Phú Quý with 3 bidding package.
23/10/2023 18:34
Investor Ban Quản lý Cảng Phú Quý has posted an investment and development project Repair of 400DWT berth wharf surface, damage to 1000DWT berth barrier, damage to west dyke fence.
23/10/2023 18:18
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the results of the bidding package Package No. 02: Consulting on verification of economic and technical reports on construction investment of the investor Ban Quản lý Cảng Phú Quý.
- Winning bidder: Trường Thành Design - Construction Trade Joint Stock Company
27/09/2023 21:54
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the results of the bidding package Package No. 01: Survey consulting, preparation of technical and economic reports for construction investment of the investor Ban Quản lý Cảng Phú Quý.
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG ATP
20/09/2023 17:34
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý Cảng Phú Quý announced the results of the bid package Surveying the depth of the depth to notify the maritime area of Phu Quy port area in service of the announcement of the maritime periodically by 2025 .
- Winning bidder:
12/05/2025 16:21
Ban Quản lý Cảng Phú Quý publishes the plan The decision on the approval of estimates and plans for selecting contractors to survey the depth of the depth to notify the maritime area of Phu Quy port area in service of the periodic maritime notice in 2025 with 1 bidding package .
12/05/2025 15:56
Ban Quản lý Cảng Phú Quý announced the results of the bid package Package No. 02: Project management costs for Package No. 01 .
- Winning bidder: TRIEU TIN CONSTRUCTION CONSULTING COMPANY LIMITED
01/11/2023 20:59
Ban Quản lý Cảng Phú Quý announced the results of the bid package Package 01: Construction and installation of the whole project (including contingency costs) .
- Winning bidder: DOANH NGHIỆP TN XÂY LẮP - THƯƠNG MẠI HOÀNG PHÚ QUỐC
01/11/2023 20:49
Ban Quản lý Cảng Phú Quý publishes the plan Repair of 400DWT berth wharf surface, damage to 1000DWT berth barrier, damage to west dyke fence with 3 bidding package .
23/10/2023 19:01
Ban Quản lý Cảng Phú Quý publishes the plan Repair of 400DWT berth wharf surface, damage to 1000DWT berth barrier, damage to west dyke fence with 3 bidding package .
23/10/2023 18:41
Ban Quản lý Cảng Phú Quý publishes the plan Repair of 400DWT berth wharf surface, damage to 1000DWT berth barrier, damage to west dyke fence with 3 bidding package .
23/10/2023 18:34
Ban Quản lý Cảng Phú Quý announced the results of the bid package Package No. 02: Consulting on verification of economic and technical reports on construction investment .
- Winning bidder: Trường Thành Design - Construction Trade Joint Stock Company
27/09/2023 21:54
Ban Quản lý Cảng Phú Quý announced the results of the bid package Package No. 01: Survey consulting, preparation of technical and economic reports for construction investment .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG ATP
20/09/2023 17:34
Ban Quản lý Cảng Phú Quý publishes the plan Consulting on surveys, preparing technical economic reports and consulting on verifying technical economic reports on investment in construction projects: Repairing 400DWT berth wharf panels; Damage to the 1000DWT wharf barrier, damage to the fence on the West Dyke with 2 bidding package .
12/09/2023 22:02
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the results of the bidding package Surveying the depth of the depth to notify the maritime area of Phu Quy port area in service of the announcement of the maritime periodically by 2025 of the investor Ban Quản lý Cảng Phú Quý.
12/05/2025 16:21
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the request The decision on the approval of estimates and plans for selecting contractors to survey the depth of the depth to notify the maritime area of Phu Quy port area in service of the periodic maritime notice in 2025 of the investor Ban Quản lý Cảng Phú Quý with 1 bidding package.
12/05/2025 15:56
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the results of the bidding package Package No. 02: Project management costs for Package No. 01 of the investor Ban Quản lý Cảng Phú Quý.
- Winning bidder: TRIEU TIN CONSTRUCTION CONSULTING COMPANY LIMITED
01/11/2023 20:59
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the results of the bidding package Package 01: Construction and installation of the whole project (including contingency costs) of the investor Ban Quản lý Cảng Phú Quý.
- Winning bidder: DOANH NGHIỆP TN XÂY LẮP - THƯƠNG MẠI HOÀNG PHÚ QUỐC
01/11/2023 20:49
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the request Repair of 400DWT berth wharf surface, damage to 1000DWT berth barrier, damage to west dyke fence of the investor Ban Quản lý Cảng Phú Quý with 3 bidding package.
23/10/2023 19:01
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the request Repair of 400DWT berth wharf surface, damage to 1000DWT berth barrier, damage to west dyke fence of the investor Ban Quản lý Cảng Phú Quý with 3 bidding package.
23/10/2023 18:41
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the request Repair of 400DWT berth wharf surface, damage to 1000DWT berth barrier, damage to west dyke fence of the investor Ban Quản lý Cảng Phú Quý with 3 bidding package.
23/10/2023 18:34
Investor Ban Quản lý Cảng Phú Quý has posted an investment and development project Repair of 400DWT berth wharf surface, damage to 1000DWT berth barrier, damage to west dyke fence.
23/10/2023 18:18
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the results of the bidding package Package No. 02: Consulting on verification of economic and technical reports on construction investment of the investor Ban Quản lý Cảng Phú Quý.
- Winning bidder: Trường Thành Design - Construction Trade Joint Stock Company
27/09/2023 21:54
The Bid solicitor Ban Quản lý Cảng Phú Quý has posted the results of the bidding package Package No. 01: Survey consulting, preparation of technical and economic reports for construction investment of the investor Ban Quản lý Cảng Phú Quý.
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG ATP
20/09/2023 17:34
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý Cảng Phú Quý has posted 8 of the contractor selection plan, which contains 16 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý Cảng Phú Quý has posted 9 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 9 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý Cảng Phú Quý has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban Quản lý Cảng Phú Quý has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects