Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý đầu tư xây dựng công trình Quận 8 as follows:
- Has relationships with 62 contractor.
- Announced 90 investment development project, of which 4 projects have not yet announced the prequalification documents.
- Announced 118 contractor selection plans with a total of 538 bidding packages, of which 41 prequalification documents have not found the investment project.
- Has invited bids for 25 packages (with 26 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 144 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 120 packages with results that do not have tender notice or prequalification notice.
- There are 400 packages that have not fully posted the contractor selection results. Of these 400 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.50 contractors.
- Breakdown by bidding field: Goods 3.85%, Construction 88.46%, Consultancy 7.69%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 432,011,322,762 VND, of which the total winning bid value is: 428,793,531,355 VND.
- The savings rate is: 0.74%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý đầu tư xây dựng công trình Quận 8 as follows:
- Has relationships with 62 contractor.
- The average number of contractors participating in each bidding package is: 1.50 contractors.
- Proportion of bidding fields: Goods 3.85%, Construction 88.46%, Consulting 7.69%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 432,011,322,762 VND, in which the total winning value is: 428,793,531,355 VND.
- The savings rate is: 0.74%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 90 investment and development projects.
- As the owner of 239 Contractor selection plan in which 90 Contractor selection plan is self-published, and 149 Contractor selection plan is posted by other units.
- Being the investor of 66 bidding packages in which 17 packages are self-invited, and 49 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Ban Quản lý đầu tư xây dựng công trình Quận 8 Posted Development Investment Project Renovating and expanding Khanh Binh Secondary School, District 8.
09/08/2022 07:00
The Bid solicitor Ban Quản lý đầu tư xây dựng công trình Quận 8 has posted the results of the bidding package Construction and installation of substation 560KVA of the investor Ban Quản lý đầu tư xây dựng công trình Quận 8.
- Winning bidder: CÔNG TY TNHH KINH DOANH XÂY DỰNG ĐIỆN BẢO NGUYÊN
30/07/2022 11:35
The Bid solicitor Ban Quản lý đầu tư xây dựng công trình Quận 8 has posted the request Repairing and renovating Ward 2 Military Command Headquarters of the investor Ban Quản lý đầu tư xây dựng công trình Quận 8 with 5 bidding package.
11/09/2020 10:04
Ban Quản lý đầu tư xây dựng công trình Quận 8 Posted Development Investment Project Repairing and renovating Ward 2 Military Command Headquarters.
11/09/2020 09:09
The Bid solicitor Ban Quản lý đầu tư xây dựng công trình Quận 8 has posted the results of the bidding package Consultancy on filling design construction drawings and total cost estimates of the investor Ban Quản lý đầu tư xây dựng công trình Quận 8.
- Winning bidder: Công ty TNHH Tư vấn Thiết kế Đầu tư Xây dựng Kiến Thành
28/07/2020 10:13
Ban Quản lý đầu tư xây dựng công trình Quận 8 Posted Development Investment Project Renovating and repairing Le Lai Middle School.
27/02/2020 14:14
The Bid solicitor Ban Quản lý đầu tư xây dựng công trình Quận 8 has posted the request Renovating and repairing Le Lai Middle School of the investor Ban Quản lý đầu tư xây dựng công trình Quận 8 with 3 bidding package.
27/02/2020 14:11
The Bid solicitor Ban Quản lý đầu tư xây dựng công trình Quận 8 has posted the request Plan to select contractor for road maintenance and patching works on Binh Dong Street, Ward 13, Ward 14 of the investor Ban Quản lý đầu tư xây dựng công trình Quận 8 with 1 bidding package.
19/02/2020 10:09
The Bid solicitor Ban Quản lý đầu tư xây dựng công trình Quận 8 has posted the results of the bidding package Cost of construction drawing design verification – estimate verification of the investor Ban Quản lý đầu tư xây dựng công trình Quận 8.
08/02/2020 13:56
The Bid solicitor Ban Quản lý đầu tư xây dựng công trình Quận 8 has posted the results of the bidding package Cost of topographic survey and preparation of economic and technical reports of the investor Ban Quản lý đầu tư xây dựng công trình Quận 8.
- Winning bidder: Công ty trách nhiệm hữu hạn thiết kế xây dựng Gia Minh
08/02/2020 13:50
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý đầu tư xây dựng công trình Quận 8 announced the results of the bid package Construction and installation of substation 560KVA .
- Winning bidder: CÔNG TY TNHH KINH DOANH XÂY DỰNG ĐIỆN BẢO NGUYÊN
30/07/2022 11:35
Ban Quản lý đầu tư xây dựng công trình Quận 8 publishes the plan Repairing and renovating Ward 2 Military Command Headquarters with 5 bidding package .
11/09/2020 10:04
Ban Quản lý đầu tư xây dựng công trình Quận 8 announced the results of the bid package Consultancy on filling design construction drawings and total cost estimates .
- Winning bidder: Công ty TNHH Tư vấn Thiết kế Đầu tư Xây dựng Kiến Thành
28/07/2020 10:13
Ban Quản lý đầu tư xây dựng công trình Quận 8 publishes the plan Renovating and repairing Le Lai Middle School with 3 bidding package .
27/02/2020 14:11
Ban Quản lý đầu tư xây dựng công trình Quận 8 publishes the plan Plan to select contractor for road maintenance and patching works on Binh Dong Street, Ward 13, Ward 14 with 1 bidding package .
19/02/2020 10:09
Ban Quản lý đầu tư xây dựng công trình Quận 8 announced the results of the bid package Cost of construction drawing design verification – estimate verification .
- Winning bidder: Công ty cổ phần thiết kế xây dựng Tây Nam
08/02/2020 13:56
Ban Quản lý đầu tư xây dựng công trình Quận 8 announced the results of the bid package Cost of topographic survey and preparation of economic and technical reports .
- Winning bidder: Công ty trách nhiệm hữu hạn thiết kế xây dựng Gia Minh
08/02/2020 13:50
Ban Quản lý đầu tư xây dựng công trình Quận 8 publishes the plan Plan for selection of contractors in the pre-investment stage with 2 bidding package .
05/02/2020 15:48
Ban Quản lý đầu tư xây dựng công trình Quận 8 publishes the plan Contractor selection plan in the preparation stage of the project of dredging Cau Don canal, Ward 6 with 3 bidding package .
04/02/2020 17:12
Ban Quản lý đầu tư xây dựng công trình Quận 8 publishes the plan Contractor selection plan in the project preparation phase of the project Upgrading the retaining wall of the tidal retaining wall of Ba Tang canal (section from Ba Tang bridge to alley 2805 Pham The Hien), Ward 7 with 3 bidding package .
04/02/2020 16:55
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý đầu tư xây dựng công trình Quận 8 Posted Development Investment Project Renovating and expanding Khanh Binh Secondary School, District 8.
09/08/2022 07:00
The Bid solicitor Ban Quản lý đầu tư xây dựng công trình Quận 8 has posted the results of the bidding package Construction and installation of substation 560KVA of the investor Ban Quản lý đầu tư xây dựng công trình Quận 8.
- Winning bidder: CÔNG TY TNHH KINH DOANH XÂY DỰNG ĐIỆN BẢO NGUYÊN
30/07/2022 11:35
The Bid solicitor Ban Quản lý đầu tư xây dựng công trình Quận 8 has posted the request Repairing and renovating Ward 2 Military Command Headquarters of the investor Ban Quản lý đầu tư xây dựng công trình Quận 8 with 5 bidding package.
11/09/2020 10:04
Ban Quản lý đầu tư xây dựng công trình Quận 8 Posted Development Investment Project Repairing and renovating Ward 2 Military Command Headquarters.
11/09/2020 09:09
The Bid solicitor Ban Quản lý đầu tư xây dựng công trình Quận 8 has posted the results of the bidding package Consultancy on filling design construction drawings and total cost estimates of the investor Ban Quản lý đầu tư xây dựng công trình Quận 8.
- Winning bidder: Công ty TNHH Tư vấn Thiết kế Đầu tư Xây dựng Kiến Thành
28/07/2020 10:13
Ban Quản lý đầu tư xây dựng công trình Quận 8 Posted Development Investment Project Renovating and repairing Le Lai Middle School.
27/02/2020 14:14
The Bid solicitor Ban Quản lý đầu tư xây dựng công trình Quận 8 has posted the request Renovating and repairing Le Lai Middle School of the investor Ban Quản lý đầu tư xây dựng công trình Quận 8 with 3 bidding package.
27/02/2020 14:11
The Bid solicitor Ban Quản lý đầu tư xây dựng công trình Quận 8 has posted the request Plan to select contractor for road maintenance and patching works on Binh Dong Street, Ward 13, Ward 14 of the investor Ban Quản lý đầu tư xây dựng công trình Quận 8 with 1 bidding package.
19/02/2020 10:09
The Bid solicitor Ban Quản lý đầu tư xây dựng công trình Quận 8 has posted the results of the bidding package Cost of construction drawing design verification – estimate verification of the investor Ban Quản lý đầu tư xây dựng công trình Quận 8.
08/02/2020 13:56
The Bid solicitor Ban Quản lý đầu tư xây dựng công trình Quận 8 has posted the results of the bidding package Cost of topographic survey and preparation of economic and technical reports of the investor Ban Quản lý đầu tư xây dựng công trình Quận 8.
- Winning bidder: Công ty trách nhiệm hữu hạn thiết kế xây dựng Gia Minh
08/02/2020 13:50
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý đầu tư xây dựng công trình Quận 8 has posted 118 of the contractor selection plan, which contains 538 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý đầu tư xây dựng công trình Quận 8 has posted 26 Tender Notice in the 25 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý đầu tư xây dựng công trình Quận 8 has posted 144 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 144 package, canceled the bid 0 package (among the bidding packages above).
- There are 120 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý đầu tư xây dựng công trình Quận 8 has a relationship with 62 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý đầu tư xây dựng công trình Quận 8 has a relationship with 16 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý đầu tư xây dựng công trình Quận 8 is the investor of 66 package, of which 17 package is self-invited, other units invite bid 49 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý đầu tư xây dựng công trình Quận 8 is the owner of 239 contractor selection plan. In which, they self-invite 90 of contractor selection plan, other units invite bids of 149 of contractor selection plan.
Summary: Investor Ban Quản lý đầu tư xây dựng công trình Quận 8 is an investor with 75 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý đầu tư xây dựng công trình Quận 8 is the investor of 90 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code