Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án công trình giao thông Hà Giang as follows:
- Has relationships with 6 project owners.
- Has relationships with 36 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 69 contractor selection plans with a total of 210 bidding packages, of which 23 prequalification documents have not found the investment project.
- Has invited bids for 40 packages (with 43 tender notices), and conducted prequalification for 4 packages.
- There are 3 bidding packages with content that needs clarification.
- Announced the results of 39 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 86 packages that have not fully posted the contractor selection results. Of these 81 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.30 contractors.
- Breakdown by bidding field: Goods 2.33%, Construction 41.86%, Consultancy 53.49%, Non-consultancy 2.33%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 349,240,720,744 VND, of which the total winning bid value is: 336,731,590,258 VND.
- The savings rate is: 3.58%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án công trình giao thông Hà Giang as follows:
- Has relationships with 36 contractor.
- The average number of contractors participating in each bidding package is: 1.30 contractors.
- Proportion of bidding fields: Goods 2.33%, Construction 41.86%, Consulting 53.49%, Non-consulting 2.33%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 349,240,720,744 VND, in which the total winning value is: 336,731,590,258 VND.
- The savings rate is: 3.58%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Ban Quản lý dự án công trình giao thông Hà Giang announced the results of the bidding package Package 02: Consulting survey, designing BVTC - estimating and setting up site clearance with 1 participating contractors .
29/07/2022 11:17
Ban Quản lý dự án công trình giao thông Hà Giang publishes Tender Notice Civil Works in the form National competitive bidding .
15/07/2022 15:05
Ban Quản lý dự án công trình giao thông Hà Giang publishes Tender Notice Package 02: Consulting survey, designing BVTC - estimating and setting up site clearance in the form National competitive bidding .
01/07/2022 10:55
Ban Quản lý dự án công trình giao thông Hà Giang publishes the plan Urban planning project of DT.183 renovation and upgrading project, section from Km17 - Km50+200 and Pho Cao street, Dong Yen to border with Luc Yen place, Yen Bai province with 13 bidding package .
01/07/2022 09:56
Ban Quản lý dự án công trình giao thông Hà Giang announced the results of the bidding package Package 02: Consulting, surveying, designing BVTC - cost estimate with 1 participating contractors .
29/06/2022 17:05
Ban Quản lý dự án công trình giao thông Hà Giang announced the results of the bidding package Package 04: Consulting survey to prepare the Environmental Impact Assessment Report with 1 participating contractors .
02/06/2022 09:44
Ban Quản lý dự án công trình giao thông Hà Giang publishes Tender Notice Package 02: Consulting, surveying, designing BVTC - cost estimate in the form National competitive bidding .
01/06/2022 09:52
Ban Quản lý dự án công trình giao thông Hà Giang publishes the plan Planning and construction of hard bridge project across Gam river (Yen Phu bridge) Bac Me district, Ha Giang province with 7 bidding package .
01/06/2022 09:36
Ban Quản lý dự án công trình giao thông Hà Giang announced the results of the bidding package Package 01: Survey, prepare F/S report, set up site clearance, MLG with 1 participating contractors .
16/05/2022 17:29
Ban Quản lý dự án công trình giao thông Hà Giang publishes Tender Notice Package 04: Consulting survey to prepare the Environmental Impact Assessment Report in the form National competitive bidding .
29/04/2022 16:14
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án công trình giao thông Hà Giang has posted 69 of the contractor selection plan, which contains 210 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án công trình giao thông Hà Giang posted 4 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án công trình giao thông Hà Giang has posted 43 Tender Notices in 40 bidding packages. Among these, -3 Tender Notices were self-invited, and 46 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án công trình giao thông Hà Giang has posted 39 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 39 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án công trình giao thông Hà Giang has a relationship with 36 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án công trình giao thông Hà Giang has a relationship with 3 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban Quản lý dự án công trình giao thông Hà Giang has a relationship with 10 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects