Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án công trình giao thông Nghệ An as follows:
- Has relationships with 104 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 136 contractor selection plans with a total of 397 bidding packages, of which 65 prequalification documents have not found the investment project.
- Has invited bids for 195 packages (with 213 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 144 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 19 packages with results that do not have tender notice or prequalification notice.
- There are 251 packages that have not fully posted the contractor selection results. Of these 251 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.95 contractors.
- Breakdown by bidding field: Goods 1.88%, Construction 50.70%, Consultancy 44.13%, Non-consultancy 3.29%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 6,573,605,600,253 VND, of which the total winning bid value is: 6,541,832,316,865 VND.
- The savings rate is: 0.48%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án công trình giao thông Nghệ An as follows:
- Has relationships with 104 contractor.
- The average number of contractors participating in each bidding package is: 1.95 contractors.
- Proportion of bidding fields: Goods 1.88%, Construction 50.70%, Consulting 44.13%, Non-consulting 3.29%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 6,573,605,600,253 VND, in which the total winning value is: 6,541,832,316,865 VND.
- The savings rate is: 0.48%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 1 investment and development projects.
- As the owner of 10 Contractor selection plan in which 10 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 3 bidding packages in which 3 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted the results of the bidding package Package No. 09: Construction supervision consultancy package No. 08 of the investor Ban Quản lý dự án công trình giao thông Nghệ An.
22/09/2022 11:09
The Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted the results of the bidding package Package 08: Construction of road surface and works on the route from Km9+00 - Km21+363 of the investor Ban Quản lý dự án công trình giao thông Nghệ An.
15/09/2022 16:13
Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted Tender Notice Package 08: Construction of road surface and works on the route from Km9+00 - Km21+363 of the investor Ban Quản lý dự án công trình giao thông Nghệ An with the form National competitive bidding.
23/08/2022 12:57
Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted Tender Notice Tender package No 09: Construction supervision consultancy package No. 08 of the investor Ban Quản lý dự án công trình giao thông Nghệ An with the form National competitive bidding.
23/08/2022 11:49
The Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted the results of the bidding package Package No. 35: Construction supervision consultancy Package No. 34 of the investor Ban Quản lý dự án công trình giao thông Nghệ An.
03/08/2022 08:46
Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted Tender Notice Tender package No 09: Construction supervision consultancy package No. 08 of the investor Ban Quản lý dự án công trình giao thông Nghệ An with the form National competitive bidding.
30/07/2022 10:08
The Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted the request Contractor selection plan Package 09 project: Road connecting National Highway 7C (Do Luong) to Ho Chi Minh road (Tan Ky) (Phase 3) of the investor Ban Quản lý dự án công trình giao thông Nghệ An with 1 bidding package.
30/07/2022 09:49
The Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted the request Project contractor selection plan: Road connecting National Highway 7C (Do Luong) to Ho Chi Minh Road (Tan Ky) (Phase 3) of the investor Ban Quản lý dự án công trình giao thông Nghệ An with 4 bidding package.
29/07/2022 20:54
Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted Tender Notice Package 08: Construction of road surface and works on the route from Km9+00 - Km21+363 of the investor Ban Quản lý dự án công trình giao thông Nghệ An with the form National competitive bidding.
29/07/2022 20:44
The Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted the results of the bidding package Tender package No 04: Construction supervision consultancy of the investor Ban Quản lý dự án công trình giao thông Nghệ An.
25/07/2022 07:51
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án công trình giao thông Nghệ An announced the results of the bid package Package No. 09: Construction supervision consultancy package No. 08 .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN THIẾT KẾ XÂY DỰNG CÔNG TRÌNH GIAO THÔNG MIỀN BẮC
22/09/2022 11:09
Ban Quản lý dự án công trình giao thông Nghệ An announced the results of the bid package Package 08: Construction of road surface and works on the route from Km9+00 - Km21+363 .
- Winning bidder: CÔNG TY CP XÂY DỰNG TÂN NAM, CÔNG TY CP TỔNG CÔNG TY XÂY DỰNG NGHỆ AN
15/09/2022 16:13
Ban Quản lý dự án công trình giao thông Nghệ An announced the results of the bidding package Tender package No 09: Construction supervision consultancy package No. 08 with 1 participating contractors .
14/09/2022 09:14
Ban Quản lý dự án công trình giao thông Nghệ An announced the results of the bidding package Package 08: Construction of road surface and works on the route from Km9+00 - Km21+363 with 1 participating contractors .
31/08/2022 11:15
Ban Quản lý dự án công trình giao thông Nghệ An publishes Tender Notice Package 08: Construction of road surface and works on the route from Km9+00 - Km21+363 in the form National competitive bidding .
23/08/2022 12:57
Ban Quản lý dự án công trình giao thông Nghệ An publishes Tender Notice Tender package No 09: Construction supervision consultancy package No. 08 in the form National competitive bidding .
23/08/2022 11:49
Ban Quản lý dự án công trình giao thông Nghệ An announced the results of the bid package Package No. 35: Construction supervision consultancy Package No. 34 .
- Winning bidder: Công ty cổ phần tư vấn và đầu tư phát triển hạ tầng Nghệ An
03/08/2022 08:46
Ban Quản lý dự án công trình giao thông Nghệ An publishes Tender Notice Tender package No 09: Construction supervision consultancy package No. 08 in the form National competitive bidding .
30/07/2022 10:08
Ban Quản lý dự án công trình giao thông Nghệ An publishes the plan Contractor selection plan Package 09 project: Road connecting National Highway 7C (Do Luong) to Ho Chi Minh road (Tan Ky) (Phase 3) with 1 bidding package .
30/07/2022 09:49
Ban Quản lý dự án công trình giao thông Nghệ An publishes the plan Project contractor selection plan: Road connecting National Highway 7C (Do Luong) to Ho Chi Minh Road (Tan Ky) (Phase 3) with 4 bidding package .
29/07/2022 20:54
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted the results of the bidding package Package No. 09: Construction supervision consultancy package No. 08 of the investor Ban Quản lý dự án công trình giao thông Nghệ An.
22/09/2022 11:09
The Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted the results of the bidding package Package 08: Construction of road surface and works on the route from Km9+00 - Km21+363 of the investor Ban Quản lý dự án công trình giao thông Nghệ An.
15/09/2022 16:13
Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted Tender Notice Package 08: Construction of road surface and works on the route from Km9+00 - Km21+363 of the investor Ban Quản lý dự án công trình giao thông Nghệ An with the form National competitive bidding.
23/08/2022 12:57
Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted Tender Notice Tender package No 09: Construction supervision consultancy package No. 08 of the investor Ban Quản lý dự án công trình giao thông Nghệ An with the form National competitive bidding.
23/08/2022 11:49
The Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted the results of the bidding package Package No. 35: Construction supervision consultancy Package No. 34 of the investor Ban Quản lý dự án công trình giao thông Nghệ An.
03/08/2022 08:46
Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted Tender Notice Tender package No 09: Construction supervision consultancy package No. 08 of the investor Ban Quản lý dự án công trình giao thông Nghệ An with the form National competitive bidding.
30/07/2022 10:08
The Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted the request Contractor selection plan Package 09 project: Road connecting National Highway 7C (Do Luong) to Ho Chi Minh road (Tan Ky) (Phase 3) of the investor Ban Quản lý dự án công trình giao thông Nghệ An with 1 bidding package.
30/07/2022 09:49
The Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted the request Project contractor selection plan: Road connecting National Highway 7C (Do Luong) to Ho Chi Minh Road (Tan Ky) (Phase 3) of the investor Ban Quản lý dự án công trình giao thông Nghệ An with 4 bidding package.
29/07/2022 20:54
Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted Tender Notice Package 08: Construction of road surface and works on the route from Km9+00 - Km21+363 of the investor Ban Quản lý dự án công trình giao thông Nghệ An with the form National competitive bidding.
29/07/2022 20:44
The Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted the results of the bidding package Tender package No 04: Construction supervision consultancy of the investor Ban Quản lý dự án công trình giao thông Nghệ An.
25/07/2022 07:51
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án công trình giao thông Nghệ An has posted 136 of the contractor selection plan, which contains 397 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted 213 Tender Notice in the 195 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has posted 144 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 144 package, canceled the bid 0 package (among the bidding packages above).
- There are 19 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án công trình giao thông Nghệ An has a relationship with 104 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án công trình giao thông Nghệ An has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án công trình giao thông Nghệ An is the investor of 3 package, of which 3 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án công trình giao thông Nghệ An is the owner of 10 contractor selection plan. In which, they self-invite 10 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban Quản lý dự án công trình giao thông Nghệ An is an investor with 87 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án công trình giao thông Nghệ An is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code