Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án công trình thuỷ lợi nội đồng as follows:
- Has relationships with 44 contractor.
- Announced 34 investment development project, of which 8 projects have not yet announced the prequalification documents.
- Announced 16 contractor selection plans with a total of 27 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 51 packages (with 53 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 54 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1 packages with results that do not have tender notice or prequalification notice.
- There are 7 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.63 contractors.
- Breakdown by bidding field: Goods 7.55%, Construction 90.57%, Consultancy 1.89%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 483,967,082,000 VND, of which the total winning bid value is: 477,895,076,954 VND.
- The savings rate is: 1.25%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án công trình thuỷ lợi nội đồng as follows:
- Has relationships with 44 contractor.
- The average number of contractors participating in each bidding package is: 1.63 contractors.
- Proportion of bidding fields: Goods 7.55%, Construction 90.57%, Consulting 1.89%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 483,967,082,000 VND, in which the total winning value is: 477,895,076,954 VND.
- The savings rate is: 1.25%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 34 investment and development projects.
- As the owner of 16 Contractor selection plan in which 16 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 34 bidding packages in which 34 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of N1 canal, Thai Hoc A pumping station (K0+00-K0+410), Chi Linh city of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
12/10/2024 08:20
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of Moi pumping station, Binh Giang district of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
12/10/2024 08:18
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of Level Tu pumping station, Thanh Ha district of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
12/10/2024 08:16
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of Quang Tien pumping station, Gia Loc district of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
12/10/2024 08:13
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of Hao Khe pumping station, Ninh Giang district of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
12/10/2024 08:11
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of Thai Son pumping station, Kinh Mon town of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
- Winning bidder: VN ELECTRIC POWER DEVELOPMENT JOINT STOCK COMPANY
12/10/2024 08:09
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of N2-2 canal, That Hung pumping station, Kinh Mon town of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
- Winning bidder: ASIAN CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY
12/10/2024 08:08
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of Tam Ky pumping station, Kim Thanh district of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY LẮP HẠ TẦNG NĂNG LƯỢNG HÀ NỘI
12/10/2024 08:06
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of Thach Loi pumping station, Cam Giang district of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY LẮP HẠ TẦNG NĂNG LƯỢNG HÀ NỘI
12/10/2024 08:03
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of KC canal at Hop Tien pumping station (K0- K0+500), Nam Sach district of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
- Winning bidder: CÔNG TY TNHH HÀO HÙNG HD
23/09/2024 08:31
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án công trình thuỷ lợi nội đồng announced the results of the bid package Package No. 01: Construction and repair of N1 canal, Thai Hoc A pumping station (K0+00-K0+410), Chi Linh city .
- Winning bidder: TRANG NGOC CONSTRUCTION AND TRADING JOINT STOCK COMPANY
12/10/2024 08:20
Ban quản lý dự án công trình thuỷ lợi nội đồng announced the results of the bid package Package No. 01: Construction and repair of Moi pumping station, Binh Giang district .
- Winning bidder: HAI DUONG HOUSE BUSSINESS AND CONSTRUCTION COMPANY LIMITED, VIET A ELECTRIC CONTRUCTION AND INDUSTRY DEVELOPING CONSULTANT JOINT STOCK COMPANY, HAI DUONG INDUSTRIAL PUMP JOINT STOCK COMPANY
12/10/2024 08:18
Ban quản lý dự án công trình thuỷ lợi nội đồng announced the results of the bid package Package No. 01: Construction and repair of Level Tu pumping station, Thanh Ha district .
- Winning bidder: HANH XUONG ENGINEERING COMPANY LIMITED, THANH CONG DESIGN AND CONSTRUCTION JOINT STOCK COMPANY, HAI DUONG ELECTRIC INSTALLATION AND INVESTMENT CONSTRUCTION JOINT STOCK COMPANY
12/10/2024 08:16
Ban quản lý dự án công trình thuỷ lợi nội đồng announced the results of the bid package Package No. 01: Construction and repair of Quang Tien pumping station, Gia Loc district .
- Winning bidder: CÔNG TY CỔ PHẦN SẢN XUẤT, XÂY DỰNG VÀ THƯƠNG MẠI HOÀI DƯƠNG, VIET A ELECTRIC CONTRUCTION AND INDUSTRY DEVELOPING CONSULTANT JOINT STOCK COMPANY, HAIDUONG PUMP MANUFACTURING JOINT STOCK COMPANY
12/10/2024 08:13
Ban quản lý dự án công trình thuỷ lợi nội đồng announced the results of the bid package Package No. 01: Construction and repair of Hao Khe pumping station, Ninh Giang district .
- Winning bidder: THANH CONG DESIGN AND CONSTRUCTION JOINT STOCK COMPANY, HAIDUONG PUMP MANUFACTURING JOINT STOCK COMPANY, INVICO INDUSTRY CORPORATION
12/10/2024 08:11
Ban quản lý dự án công trình thuỷ lợi nội đồng announced the results of the bid package Package No. 01: Construction and repair of Thai Son pumping station, Kinh Mon town .
- Winning bidder: CÔNG TY CỔ PHẦN SẢN XUẤT, XÂY DỰNG VÀ THƯƠNG MẠI HOÀI DƯƠNG, HAI DUONG INDUSTRIAL PUMP JOINT STOCK COMPANY, VN ELECTRIC POWER DEVELOPMENT JOINT STOCK COMPANY
12/10/2024 08:09
Ban quản lý dự án công trình thuỷ lợi nội đồng announced the results of the bid package Package No. 01: Construction and repair of N2-2 canal, That Hung pumping station, Kinh Mon town .
- Winning bidder: ASIAN CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY
12/10/2024 08:08
Ban quản lý dự án công trình thuỷ lợi nội đồng announced the results of the bid package Package No. 01: Construction and repair of Tam Ky pumping station, Kim Thanh district .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI BẮC VIỆT HD, HAI NAM PUMP MANUFACTURING JOINT STOCK COMPANY, CÔNG TY CỔ PHẦN XÂY LẮP HẠ TẦNG NĂNG LƯỢNG HÀ NỘI
12/10/2024 08:06
Ban quản lý dự án công trình thuỷ lợi nội đồng announced the results of the bid package Package No. 01: Construction and repair of Thach Loi pumping station, Cam Giang district .
- Winning bidder: HAI DUONG HOUSE BUSSINESS AND CONSTRUCTION COMPANY LIMITED, HAI NAM PUMP MANUFACTURING JOINT STOCK COMPANY, CÔNG TY CỔ PHẦN XÂY LẮP HẠ TẦNG NĂNG LƯỢNG HÀ NỘI
12/10/2024 08:03
Ban quản lý dự án công trình thuỷ lợi nội đồng announced the results of the bidding package Tender package No 01: Construction and repair of Gom pumping station, Tu Ky district with 1 participating contractors .
02/10/2024 16:04
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of N1 canal, Thai Hoc A pumping station (K0+00-K0+410), Chi Linh city of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
12/10/2024 08:20
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of Moi pumping station, Binh Giang district of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
12/10/2024 08:18
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of Level Tu pumping station, Thanh Ha district of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
12/10/2024 08:16
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of Quang Tien pumping station, Gia Loc district of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
12/10/2024 08:13
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of Hao Khe pumping station, Ninh Giang district of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
12/10/2024 08:11
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of Thai Son pumping station, Kinh Mon town of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
- Winning bidder: VN ELECTRIC POWER DEVELOPMENT JOINT STOCK COMPANY
12/10/2024 08:09
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of N2-2 canal, That Hung pumping station, Kinh Mon town of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
- Winning bidder: ASIAN CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY
12/10/2024 08:08
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of Tam Ky pumping station, Kim Thanh district of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY LẮP HẠ TẦNG NĂNG LƯỢNG HÀ NỘI
12/10/2024 08:06
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of Thach Loi pumping station, Cam Giang district of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY LẮP HẠ TẦNG NĂNG LƯỢNG HÀ NỘI
12/10/2024 08:03
The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted the results of the bidding package Package No. 01: Construction and repair of KC canal at Hop Tien pumping station (K0- K0+500), Nam Sach district of the investor Ban quản lý dự án công trình thuỷ lợi nội đồng.
- Winning bidder: CÔNG TY TNHH HÀO HÙNG HD
23/09/2024 08:31
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án công trình thuỷ lợi nội đồng has posted 16 of the contractor selection plan, which contains 27 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted 53 Tender Notice in the 51 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has posted 54 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 54 package, canceled the bid 0 package (among the bidding packages above).
- There are 1 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý dự án công trình thuỷ lợi nội đồng has a relationship with 44 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án công trình thuỷ lợi nội đồng has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án công trình thuỷ lợi nội đồng is the investor of 34 package, of which 34 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án công trình thuỷ lợi nội đồng is the owner of 16 contractor selection plan. In which, they self-invite 16 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban quản lý dự án công trình thuỷ lợi nội đồng is an investor with 30 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án công trình thuỷ lợi nội đồng is the investor of 34 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code