Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư công trình giao thông - xây dựng as follows:
- Has relationships with 28 contractor.
- Announced 12 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 17 contractor selection plans with a total of 121 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 15 packages (with 16 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 35 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 11 packages with results that do not have tender notice or prequalification notice.
- There are 97 packages that have not fully posted the contractor selection results. Of these 97 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.71 contractors.
- Breakdown by bidding field: Goods 0%, Construction 12.50%, Consultancy 87.50%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 157,400,493,000 VND, of which the total winning bid value is: 149,813,828,290 VND.
- The savings rate is: 4.82%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư công trình giao thông - xây dựng as follows:
- Has relationships with 28 contractor.
- The average number of contractors participating in each bidding package is: 1.71 contractors.
- Proportion of bidding fields: Goods 0%, Construction 12.50%, Consulting 87.50%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 157,400,493,000 VND, in which the total winning value is: 149,813,828,290 VND.
- The savings rate is: 4.82%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 12 investment and development projects.
- As the owner of 17 Contractor selection plan in which 17 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 16 bidding packages in which 16 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the results of the bidding package Bidding package No. 03: Prepare E-HSMT, evaluate E-Bidding survey package, prepare pre-feasibility study report of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng.
- Winning bidder: Ban quản lý dự án đầu tư công trình giao thông - xây dựng
18/10/2024 15:23
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the results of the bidding package Package No. 24: Supervising construction of bomb, mine and explosive material clearance of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng.
- Winning bidder: LỮ ĐOÀN 299/QUÂN ĐOÀN 12
18/10/2024 08:59
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the results of the bidding package Bidding package No. 15: Consulting on price appraisal to prepare construction estimates of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng.
- Winning bidder: BUSINESS CONSULTANT AND VALUATION JOINT STOCK COMPANY
08/10/2024 13:54
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the results of the bidding package Package No. 20: Consulting on price appraisal to prepare construction estimates of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng.
- Winning bidder: BUSINESS CONSULTANT AND VALUATION JOINT STOCK COMPANY
02/10/2024 15:50
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the results of the bidding package Bidding package No. 11: Consulting on survey, design of physical protection and estimate of moving electrical works of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng.
- Winning bidder: POWER INVESTMENT CONSULTING COMPANY LIMITED NO 1
25/09/2024 16:39
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the results of the bidding package Package 01: Survey consultancy, preparation of pre-feasibility study report of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ TƯ VẤN GIAO THÔNG QUẢNG NINH
24/09/2024 16:47
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the results of the bidding package Package No. 9: Consulting on survey, design of physical protection and estimate of moving electrical works of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ ĐẦU TƯ NHẤT THỊNH PHÁT
19/09/2024 08:05
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the results of the bidding package Package No. 23: Survey, estimate and construction of bomb, mine and explosive material clearance of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng.
- Winning bidder: LỮ ĐOÀN 299/QUÂN ĐOÀN 12
17/09/2024 08:43
Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted Tender Notice Package 01: Survey consultancy, preparation of pre-feasibility study report of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng with the form Open bidding.
30/08/2024 16:02
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the request Contractor selection plan, steps to prepare a Pre-Feasibility Study Report Investment project to build a frontage road along National Highway 39 from the intersection with National Highway 5 to the intersection of the National Highway 39 overpass (Km9+926 route of National Highway 39) of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng with 4 bidding package.
30/08/2024 15:49
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án đầu tư công trình giao thông - xây dựng announced the results of the bid package Bidding package No. 03: Prepare E-HSMT, evaluate E-Bidding survey package, prepare pre-feasibility study report .
- Winning bidder: Ban quản lý dự án đầu tư công trình giao thông - xây dựng
18/10/2024 15:23
Ban quản lý dự án đầu tư công trình giao thông - xây dựng announced the results of the bid package Package No. 24: Supervising construction of bomb, mine and explosive material clearance .
- Winning bidder: LỮ ĐOÀN 299/QUÂN ĐOÀN 12
18/10/2024 08:59
Ban quản lý dự án đầu tư công trình giao thông - xây dựng announced the results of the bid package Bidding package No. 15: Consulting on price appraisal to prepare construction estimates .
- Winning bidder: BUSINESS CONSULTANT AND VALUATION JOINT STOCK COMPANY
08/10/2024 13:54
Ban quản lý dự án đầu tư công trình giao thông - xây dựng announced the results of the bid package Package No. 20: Consulting on price appraisal to prepare construction estimates .
- Winning bidder: BUSINESS CONSULTANT AND VALUATION JOINT STOCK COMPANY
02/10/2024 15:50
Ban quản lý dự án đầu tư công trình giao thông - xây dựng announced the results of the bid package Bidding package No. 11: Consulting on survey, design of physical protection and estimate of moving electrical works .
- Winning bidder: POWER INVESTMENT CONSULTING COMPANY LIMITED NO 1
25/09/2024 16:39
Ban quản lý dự án đầu tư công trình giao thông - xây dựng announced the results of the bid package Package 01: Survey consultancy, preparation of pre-feasibility study report .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ TƯ VẤN GIAO THÔNG QUẢNG NINH
24/09/2024 16:47
Ban quản lý dự án đầu tư công trình giao thông - xây dựng announced the results of the bid package Package No. 9: Consulting on survey, design of physical protection and estimate of moving electrical works .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ ĐẦU TƯ NHẤT THỊNH PHÁT
19/09/2024 08:05
Ban quản lý dự án đầu tư công trình giao thông - xây dựng announced the results of the bid package Package No. 23: Survey, estimate and construction of bomb, mine and explosive material clearance .
- Winning bidder: 319 BOM, MINS, UXO ONE MEMBER COMPANY LIMITED, LỮ ĐOÀN 299/QUÂN ĐOÀN 12
17/09/2024 08:43
Ban quản lý dự án đầu tư công trình giao thông - xây dựng publishes Tender Notice Package 01: Survey consultancy, preparation of pre-feasibility study report in the form Open bidding .
30/08/2024 16:02
Ban quản lý dự án đầu tư công trình giao thông - xây dựng publishes the plan Contractor selection plan, steps to prepare a Pre-Feasibility Study Report Investment project to build a frontage road along National Highway 39 from the intersection with National Highway 5 to the intersection of the National Highway 39 overpass (Km9+926 route of National Highway 39) with 4 bidding package .
30/08/2024 15:49
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the results of the bidding package Bidding package No. 03: Prepare E-HSMT, evaluate E-Bidding survey package, prepare pre-feasibility study report of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng.
- Winning bidder: Ban quản lý dự án đầu tư công trình giao thông - xây dựng
18/10/2024 15:23
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the results of the bidding package Package No. 24: Supervising construction of bomb, mine and explosive material clearance of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng.
- Winning bidder: LỮ ĐOÀN 299/QUÂN ĐOÀN 12
18/10/2024 08:59
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the results of the bidding package Bidding package No. 15: Consulting on price appraisal to prepare construction estimates of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng.
- Winning bidder: BUSINESS CONSULTANT AND VALUATION JOINT STOCK COMPANY
08/10/2024 13:54
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the results of the bidding package Package No. 20: Consulting on price appraisal to prepare construction estimates of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng.
- Winning bidder: BUSINESS CONSULTANT AND VALUATION JOINT STOCK COMPANY
02/10/2024 15:50
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the results of the bidding package Bidding package No. 11: Consulting on survey, design of physical protection and estimate of moving electrical works of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng.
- Winning bidder: POWER INVESTMENT CONSULTING COMPANY LIMITED NO 1
25/09/2024 16:39
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the results of the bidding package Package 01: Survey consultancy, preparation of pre-feasibility study report of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ TƯ VẤN GIAO THÔNG QUẢNG NINH
24/09/2024 16:47
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the results of the bidding package Package No. 9: Consulting on survey, design of physical protection and estimate of moving electrical works of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ ĐẦU TƯ NHẤT THỊNH PHÁT
19/09/2024 08:05
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the results of the bidding package Package No. 23: Survey, estimate and construction of bomb, mine and explosive material clearance of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng.
- Winning bidder: LỮ ĐOÀN 299/QUÂN ĐOÀN 12
17/09/2024 08:43
Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted Tender Notice Package 01: Survey consultancy, preparation of pre-feasibility study report of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng with the form Open bidding.
30/08/2024 16:02
The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted the request Contractor selection plan, steps to prepare a Pre-Feasibility Study Report Investment project to build a frontage road along National Highway 39 from the intersection with National Highway 5 to the intersection of the National Highway 39 overpass (Km9+926 route of National Highway 39) of the investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng with 4 bidding package.
30/08/2024 15:49
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted 17 of the contractor selection plan, which contains 121 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted 16 Tender Notice in the 15 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has posted 35 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 35 package, canceled the bid 0 package (among the bidding packages above).
- There are 11 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has a relationship with 28 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng is the investor of 16 package, of which 16 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng is the owner of 17 contractor selection plan. In which, they self-invite 17 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng is an investor with 41 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư công trình giao thông - xây dựng is the investor of 12 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code