Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh as follows:
- Has relationships with 1 project owners.
- Has relationships with 59 contractor.
- Announced 30 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 9 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 8 packages that have not fully posted the contractor selection results. Of these 8 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 76,826,805,000 VND, of which the total winning bid value is: 75,214,321,000 VND.
- The savings rate is: 2.10%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh as follows:
- Has relationships with 59 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 76,826,805,000 VND, in which the total winning value is: 75,214,321,000 VND.
- The savings rate is: 2.10%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh are as follows:
- Is the investor of 30 development investment projects.
- Is the investor of 46 contractor selection plans, of which 2 were self-published, and 44 were published by other entities.
- Is the investor of 32 Tender Notices, of which 0 were self-invited, and 32 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Package No. 20: Supervision of construction and installation .
- Winning bidder: SSC VIET NAM CONSTRUCTION AND DESIGN JOINT STOCK COMPANY
30/12/2025 11:36
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Bidding package: Consulting on preparation of Proposal, evaluation of Proposal for 2 XL bidding packages .
- Winning bidder: VIET ROAD AND BRIDGE DESIGN CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
29/12/2025 17:52
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Construction supervision consulting bidding package: Relocation of technical infrastructure works (water supply) within the site clearance area of Vinh Thanh commune .
- Winning bidder: CONSULTANT TRANSFER TECHNOLOGY CONSTRUCTION AND ENVIRONMENT JOINT STOCK COMPANY
29/12/2025 17:38
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh publishes the plan Contractor selection plan for item: Relocation of technical infrastructure (water supply) project within the area of site clearance of Vinh Thanh commune Project: Investment in construction of a road collecting the foot of the left dyke of the Red River from the intersection to the People's Committee of Xuan Canh commune to the intersection to the People's Committee of Hai Boi commune with 7 bidding package .
29/12/2025 17:28
Investor Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh has posted an investment and development project Relocation of technical infrastructure (water supply) works within the site clearance area of Vinh Thanh commune Project: Investment in construction of a road collecting the base of the left dyke of the Red River from the intersection to the People's Committee of Xuan Canh commune to the intersection to the People's Committee of Hai Boi commune.
29/12/2025 17:17
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Package No. 13: Construction and equipment supervision .
- Winning bidder: MINH VU CONSULTING AND CONSTRUCTION COMPANY LIMITED
26/12/2025 17:15
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Package No. 04: Construction and installation .
- Winning bidder: SONG HONG DESIGN INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY
26/12/2025 11:53
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Package No. 03: Survey consultancy, technical economic report .
- Winning bidder: CONSTRUCTION CONSULTANT JOINT STOCK COMPANY 116
24/12/2025 18:00
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Package 03: Construction supervision consultancy .
- Winning bidder: VIET TRUNG INVESTMENT JOINT STOCK COMPANY
24/12/2025 17:47
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Package No. 12: Construction and equipment construction .
- Winning bidder: KHAI MINH DEVELOP JOINT STOCK COMPANY
23/12/2025 18:32
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh publishes the plan Contractor selection plan for project preparation phase: Investment in construction of technical infrastructure of resettlement area in Dong Nhan village, Hai Boi commune, Dong Anh district to serve site clearance project to build and upgrade Phuong Trach pumping station, Dong Anh district, Hanoi city with 5 bidding package .
21/11/2025 10:21
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh publishes the plan Plan for selecting contractor projects to build Hoa My Kindergarten with 4 bidding package .
11/09/2025 11:27
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Construction supervision .
- Winning bidder: CONSULTANT AND INSPECTION JOINT STOCK COMPANY OF CONSTRUCTION TECHNOLOGY AND EQUIPMENT
03/09/2025 14:22
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Package 06: Audit .
- Winning bidder: ASCO FIRM AUDITING AND VALUATION COMPANY LIMITED
27/08/2025 17:50
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Package No. 7: Supervision of construction and equipment installation .
- Winning bidder: BRAND DESIGNING COMPANY LIMITED, MINH PHAT CONSTRUCT INVESTMENT DESIGN CONSULTING JOINT STOCK COMPANY
26/08/2025 18:13
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Package 6: Construction and installation of equipment .
- Winning bidder: DIEN HONG CONSTRUCTION AND TRADING JOINT STOCK COMPANY, HOANG LONG PREVENTION AND FIGHT FIRE AND TECHNIQUE EQUITMENT JOINT STOCK COMPANY
11/08/2025 14:05
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Package No. 20: Supervision of construction and installation .
- Winning bidder: SSC VIET NAM CONSTRUCTION AND DESIGN JOINT STOCK COMPANY
30/12/2025 11:36
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Bidding package: Consulting on preparation of Proposal, evaluation of Proposal for 2 XL bidding packages .
- Winning bidder: VIET ROAD AND BRIDGE DESIGN CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
29/12/2025 17:52
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Construction supervision consulting bidding package: Relocation of technical infrastructure works (water supply) within the site clearance area of Vinh Thanh commune .
- Winning bidder: CONSULTANT TRANSFER TECHNOLOGY CONSTRUCTION AND ENVIRONMENT JOINT STOCK COMPANY
29/12/2025 17:38
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh publishes the plan Contractor selection plan for item: Relocation of technical infrastructure (water supply) project within the area of site clearance of Vinh Thanh commune Project: Investment in construction of a road collecting the foot of the left dyke of the Red River from the intersection to the People's Committee of Xuan Canh commune to the intersection to the People's Committee of Hai Boi commune with 7 bidding package .
29/12/2025 17:28
Investor Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh has posted an investment and development project Relocation of technical infrastructure (water supply) works within the site clearance area of Vinh Thanh commune Project: Investment in construction of a road collecting the base of the left dyke of the Red River from the intersection to the People's Committee of Xuan Canh commune to the intersection to the People's Committee of Hai Boi commune.
29/12/2025 17:17
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Package No. 13: Construction and equipment supervision .
- Winning bidder: MINH VU CONSULTING AND CONSTRUCTION COMPANY LIMITED
26/12/2025 17:15
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Package No. 04: Construction and installation .
- Winning bidder: SONG HONG DESIGN INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY
26/12/2025 11:53
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Package No. 03: Survey consultancy, technical economic report .
- Winning bidder: CONSTRUCTION CONSULTANT JOINT STOCK COMPANY 116
24/12/2025 18:00
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Package 03: Construction supervision consultancy .
- Winning bidder: VIET TRUNG INVESTMENT JOINT STOCK COMPANY
24/12/2025 17:47
Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh announced the results of the bid package Package No. 12: Construction and equipment construction .
- Winning bidder: KHAI MINH DEVELOP JOINT STOCK COMPANY
23/12/2025 18:32
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh has posted 2 of the contractor selection plan, which contains 9 of the bidding package. See full list here
Summary: The Bid solicitor Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh has a relationship with 59 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh has a relationship with 40 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects