Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương as follows:
- Has relationships with 45 contractor.
- Announced 21 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 35 contractor selection plans with a total of 128 bidding packages, of which 9 prequalification documents have not found the investment project.
- Has invited bids for 18 packages (with 21 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 144 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 127 packages with results that do not have tender notice or prequalification notice.
- There are 19 packages that have not fully posted the contractor selection results. Of these 19 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.29 contractors.
- Breakdown by bidding field: Goods 0%, Construction 42.86%, Consultancy 57.14%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 214,977,316,000 VND, of which the total winning bid value is: 214,322,752,000 VND.
- The savings rate is: 0.30%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương as follows:
- Has relationships with 45 contractor.
- The average number of contractors participating in each bidding package is: 1.29 contractors.
- Proportion of bidding fields: Goods 0%, Construction 42.86%, Consulting 57.14%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 214,977,316,000 VND, in which the total winning value is: 214,322,752,000 VND.
- The savings rate is: 0.30%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 21 investment and development projects.
- As the owner of 34 Contractor selection plan in which 33 Contractor selection plan is self-published, and 1 Contractor selection plan is posted by other units.
- Being the investor of 45 bidding packages in which 6 packages are self-invited, and 39 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted the results of the bidding package Consulting on traffic safety verification before putting phase 1 of the project into operation and use under the contractor selection plan, consulting package on traffic safety verification before putting the project into operation and use under the project. Project: Renovating and upgrading route DH.28, section through Vu Ninh - Vu An commune and branch route through King Roc temple, Vu An commune, Kien Xuong district of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương.
- Winning bidder: Minh Anh construction and consultant joint stock company
09/10/2024 14:33
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted the request Contractor selection plan for consulting package to verify traffic safety before putting the project into operation: Renovating and upgrading DH.28 road, section passing Vu Ninh - Vu An commune and branch route through King Roc temple, Vu An commune, Kien Xuong district (Phase 1: Section from DT.458 road to King Roc temple and section from DH.28 road to Dong Vinh bridge); of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương with 1 bidding package.
07/10/2024 17:10
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted the results of the bidding package Bidding package No. 23: Consulting and supervision of construction works for adjustments and additions of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương.
- Winning bidder: THAI SON CONSTRUCTION INVESTMENT AND TRADING JOINT STOCK COMPANY
03/10/2024 16:15
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted the results of the bidding package Package No. 22: Consulting on verification, adjustment and supplementation of construction drawing design and project estimates of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN THIẾT KẾ KIẾN TRÚC Á ÂU
02/10/2024 10:08
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted the request Plan for selecting contractors for consulting packages to make adjustments and supplements to construction drawing designs and project construction estimates: Kien Xuong district cultural and sports center of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương with 3 bidding package.
20/09/2024 15:06
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted the results of the bidding package Bidding package No. 20: Consulting on preparation of Bidding Documents, evaluation of Bidding Documents for Bidding Package No. 21 of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY LẮP ĐỨC THÀNH
20/09/2024 15:03
Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương Posted Development Investment Project Kien Xuong district cultural and sports center.
20/09/2024 14:14
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted the results of the bidding package Bidding package No. 09: Construction supervision consultancy for phase 1 of the project of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương.
- Winning bidder: CÔNG TY CỔ PHẦN THIẾT KẾ THĂNG LONG
28/08/2024 16:06
Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted Tender Notice Bidding package No. 23: Consulting and supervision of construction works for adjustments and additions of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương with the form Open bidding.
02/08/2024 10:46
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted the results of the bidding package Package No. 22: Construction and traffic safety adjustment and supplement of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương.
- Winning bidder: CÔNG TY TNHH THUẬN DUY
30/07/2024 14:20
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương announced the results of the bid package Consulting on traffic safety verification before putting phase 1 of the project into operation and use under the contractor selection plan, consulting package on traffic safety verification before putting the project into operation and use under the project. Project: Renovating and upgrading route DH.28, section through Vu Ninh - Vu An commune and branch route through King Roc temple, Vu An commune, Kien Xuong district .
- Winning bidder: Minh Anh construction and consultant joint stock company
09/10/2024 14:33
Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương publishes the plan Contractor selection plan for consulting package to verify traffic safety before putting the project into operation: Renovating and upgrading DH.28 road, section passing Vu Ninh - Vu An commune and branch route through King Roc temple, Vu An commune, Kien Xuong district (Phase 1: Section from DT.458 road to King Roc temple and section from DH.28 road to Dong Vinh bridge); with 1 bidding package .
07/10/2024 17:10
Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương announced the results of the bid package Bidding package No. 23: Consulting and supervision of construction works for adjustments and additions .
- Winning bidder: THAI SON CONSTRUCTION INVESTMENT AND TRADING JOINT STOCK COMPANY
03/10/2024 16:15
Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương announced the results of the bid package Package No. 22: Consulting on verification, adjustment and supplementation of construction drawing design and project estimates .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN THIẾT KẾ KIẾN TRÚC Á ÂU
02/10/2024 10:08
Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương publishes the plan Plan for selecting contractors for consulting packages to make adjustments and supplements to construction drawing designs and project construction estimates: Kien Xuong district cultural and sports center with 3 bidding package .
20/09/2024 15:06
Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương announced the results of the bid package Bidding package No. 20: Consulting on preparation of Bidding Documents, evaluation of Bidding Documents for Bidding Package No. 21 .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY LẮP ĐỨC THÀNH
20/09/2024 15:03
Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương announced the results of the bid package Bidding package No. 09: Construction supervision consultancy for phase 1 of the project .
- Winning bidder: CÔNG TY CỔ PHẦN THIẾT KẾ THĂNG LONG
28/08/2024 16:06
Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương publishes Tender Notice Bidding package No. 23: Consulting and supervision of construction works for adjustments and additions in the form Open bidding .
02/08/2024 10:46
Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương announced the results of the bid package Package No. 22: Construction and traffic safety adjustment and supplement .
- Winning bidder: CÔNG TY TNHH THUẬN DUY
30/07/2024 14:20
Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương announced the results of the bid package Bidding package No.07: Consultancy on preparation of Bid Documents, evaluation of Bid Package No.08 .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI TRƯỜNG AN PHÁT
27/07/2024 08:51
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted the results of the bidding package Consulting on traffic safety verification before putting phase 1 of the project into operation and use under the contractor selection plan, consulting package on traffic safety verification before putting the project into operation and use under the project. Project: Renovating and upgrading route DH.28, section through Vu Ninh - Vu An commune and branch route through King Roc temple, Vu An commune, Kien Xuong district of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương.
- Winning bidder: Minh Anh construction and consultant joint stock company
09/10/2024 14:33
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted the request Contractor selection plan for consulting package to verify traffic safety before putting the project into operation: Renovating and upgrading DH.28 road, section passing Vu Ninh - Vu An commune and branch route through King Roc temple, Vu An commune, Kien Xuong district (Phase 1: Section from DT.458 road to King Roc temple and section from DH.28 road to Dong Vinh bridge); of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương with 1 bidding package.
07/10/2024 17:10
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted the results of the bidding package Bidding package No. 23: Consulting and supervision of construction works for adjustments and additions of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương.
- Winning bidder: THAI SON CONSTRUCTION INVESTMENT AND TRADING JOINT STOCK COMPANY
03/10/2024 16:15
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted the results of the bidding package Package No. 22: Consulting on verification, adjustment and supplementation of construction drawing design and project estimates of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN THIẾT KẾ KIẾN TRÚC Á ÂU
02/10/2024 10:08
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted the request Plan for selecting contractors for consulting packages to make adjustments and supplements to construction drawing designs and project construction estimates: Kien Xuong district cultural and sports center of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương with 3 bidding package.
20/09/2024 15:06
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted the results of the bidding package Bidding package No. 20: Consulting on preparation of Bidding Documents, evaluation of Bidding Documents for Bidding Package No. 21 of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY LẮP ĐỨC THÀNH
20/09/2024 15:03
Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương Posted Development Investment Project Kien Xuong district cultural and sports center.
20/09/2024 14:14
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted the results of the bidding package Bidding package No. 09: Construction supervision consultancy for phase 1 of the project of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương.
- Winning bidder: CÔNG TY CỔ PHẦN THIẾT KẾ THĂNG LONG
28/08/2024 16:06
Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted Tender Notice Bidding package No. 23: Consulting and supervision of construction works for adjustments and additions of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương with the form Open bidding.
02/08/2024 10:46
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted the results of the bidding package Package No. 22: Construction and traffic safety adjustment and supplement of the investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương.
- Winning bidder: CÔNG TY TNHH THUẬN DUY
30/07/2024 14:20
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted 35 of the contractor selection plan, which contains 128 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted 21 Tender Notice in the 18 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has posted 144 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 144 package, canceled the bid 0 package (among the bidding packages above).
- There are 127 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has a relationship with 45 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
The data declared by the procuring entity is incorrect (missing agency code and having the same name as many other parties)
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương has a relationship with 2 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương is the investor of 45 package, of which 6 package is self-invited, other units invite bid 39 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương is the owner of 34 contractor selection plan. In which, they self-invite 33 of contractor selection plan, other units invite bids of 1 of contractor selection plan.
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương is an investor with 62 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Kiến Xương is the investor of 21 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register