Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai as follows:
- Has relationships with 47 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 241 contractor selection plans with a total of 656 bidding packages, of which 135 prequalification documents have not found the investment project.
- Has invited bids for 92 packages (with 99 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 38 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 280 packages that have not fully posted the contractor selection results. Of these 272 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.12 contractors.
- Breakdown by bidding field: Goods 0%, Construction 92.93%, Consultancy 7.07%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 170,971,940,211 VND, of which the total winning bid value is: 170,722,938,505 VND.
- The savings rate is: 0.15%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai as follows:
- Has relationships with 47 contractor.
- The average number of contractors participating in each bidding package is: 1.12 contractors.
- Proportion of bidding fields: Goods 0%, Construction 92.93%, Consulting 7.07%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 170,971,940,211 VND, in which the total winning value is: 170,722,938,505 VND.
- The savings rate is: 0.15%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 1 investment and development projects.
- As the owner of 133 Contractor selection plan in which 133 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 45 bidding packages in which 45 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted the results of the bidding package Package No. 1: Construction of the 1st High School for Ethnic Minority Affairs, Lung Than commune, Si Ma Cai district of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai.
21/10/2022 08:38
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted the results of the bidding package Package No. 01: Construction of the construction work of Sin Cheng Secondary School, Sin Cheng Commune, Si Ma Cai District of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN TRƯỜNG SƠN
21/10/2022 08:35
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted the results of the bidding package Package No. 1: Construction of secondary school in Si Ma Cai town, Si Ma Cai district (Item: Classroom + Exterior) of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai.
- Winning bidder: Công ty TNHH một thành viên Thái Sơn
25/09/2022 16:47
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted Tender Notice Tender package No 1: Construction of the 1st High School for Ethnic Minority Affairs, Lung Than commune, Si Ma Cai district of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai with the form National competitive bidding.
14/09/2022 16:01
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted Tender Notice Tender package No 01: Construction of the construction work of Sin Cheng Secondary School, Sin Cheng Commune, Si Ma Cai District of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai with the form National competitive bidding.
14/09/2022 15:53
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted the request Sin Cheng Secondary School for Secondary Education and Training, Si Ma Cai district of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai with 5 bidding package.
08/09/2022 07:40
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted the request Primary School for Ethnic Minority Affairs No. 1, Lung Than commune, Si Ma Cai district of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai with 4 bidding package.
07/09/2022 15:43
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted the request Primary School for Ethnic Minority Affairs No. 1, Lung Than commune, Si Ma Cai district of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai with 4 bidding package.
07/09/2022 15:38
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted Tender Notice Tender package No 1: Construction of secondary school in Si Ma Cai town, Si Ma Cai district (Item: Classroom + Exterior) of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai with the form National competitive bidding.
19/08/2022 11:01
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted Tender Notice Tender package No 1: Construction of secondary school in Si Ma Cai town, Si Ma Cai district (Item: Classroom + Exterior) of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai with the form National competitive bidding.
12/08/2022 16:20
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai announced the results of the bid package Package No. 1: Construction of the 1st High School for Ethnic Minority Affairs, Lung Than commune, Si Ma Cai district .
- Winning bidder: Công Ty TNHH Xây Dựng Phúc Anh
21/10/2022 08:38
Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai announced the results of the bid package Package No. 01: Construction of the construction work of Sin Cheng Secondary School, Sin Cheng Commune, Si Ma Cai District .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG SỐ I, CÔNG TY TNHH MỘT THÀNH VIÊN TRƯỜNG SƠN
21/10/2022 08:35
Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai announced the results of the bidding package Tender package No 1: Construction of the 1st High School for Ethnic Minority Affairs, Lung Than commune, Si Ma Cai district with 1 participating contractors .
26/09/2022 09:10
Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai announced the results of the bidding package Tender package No 01: Construction of the construction work of Sin Cheng Secondary School, Sin Cheng Commune, Si Ma Cai District with 1 participating contractors .
26/09/2022 08:39
Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai announced the results of the bid package Package No. 1: Construction of secondary school in Si Ma Cai town, Si Ma Cai district (Item: Classroom + Exterior) .
- Winning bidder: Công ty TNHH một thành viên Thái Sơn
25/09/2022 16:47
Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai publishes Tender Notice Tender package No 1: Construction of the 1st High School for Ethnic Minority Affairs, Lung Than commune, Si Ma Cai district in the form National competitive bidding .
14/09/2022 16:01
Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai publishes Tender Notice Tender package No 01: Construction of the construction work of Sin Cheng Secondary School, Sin Cheng Commune, Si Ma Cai District in the form National competitive bidding .
14/09/2022 15:53
Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai publishes the plan Sin Cheng Secondary School for Secondary Education and Training, Si Ma Cai district with 5 bidding package .
08/09/2022 07:40
Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai publishes the plan Primary School for Ethnic Minority Affairs No. 1, Lung Than commune, Si Ma Cai district with 4 bidding package .
07/09/2022 15:43
Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai publishes the plan Primary School for Ethnic Minority Affairs No. 1, Lung Than commune, Si Ma Cai district with 4 bidding package .
07/09/2022 15:38
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted the results of the bidding package Package No. 1: Construction of the 1st High School for Ethnic Minority Affairs, Lung Than commune, Si Ma Cai district of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai.
21/10/2022 08:38
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted the results of the bidding package Package No. 01: Construction of the construction work of Sin Cheng Secondary School, Sin Cheng Commune, Si Ma Cai District of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN TRƯỜNG SƠN
21/10/2022 08:35
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted the results of the bidding package Package No. 1: Construction of secondary school in Si Ma Cai town, Si Ma Cai district (Item: Classroom + Exterior) of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai.
- Winning bidder: Công ty TNHH một thành viên Thái Sơn
25/09/2022 16:47
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted Tender Notice Tender package No 1: Construction of the 1st High School for Ethnic Minority Affairs, Lung Than commune, Si Ma Cai district of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai with the form National competitive bidding.
14/09/2022 16:01
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted Tender Notice Tender package No 01: Construction of the construction work of Sin Cheng Secondary School, Sin Cheng Commune, Si Ma Cai District of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai with the form National competitive bidding.
14/09/2022 15:53
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted the request Sin Cheng Secondary School for Secondary Education and Training, Si Ma Cai district of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai with 5 bidding package.
08/09/2022 07:40
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted the request Primary School for Ethnic Minority Affairs No. 1, Lung Than commune, Si Ma Cai district of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai with 4 bidding package.
07/09/2022 15:43
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted the request Primary School for Ethnic Minority Affairs No. 1, Lung Than commune, Si Ma Cai district of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai with 4 bidding package.
07/09/2022 15:38
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted Tender Notice Tender package No 1: Construction of secondary school in Si Ma Cai town, Si Ma Cai district (Item: Classroom + Exterior) of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai with the form National competitive bidding.
19/08/2022 11:01
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted Tender Notice Tender package No 1: Construction of secondary school in Si Ma Cai town, Si Ma Cai district (Item: Classroom + Exterior) of the investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai with the form National competitive bidding.
12/08/2022 16:20
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted 241 of the contractor selection plan, which contains 656 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted 99 Tender Notice in the 92 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has posted 38 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 38 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has a relationship with 47 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai is the investor of 45 package, of which 45 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai is the owner of 133 contractor selection plan. In which, they self-invite 133 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai is an investor with 37 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Si Ma cai, tỉnh Lào Cai is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code