Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. as follows:
- Has relationships with 51 contractor.
- Announced 138 investment development project, of which 38 projects have not yet announced the prequalification documents.
- Announced 136 contractor selection plans with a total of 467 bidding packages, of which 32 prequalification documents have not found the investment project.
- Has invited bids for 65 packages (with 77 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 97 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 39 packages with results that do not have tender notice or prequalification notice.
- There are 369 packages that have not fully posted the contractor selection results. Of these 362 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.44 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 153,842,015,000 VND, of which the total winning bid value is: 144,669,409,172 VND.
- The savings rate is: 5.96%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. as follows:
- Has relationships with 51 contractor.
- The average number of contractors participating in each bidding package is: 1.44 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 153,842,015,000 VND, in which the total winning value is: 144,669,409,172 VND.
- The savings rate is: 5.96%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 138 investment and development projects.
- As the owner of 115 Contractor selection plan in which 113 Contractor selection plan is self-published, and 2 Contractor selection plan is posted by other units.
- Being the investor of 80 bidding packages in which 77 packages are self-invited, and 3 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted the results of the bidding package Tender package No 05: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời..
- Winning bidder: CÔNG TY CP ĐẦU TƯ VÀ XÂY DỰNG PHƯỚC THÀNH
24/10/2024 08:03
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted Tender Notice Tender package No 05: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. with the form Open bidding.
18/10/2024 15:18
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted Tender Notice Tender package No 05: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. with the form Open bidding.
18/10/2024 14:25
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted Tender Notice Tender package No 04: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. with the form Open bidding.
18/10/2024 10:20
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted Tender Notice Tender package No 04: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. with the form Open bidding.
17/10/2024 17:26
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted the request Overcoming subsidence and landslides of roads in Khanh Hai commune. of the investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. with 3 bidding package.
16/10/2024 14:43
Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. Posted Development Investment Project Overcoming subsidence and landslides of roads in Khanh Hai commune..
16/10/2024 14:14
Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. Posted Development Investment Project Overcoming subsidence and landslides of roads in Khanh Hai commune..
16/10/2024 14:14
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted the request Overcoming subsidence and landslides of roads in Khanh Hai commune. of the investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. with 5 bidding package.
16/10/2024 14:01
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted the request Overcoming subsidence and landslides of roads in Khanh Hung commune (Coi Nhi route, Nha Cay B - Kinh Dinh A hamlet) of the investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. with 5 bidding package.
16/10/2024 10:10
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. announced the results of the bid package Tender package No 05: Construction work .
- Winning bidder: CÔNG TY CP ĐẦU TƯ VÀ XÂY DỰNG PHƯỚC THÀNH
24/10/2024 08:03
Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. announced the results of the bidding package Bidding package No. 09: Construction works (construction items) with 1 participating contractors .
21/10/2024 08:04
Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. publishes Tender Notice Tender package No 05: Construction work in the form Open bidding .
18/10/2024 15:18
Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. publishes Tender Notice Tender package No 05: Construction work in the form Open bidding .
18/10/2024 14:25
Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. publishes Tender Notice Tender package No 04: Construction work in the form Open bidding .
18/10/2024 10:20
Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. publishes Tender Notice Tender package No 04: Construction work in the form Open bidding .
17/10/2024 17:26
Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. publishes the plan Overcoming subsidence and landslides of roads in Khanh Hai commune. with 3 bidding package .
16/10/2024 14:43
Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. publishes the plan Overcoming subsidence and landslides of roads in Khanh Hai commune. with 5 bidding package .
16/10/2024 14:01
Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. publishes the plan Overcoming subsidence and landslides of roads in Khanh Hung commune (Coi Nhi route, Nha Cay B - Kinh Dinh A hamlet) with 5 bidding package .
16/10/2024 10:10
Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. publishes the plan Overcoming subsidence of roads in Khanh Hung commune (Industry route, Industry C - Industry B hamlets, Kinh Hang A route, Kinh Hang B hamlet) with 4 bidding package .
16/10/2024 08:47
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted the results of the bidding package Tender package No 05: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời..
- Winning bidder: CÔNG TY CP ĐẦU TƯ VÀ XÂY DỰNG PHƯỚC THÀNH
24/10/2024 08:03
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted Tender Notice Tender package No 05: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. with the form Open bidding.
18/10/2024 15:18
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted Tender Notice Tender package No 05: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. with the form Open bidding.
18/10/2024 14:25
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted Tender Notice Tender package No 04: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. with the form Open bidding.
18/10/2024 10:20
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted Tender Notice Tender package No 04: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. with the form Open bidding.
17/10/2024 17:26
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted the request Overcoming subsidence and landslides of roads in Khanh Hai commune. of the investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. with 3 bidding package.
16/10/2024 14:43
Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. Posted Development Investment Project Overcoming subsidence and landslides of roads in Khanh Hai commune..
16/10/2024 14:14
Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. Posted Development Investment Project Overcoming subsidence and landslides of roads in Khanh Hai commune..
16/10/2024 14:14
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted the request Overcoming subsidence and landslides of roads in Khanh Hai commune. of the investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. with 5 bidding package.
16/10/2024 14:01
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted the request Overcoming subsidence and landslides of roads in Khanh Hung commune (Coi Nhi route, Nha Cay B - Kinh Dinh A hamlet) of the investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. with 5 bidding package.
16/10/2024 10:10
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted 136 of the contractor selection plan, which contains 467 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted 77 Tender Notice in the 65 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has posted 97 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 97 package, canceled the bid 0 package (among the bidding packages above).
- There are 39 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has a relationship with 51 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. has a relationship with 2 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. is the investor of 80 package, of which 77 package is self-invited, other units invite bid 3 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. is the owner of 115 contractor selection plan. In which, they self-invite 113 of contractor selection plan, other units invite bids of 2 of contractor selection plan.
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. is an investor with 55 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Trần Văn Thời. is the investor of 138 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code