Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư xây dựng huyện Yên Thế as follows:
- Has relationships with 59 contractor.
- Announced 89 investment development project, of which 11 projects have not yet announced the prequalification documents.
- Announced 90 contractor selection plans with a total of 191 bidding packages, of which 39 prequalification documents have not found the investment project.
- Has invited bids for 18 packages (with 21 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 326 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 312 packages with results that do not have tender notice or prequalification notice.
- There are 75 packages that have not fully posted the contractor selection results. Of these 75 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.25 contractors.
- Breakdown by bidding field: Goods 23.81%, Construction 76.19%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 185,672,615,000 VND, of which the total winning bid value is: 178,377,853,700 VND.
- The savings rate is: 3.93%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư xây dựng huyện Yên Thế as follows:
- Has relationships with 59 contractor.
- The average number of contractors participating in each bidding package is: 1.25 contractors.
- Proportion of bidding fields: Goods 23.81%, Construction 76.19%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 185,672,615,000 VND, in which the total winning value is: 178,377,853,700 VND.
- The savings rate is: 3.93%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 89 investment and development projects.
- As the owner of 178 Contractor selection plan in which 83 Contractor selection plan is self-published, and 95 Contractor selection plan is posted by other units.
- Being the investor of 57 bidding packages in which 5 packages are self-invited, and 52 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the request Contractor selection plan for the investment preparation phase Project: Path leading to the ritual gate, path behind the temple and auxiliary items for the 3-storey roof pavilion of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế with 1 bidding package.
24/10/2024 15:54
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the request Contractor selection plan for investment preparation phase Project: Repairing 8-classroom house; Function room of Dong Lac Secondary School of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế with 1 bidding package.
18/10/2024 17:25
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the request Contractor selection plan for investment preparation phase Project: New construction of Dong Lac Secondary School gate of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế with 1 bidding package.
18/10/2024 16:59
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the request Contractor selection plan for the investment preparation phase Project: Renovating and upgrading school gates, perimeter walls + building a security house for Canh Nau Secondary School of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế with 1 bidding package.
18/10/2024 15:51
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the request Contractor selection plan for the investment preparation phase of Canh Nau Secondary School Repair Project Item: Lime wall paint, floor tiling...12 classrooms of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế with 1 bidding package.
18/10/2024 15:38
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the request Road, underground to Dong Vuong landfill of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế with 2 bidding package.
21/09/2024 14:39
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the request Road, underground to Dong Vuong landfill of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế with 2 bidding package.
21/09/2024 11:02
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the results of the bidding package Construction insurance for the construction of bypass road in Mo Trang town (section from National Highway 17, Cham village to the center of Tam Tien commune), Yen The district of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế.
20/08/2023 18:48
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the results of the bidding package Construction insurance Renovating and upgrading bypass road from Tel.292 to Tel.242 of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế.
- Winning bidder: Công ty bảo hiểm Bưu điện Bắc Giang
20/08/2023 18:37
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the results of the bidding package Construction insurance of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế.
20/08/2023 18:00
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án đầu tư xây dựng huyện Yên Thế publishes the plan Contractor selection plan for the investment preparation phase Project: Path leading to the ritual gate, path behind the temple and auxiliary items for the 3-storey roof pavilion with 1 bidding package .
24/10/2024 15:54
Ban quản lý dự án đầu tư xây dựng huyện Yên Thế publishes the plan Contractor selection plan for investment preparation phase Project: Repairing 8-classroom house; Function room of Dong Lac Secondary School with 1 bidding package .
18/10/2024 17:25
Ban quản lý dự án đầu tư xây dựng huyện Yên Thế publishes the plan Contractor selection plan for investment preparation phase Project: New construction of Dong Lac Secondary School gate with 1 bidding package .
18/10/2024 16:59
Ban quản lý dự án đầu tư xây dựng huyện Yên Thế publishes the plan Contractor selection plan for the investment preparation phase Project: Renovating and upgrading school gates, perimeter walls + building a security house for Canh Nau Secondary School with 1 bidding package .
18/10/2024 15:51
Ban quản lý dự án đầu tư xây dựng huyện Yên Thế publishes the plan Contractor selection plan for the investment preparation phase of Canh Nau Secondary School Repair Project Item: Lime wall paint, floor tiling...12 classrooms with 1 bidding package .
18/10/2024 15:38
Ban quản lý dự án đầu tư xây dựng huyện Yên Thế publishes the plan Road, underground to Dong Vuong landfill with 2 bidding package .
21/09/2024 14:39
Ban quản lý dự án đầu tư xây dựng huyện Yên Thế publishes the plan Road, underground to Dong Vuong landfill with 2 bidding package .
21/09/2024 11:02
Ban quản lý dự án đầu tư xây dựng huyện Yên Thế announced the results of the bid package Construction insurance for the construction of bypass road in Mo Trang town (section from National Highway 17, Cham village to the center of Tam Tien commune), Yen The district .
- Winning bidder: Công ty bảo hiểm Bưu điện Bắc Giang
20/08/2023 18:48
Ban quản lý dự án đầu tư xây dựng huyện Yên Thế announced the results of the bid package Construction insurance Renovating and upgrading bypass road from Tel.292 to Tel.242 .
- Winning bidder: Công ty bảo hiểm Bưu điện Bắc Giang
20/08/2023 18:37
Ban quản lý dự án đầu tư xây dựng huyện Yên Thế announced the results of the bid package Construction insurance .
- Winning bidder: Công ty Bảo hiểm BSH Bắc Lạng
20/08/2023 18:00
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the request Contractor selection plan for the investment preparation phase Project: Path leading to the ritual gate, path behind the temple and auxiliary items for the 3-storey roof pavilion of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế with 1 bidding package.
24/10/2024 15:54
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the request Contractor selection plan for investment preparation phase Project: Repairing 8-classroom house; Function room of Dong Lac Secondary School of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế with 1 bidding package.
18/10/2024 17:25
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the request Contractor selection plan for investment preparation phase Project: New construction of Dong Lac Secondary School gate of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế with 1 bidding package.
18/10/2024 16:59
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the request Contractor selection plan for the investment preparation phase Project: Renovating and upgrading school gates, perimeter walls + building a security house for Canh Nau Secondary School of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế with 1 bidding package.
18/10/2024 15:51
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the request Contractor selection plan for the investment preparation phase of Canh Nau Secondary School Repair Project Item: Lime wall paint, floor tiling...12 classrooms of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế with 1 bidding package.
18/10/2024 15:38
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the request Road, underground to Dong Vuong landfill of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế with 2 bidding package.
21/09/2024 14:39
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the request Road, underground to Dong Vuong landfill of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế with 2 bidding package.
21/09/2024 11:02
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the results of the bidding package Construction insurance for the construction of bypass road in Mo Trang town (section from National Highway 17, Cham village to the center of Tam Tien commune), Yen The district of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế.
20/08/2023 18:48
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the results of the bidding package Construction insurance Renovating and upgrading bypass road from Tel.292 to Tel.242 of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế.
- Winning bidder: Công ty bảo hiểm Bưu điện Bắc Giang
20/08/2023 18:37
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted the results of the bidding package Construction insurance of the investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế.
20/08/2023 18:00
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted 90 of the contractor selection plan, which contains 191 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted 21 Tender Notice in the 18 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has posted 326 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 326 package, canceled the bid 0 package (among the bidding packages above).
- There are 312 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has a relationship with 59 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
The data declared by the procuring entity is incorrect (missing agency code and having the same name as many other parties)
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế has a relationship with 4 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế is the investor of 57 package, of which 5 package is self-invited, other units invite bid 52 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế is the owner of 178 contractor selection plan. In which, they self-invite 83 of contractor selection plan, other units invite bids of 95 of contractor selection plan.
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế is an investor with 77 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Yên Thế is the investor of 89 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code