Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 as follows:
- Has relationships with 45 contractor.
- Announced 132 investment development project, of which 8 projects have not yet announced the prequalification documents.
- Announced 184 contractor selection plans with a total of 501 bidding packages, of which 80 prequalification documents have not found the investment project.
- Has invited bids for 19 packages (with 20 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 122 package, and canceled bids for 1 packages (among the packages mentioned above).
- There are 104 packages with results that do not have tender notice or prequalification notice.
- There are 250 packages that have not fully posted the contractor selection results. Of these 248 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.06 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 108,580,201,156 VND, of which the total winning bid value is: 107,157,336,200 VND.
- The savings rate is: 1.31%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 as follows:
- Has relationships with 45 contractor.
- The average number of contractors participating in each bidding package is: 1.06 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 108,580,201,156 VND, in which the total winning value is: 107,157,336,200 VND.
- The savings rate is: 1.31%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 132 investment and development projects.
- As the owner of 268 Contractor selection plan in which 183 Contractor selection plan is self-published, and 85 Contractor selection plan is posted by other units.
- Being the investor of 106 bidding packages in which 20 packages are self-invited, and 86 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT is preparing to invest in the project of renovating and upgrading Da Nam Park, Ward 3, District 8 of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 16:48
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT is in the preparation phase of investing in the project of upgrading alley 01, 279 Tung Thien Vuong, alley 16 Uu Long and installing cameras in Ward 11, District 8. of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 16:20
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT in the investment preparation phase of the project Upgrading alley 468, 486 Tung Thien Vuong and installing sports equipment and cameras on Bui Huy Bich street of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 16:15
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT is preparing to invest in Alley Cluster 623, 627 Hung Phu, District 8 of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 15:04
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT is preparing to invest in the project of upgrading alley 263 Ba Dinh and installing outdoor sports equipment at 310 Hung Phu Park, District 8. of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 13:43
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request Planning and investment preparation for the Alley project in front of Nguyen Cong Tru Primary School, District 8 of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 12:06
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT is in the preparation phase of investing in the project of upgrading Road 27 and Road 29, District 8 of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 11:57
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT in the preparation phase of investing in the Alley Cluster 1E, 5F, 8F Hoang Si Khai project, District 8 of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 11:49
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT is preparing to invest in Alley 329 Luu Huu Phuoc, District 8 of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 10:39
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT is preparing to invest in Alley Cluster 623, 627 Hung Phu, District 8 of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 10:30
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 publishes the plan KHLCNT is preparing to invest in the project of renovating and upgrading Da Nam Park, Ward 3, District 8 with 2 bidding package .
28/10/2024 16:48
Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 publishes the plan KHLCNT is in the preparation phase of investing in the project of upgrading alley 01, 279 Tung Thien Vuong, alley 16 Uu Long and installing cameras in Ward 11, District 8. with 2 bidding package .
28/10/2024 16:20
Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 publishes the plan KHLCNT in the investment preparation phase of the project Upgrading alley 468, 486 Tung Thien Vuong and installing sports equipment and cameras on Bui Huy Bich street with 2 bidding package .
28/10/2024 16:15
Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 publishes the plan KHLCNT is preparing to invest in Alley Cluster 623, 627 Hung Phu, District 8 with 2 bidding package .
28/10/2024 15:04
Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 publishes the plan KHLCNT is preparing to invest in the project of upgrading alley 263 Ba Dinh and installing outdoor sports equipment at 310 Hung Phu Park, District 8. with 2 bidding package .
28/10/2024 13:43
Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 publishes the plan Planning and investment preparation for the Alley project in front of Nguyen Cong Tru Primary School, District 8 with 2 bidding package .
28/10/2024 12:06
Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 publishes the plan KHLCNT is in the preparation phase of investing in the project of upgrading Road 27 and Road 29, District 8 with 2 bidding package .
28/10/2024 11:57
Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 publishes the plan KHLCNT in the preparation phase of investing in the Alley Cluster 1E, 5F, 8F Hoang Si Khai project, District 8 with 2 bidding package .
28/10/2024 11:49
Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 publishes the plan KHLCNT is preparing to invest in Alley 329 Luu Huu Phuoc, District 8 with 2 bidding package .
28/10/2024 10:39
Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 publishes the plan KHLCNT is preparing to invest in Alley Cluster 623, 627 Hung Phu, District 8 with 2 bidding package .
28/10/2024 10:30
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT is preparing to invest in the project of renovating and upgrading Da Nam Park, Ward 3, District 8 of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 16:48
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT is in the preparation phase of investing in the project of upgrading alley 01, 279 Tung Thien Vuong, alley 16 Uu Long and installing cameras in Ward 11, District 8. of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 16:20
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT in the investment preparation phase of the project Upgrading alley 468, 486 Tung Thien Vuong and installing sports equipment and cameras on Bui Huy Bich street of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 16:15
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT is preparing to invest in Alley Cluster 623, 627 Hung Phu, District 8 of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 15:04
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT is preparing to invest in the project of upgrading alley 263 Ba Dinh and installing outdoor sports equipment at 310 Hung Phu Park, District 8. of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 13:43
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request Planning and investment preparation for the Alley project in front of Nguyen Cong Tru Primary School, District 8 of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 12:06
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT is in the preparation phase of investing in the project of upgrading Road 27 and Road 29, District 8 of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 11:57
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT in the preparation phase of investing in the Alley Cluster 1E, 5F, 8F Hoang Si Khai project, District 8 of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 11:49
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT is preparing to invest in Alley 329 Luu Huu Phuoc, District 8 of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 10:39
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted the request KHLCNT is preparing to invest in Alley Cluster 623, 627 Hung Phu, District 8 of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 with 2 bidding package.
28/10/2024 10:30
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted 184 of the contractor selection plan, which contains 501 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted 20 Tender Notice in the 19 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has posted 122 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 122 package, canceled the bid 1 package (among the bidding packages above).
- There are 104 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has a relationship with 45 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 has a relationship with 13 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 is the investor of 106 package, of which 20 package is self-invited, other units invite bid 86 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 is the owner of 268 contractor selection plan. In which, they self-invite 183 of contractor selection plan, other units invite bids of 85 of contractor selection plan.
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 is an investor with 71 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực Quận 8 is the investor of 132 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code