Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng số 1 as follows:
- Has relationships with 1 project owners.
- Has relationships with 175 contractor.
- Announced 71 investment development project, of which 6 projects have not yet announced the prequalification documents.
- Announced 67 contractor selection plans with a total of 259 bidding packages, of which 13 prequalification documents have not found the investment project.
- Has invited bids for 31 packages (with 35 tender notices), and conducted prequalification for 0 packages.
- There are 2 bidding packages with content that needs clarification.
- Announced the results of 95 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 64 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 148 packages that have not fully posted the contractor selection results. Of these 145 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.83 contractors.
- Breakdown by bidding field: Goods 0%, Construction 17.14%, Consultancy 80.00%, Non-consultancy 2.86%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,438,114,215,601 VND, of which the total winning bid value is: 1,180,905,378,102 VND.
- The savings rate is: 17.89%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng số 1 as follows:
- Has relationships with 175 contractor.
- The average number of contractors participating in each bidding package is: 1.83 contractors.
- Proportion of bidding fields: Goods 0%, Construction 17.14%, Consulting 80.00%, Non-consulting 2.86%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,438,114,215,601 VND, in which the total winning value is: 1,180,905,378,102 VND.
- The savings rate is: 17.89%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban Quản lý dự án đầu tư xây dựng số 1 are as follows:
- Is the investor of 71 development investment projects.
- Is the investor of 133 contractor selection plans, of which 67 were self-published, and 66 were published by other entities.
- Is the investor of 96 Tender Notices, of which 35 were self-invited, and 61 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Ban Quản lý dự án đầu tư xây dựng số 1 announced the results of the bid package Bidding package No. 13: Consulting on appraisal of environmental documents (HSYC), appraisal of contractor selection results for bidding packages No. 01, 02, 03, 04, 05, 06, 07, 08, 19, 20, 21, 22, 24, 25 26, 27, 28 .
- Winning bidder: A CHAU CONSTRUCTION CONSULTANCY JOINT STOCK COMPANY
07/01/2026 09:38
Ban Quản lý dự án đầu tư xây dựng số 1 announced the results of the bid package Bidding package No. 12: Consulting on preparing Bidding Documents (HSYC), evaluating Bidding Documents (Proposal) for bidding packages No. 01, 02, 03, 04, 05, 06, 07, 08, 19, 20, 21, 22, 24, 25 26, 27, 28 .
- Winning bidder: Công ty Cổ phần Tư vấn Xây dựng và Môi trường đô thị
07/01/2026 09:36
Ban Quản lý dự án đầu tư xây dựng số 1 publishes the plan Plan for selecting contractors for the project of Construction of a 3-storey classroom building (15 classrooms) and auxiliary items for Tran Quang Khai High School with 10 bidding package .
07/01/2026 09:33
Investor Ban Quản lý dự án đầu tư xây dựng số 1 has posted an investment and development project Building a 03 -storey class house (15 classrooms) and auxiliary items of Tran Quang Khai High School.
07/01/2026 09:09
Ban Quản lý dự án đầu tư xây dựng số 1 publishes Tender Notice Package 02: Consultancy on construction drawing design in the form Open bidding .
06/01/2026 16:38
Ban Quản lý dự án đầu tư xây dựng số 1 publishes the plan Plan for selecting contractor projects to build Hai Hung Bridge through Chanh River, connecting Hung Yen and Hai Duong provinces with 17 bidding package .
06/01/2026 10:50
Ban Quản lý dự án đầu tư xây dựng số 1 publishes the plan Contractor selection plan for An Thi High School Construction project (Category: Administrative area and functional classrooms; classroom building, some subject classrooms, multi-purpose building and auxiliary items) with 7 bidding package .
05/01/2026 16:10
Ban Quản lý dự án đầu tư xây dựng số 1 announced the results of the bid package Package No. 1: Project management consulting .
- Winning bidder: HTHT VIET NAM COMPANY LIMITED
05/01/2026 15:16
Investor Ban Quản lý dự án đầu tư xây dựng số 1 has posted an investment and development project Building An Thi High School (Category: Administrative Administration Area and Functional classrooms; classrooms, some subject classrooms, versatile houses and auxiliary items).
05/01/2026 15:15
Ban Quản lý dự án đầu tư xây dựng số 1 announced the results of the bid package Package No. 3: Construction supervision consulting, equipment installation supervision .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI BÌNH MINH HƯNG YÊN
05/01/2026 15:13
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng số 1 announced the results of the bid package Package 09: Construction insurance .
- Winning bidder: LPBank Insurance Joint Stock Corporation
10/12/2025 11:03
Ban Quản lý dự án đầu tư xây dựng số 1 announced the results of the bid package Package No. 03: Survey consulting, construction drawing design, estimates and site clearance pile installation .
- Winning bidder: Công ty cổ phần tư vấn xây dựng và công nghệ ATP, THAI BINH INFRASTRUCTURE CONSULTANT CONSTRUCTION JOINT STOCK COMPANY
05/12/2025 09:04
Ban Quản lý dự án đầu tư xây dựng số 1 announced the results of the bid package Package No. 07: Construction of static compression of concrete piles .
- Winning bidder: HUNG YEN CONSTRUCTION AND CONSULTING GEOLOGICAL SURVEY COMPANY LIMITED
26/11/2025 14:23
Ban Quản lý dự án đầu tư xây dựng số 1 publishes the plan Plan for selecting contractors of East - Western Irrigation Construction Investment Project (from DT.378 to DT.382B) with 6 bidding package .
26/11/2025 10:25
Ban Quản lý dự án đầu tư xây dựng số 1 announced the results of the bid package Bidding package No. 04: Consulting on preparation of bidding documents, evaluation of bidding documents for construction packages .
- Winning bidder: HA NOI DEVELOPMENT TRADING AND CONSULTANT CONSTRUCTION JOINT STOCK COMPANY
20/11/2025 14:09
Ban Quản lý dự án đầu tư xây dựng số 1 publishes the plan Plan for selecting contractors to upgrade and renovate DT.377 sections from QL.39 (Km31+00) to Thi Thi (Km37+500) with 9 bidding package .
19/11/2025 13:21
Ban Quản lý dự án đầu tư xây dựng số 1 announced the results of the bid package Bidding package 07: Experimental bored pile experiments, Test testing tests for reinforced concrete piles .
- Winning bidder: HUNG YEN CONSTRUCTION INSPECTION CONSULTANT COMPANY LIMITED
11/11/2025 08:47
Ban Quản lý dự án đầu tư xây dựng số 1 publishes the plan Plan to select contractors for the project of new construction of the road from the intersection of National Highway 39 at Truong Xa village, Toan Thang commune to the intersection of the two highways Hanoi - Hai Phong and Cau Gie - Ninh Binh, connecting and expanding DH.73 Kim Dong district from Km0+000 to Km1+550 with 3 bidding package .
11/11/2025 08:38
Ban Quản lý dự án đầu tư xây dựng số 1 publishes the plan Plan to select contractors for the project Construction of side road section Km19+640 (intersection with National Highway 38B) to Km24+240 (intersection with National Highway 39) adjacent to the road connecting Hanoi - Hai Phong expressway with Cau Gie - Ninh Binh expressway, section passing through Hung Yen city with 1 bidding package .
10/11/2025 09:38
Ban Quản lý dự án đầu tư xây dựng số 1 announced the results of the bid package Package No. 08: Construction supervision and equipment installation .
- Winning bidder: SON HAI JOINT STOCK COMPANY, VIETNAM TSQ JOINT STOCK COMPANY
03/11/2025 22:18
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng số 1 announced the results of the bid package Bidding package No. 13: Consulting on appraisal of environmental documents (HSYC), appraisal of contractor selection results for bidding packages No. 01, 02, 03, 04, 05, 06, 07, 08, 19, 20, 21, 22, 24, 25 26, 27, 28 .
- Winning bidder: A CHAU CONSTRUCTION CONSULTANCY JOINT STOCK COMPANY
07/01/2026 09:38
Ban Quản lý dự án đầu tư xây dựng số 1 announced the results of the bid package Bidding package No. 12: Consulting on preparing Bidding Documents (HSYC), evaluating Bidding Documents (Proposal) for bidding packages No. 01, 02, 03, 04, 05, 06, 07, 08, 19, 20, 21, 22, 24, 25 26, 27, 28 .
- Winning bidder: Công ty Cổ phần Tư vấn Xây dựng và Môi trường đô thị
07/01/2026 09:36
Ban Quản lý dự án đầu tư xây dựng số 1 publishes the plan Plan for selecting contractors for the project of Construction of a 3-storey classroom building (15 classrooms) and auxiliary items for Tran Quang Khai High School with 10 bidding package .
07/01/2026 09:33
Investor Ban Quản lý dự án đầu tư xây dựng số 1 has posted an investment and development project Building a 03 -storey class house (15 classrooms) and auxiliary items of Tran Quang Khai High School.
07/01/2026 09:09
Ban Quản lý dự án đầu tư xây dựng số 1 publishes Tender Notice Package 02: Consultancy on construction drawing design in the form Open bidding .
06/01/2026 16:38
Ban Quản lý dự án đầu tư xây dựng số 1 publishes the plan Plan for selecting contractor projects to build Hai Hung Bridge through Chanh River, connecting Hung Yen and Hai Duong provinces with 17 bidding package .
06/01/2026 10:50
Ban Quản lý dự án đầu tư xây dựng số 1 publishes the plan Contractor selection plan for An Thi High School Construction project (Category: Administrative area and functional classrooms; classroom building, some subject classrooms, multi-purpose building and auxiliary items) with 7 bidding package .
05/01/2026 16:10
Ban Quản lý dự án đầu tư xây dựng số 1 announced the results of the bid package Package No. 1: Project management consulting .
- Winning bidder: HTHT VIET NAM COMPANY LIMITED
05/01/2026 15:16
Investor Ban Quản lý dự án đầu tư xây dựng số 1 has posted an investment and development project Building An Thi High School (Category: Administrative Administration Area and Functional classrooms; classrooms, some subject classrooms, versatile houses and auxiliary items).
05/01/2026 15:15
Ban Quản lý dự án đầu tư xây dựng số 1 announced the results of the bid package Package No. 3: Construction supervision consulting, equipment installation supervision .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI BÌNH MINH HƯNG YÊN
05/01/2026 15:13
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án đầu tư xây dựng số 1 has posted 67 of the contractor selection plan, which contains 259 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 1 has posted 35 Tender Notices in 31 bidding packages. Among these, 35 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 1 has posted 95 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 95 package, canceled the bid 0 package (among the bidding packages above).
- There are 64 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 1 has a relationship with 175 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 1 has a relationship with 24 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban Quản lý dự án đầu tư xây dựng số 1 has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects