Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án Khu vực I as follows:
- Has relationships with 1 project owners.
- Has relationships with 78 contractor.
- Announced 50 investment development project, of which 4 projects have not yet announced the prequalification documents.
- Announced 64 contractor selection plans with a total of 202 bidding packages, of which 8 prequalification documents have not found the investment project.
- Has invited bids for 29 packages (with 31 tender notices), and conducted prequalification for 0 packages.
- There are 2 bidding packages with content that needs clarification.
- Announced the results of 225 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 197 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 37 packages that have not fully posted the contractor selection results. Of these 37 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.21 contractors.
- Breakdown by bidding field: Goods 0%, Construction 83.87%, Consultancy 16.13%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 263,748,825,000 VND, of which the total winning bid value is: 252,304,558,810 VND.
- The savings rate is: 4.34%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án Khu vực I as follows:
- Has relationships with 78 contractor.
- The average number of contractors participating in each bidding package is: 1.21 contractors.
- Proportion of bidding fields: Goods 0%, Construction 83.87%, Consulting 16.13%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 263,748,825,000 VND, in which the total winning value is: 252,304,558,810 VND.
- The savings rate is: 4.34%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban Quản lý dự án Khu vực I are as follows:
- Is the investor of 50 development investment projects.
- Is the investor of 65 contractor selection plans, of which 63 were self-published, and 2 were published by other entities.
- Is the investor of 40 Tender Notices, of which 31 were self-invited, and 9 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 16 bidding packages, of which 16 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 93.29% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.83% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Lạng Sơn (10), Undefined (6)
- Provinces before the merger where the contractor has participated in bidding : Lạng Sơn (10), Undefined (6)
- Has relationships with 1 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Ban Quản lý dự án Khu vực I announced the results of the bid package Civil Works .
- Winning bidder: TAM KHANG THAI CONSTRUCTION JOINT STOCK COMPANY
22/12/2025 11:09
Ban Quản lý dự án Khu vực I announced the results of the bid package Turn on the power for acceptance .
- Winning bidder: NORTHERN POWER CORPORATION
24/10/2025 17:03
Ban Quản lý dự án Khu vực I publishes the plan Adjust and supplement the contractor selection plan for the project External road and technical infrastructure of the resettlement area under the Provincial Police Headquarters project with 1 bidding package .
24/10/2025 15:56
Ban Quản lý dự án Khu vực I announced the results of the bid package Survey consultancy, adjustment of construction drawing designs and construction cost estimates .
- Winning bidder: LANG SON TRANSPORT CONSTRUCTION CONSULTANCY JOINT STOCK COMPANY
30/09/2025 14:23
Ban Quản lý dự án Khu vực I publishes the plan Decision on approving the addition of project contractor selection plan: Sub -resettlement area block 2, Vinh Trai ward, Lang Son city with 3 bidding package .
23/09/2025 16:55
Investor Ban Quản lý dự án Khu vực I has posted an investment and development project Sub -resettlement area block 2, Vinh Trai ward, Lang Son city.
23/09/2025 16:16
The Bid solicitor Ban Quản lý dự án Khu vực I has posted the results of the bidding package Survey consultancy, Economic and technical report on construction construction of the investor Ban Quản lý dự án Khu vực I.
- Winning bidder: NHAN HOA COMPANY LIMITED
27/06/2025 16:39
The Bid solicitor Ban Quản lý dự án Khu vực I has posted the results of the bidding package Consulting on verification of drawing designs, construction cost estimates of the investor Ban Quản lý dự án Khu vực I.
- Winning bidder: Công ty cổ phần tư vấn, Đầu tư và xây dựng CDCC
26/06/2025 15:09
The Bid solicitor Ban Quản lý dự án Khu vực I has posted the request The plan for contractor selection phase preparation of Luong Van Tri street project (Bac Son - Ba Trieu section) of the investor Ban Quản lý dự án Khu vực I with 2 bidding package.
26/06/2025 11:24
The Bid solicitor Ban Quản lý dự án Khu vực I has posted the results of the bidding package Construction drawing design consulting of the investor Ban Quản lý dự án Khu vực I.
- Winning bidder: HA NOI LIGHTING CONSTRUCTION INVESTMENT - CONSULTANT JOINT STOCK COMPANY
23/06/2025 15:05
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án Khu vực I announced the results of the bid package Survey consultancy, Economic and technical report on construction construction .
- Winning bidder: NHAN HOA COMPANY LIMITED
27/06/2025 16:39
Ban Quản lý dự án Khu vực I announced the results of the bid package Consulting on verification of drawing designs, construction cost estimates .
- Winning bidder: Công ty cổ phần tư vấn, Đầu tư và xây dựng CDCC
26/06/2025 15:09
Ban Quản lý dự án Khu vực I publishes the plan The plan for contractor selection phase preparation of Luong Van Tri street project (Bac Son - Ba Trieu section) with 2 bidding package .
26/06/2025 11:24
Ban Quản lý dự án Khu vực I announced the results of the bid package Construction drawing design consulting .
- Winning bidder: HA NOI LIGHTING CONSTRUCTION INVESTMENT - CONSULTANT JOINT STOCK COMPANY
23/06/2025 15:05
Ban Quản lý dự án Khu vực I publishes the plan Project contractor selection plan:
Renovate and embellish intersection of Ly Thuong Kiet crossroads with Tran Phu Street (Phu Loc Urban Area IV) with 5 bidding package .
19/06/2025 09:08
Ban Quản lý dự án Khu vực I publishes the plan Project contractor selection plan: Renovating and upgrading existing lighting lights with energy -saving LED lights in Lang Son city phase 2 with 2 bidding package .
17/06/2025 13:59
Ban Quản lý dự án Khu vực I announced the results of the bid package Consulting, surveying, making feasibility study report for construction work .
- Winning bidder: HA NOI LIGHTING CONSTRUCTION INVESTMENT - CONSULTANT JOINT STOCK COMPANY
27/05/2025 15:33
Ban Quản lý dự án Khu vực I publishes the plan Renovating and upgrading existing lights with energy -saving LED lights in Lang Son city phase 2 with 1 bidding package .
26/05/2025 16:55
Ban Quản lý dự án Khu vực I publishes the plan The plan to select contractors to consult the preparation of the project to renovate and renovate the intersection of Ly Thuong Kiet crossroads with Tran Phu Street (Phu Loc Urban Area IV) with 2 bidding package .
15/05/2025 14:58
Ban Quản lý dự án Khu vực I announced the results of the bid package Consulting, surveying, making economic - technical reports for construction projects .
- Winning bidder: T&D DESIGNER CONSULTANTS AND CONSTRUCTON ONE MEMBER COMPANY LIMITED
15/05/2025 14:53
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án Khu vực I announced the results of the bid package Civil Works .
- Winning bidder: TAM KHANG THAI CONSTRUCTION JOINT STOCK COMPANY
22/12/2025 11:09
Ban Quản lý dự án Khu vực I announced the results of the bid package Turn on the power for acceptance .
- Winning bidder: NORTHERN POWER CORPORATION
24/10/2025 17:03
Ban Quản lý dự án Khu vực I publishes the plan Adjust and supplement the contractor selection plan for the project External road and technical infrastructure of the resettlement area under the Provincial Police Headquarters project with 1 bidding package .
24/10/2025 15:56
Ban Quản lý dự án Khu vực I announced the results of the bid package Survey consultancy, adjustment of construction drawing designs and construction cost estimates .
- Winning bidder: LANG SON TRANSPORT CONSTRUCTION CONSULTANCY JOINT STOCK COMPANY
30/09/2025 14:23
Ban Quản lý dự án Khu vực I publishes the plan Decision on approving the addition of project contractor selection plan: Sub -resettlement area block 2, Vinh Trai ward, Lang Son city with 3 bidding package .
23/09/2025 16:55
Investor Ban Quản lý dự án Khu vực I has posted an investment and development project Sub -resettlement area block 2, Vinh Trai ward, Lang Son city.
23/09/2025 16:16
The Bid solicitor Ban Quản lý dự án Khu vực I has posted the results of the bidding package Survey consultancy, Economic and technical report on construction construction of the investor Ban Quản lý dự án Khu vực I.
- Winning bidder: NHAN HOA COMPANY LIMITED
27/06/2025 16:39
The Bid solicitor Ban Quản lý dự án Khu vực I has posted the results of the bidding package Consulting on verification of drawing designs, construction cost estimates of the investor Ban Quản lý dự án Khu vực I.
- Winning bidder: Công ty cổ phần tư vấn, Đầu tư và xây dựng CDCC
26/06/2025 15:09
The Bid solicitor Ban Quản lý dự án Khu vực I has posted the request The plan for contractor selection phase preparation of Luong Van Tri street project (Bac Son - Ba Trieu section) of the investor Ban Quản lý dự án Khu vực I with 2 bidding package.
26/06/2025 11:24
The Bid solicitor Ban Quản lý dự án Khu vực I has posted the results of the bidding package Construction drawing design consulting of the investor Ban Quản lý dự án Khu vực I.
- Winning bidder: HA NOI LIGHTING CONSTRUCTION INVESTMENT - CONSULTANT JOINT STOCK COMPANY
23/06/2025 15:05
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án Khu vực I has posted 64 of the contractor selection plan, which contains 202 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án Khu vực I has posted 31 Tender Notices in 29 bidding packages. Among these, 31 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án Khu vực I has posted 225 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 225 package, canceled the bid 0 package (among the bidding packages above).
- There are 197 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án Khu vực I has a relationship with 78 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án Khu vực I has a relationship with 23 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban Quản lý dự án Khu vực I has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects