Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn as follows:
- Has relationships with 323 contractor.
- Announced 123 investment development project, of which 7 projects have not yet announced the prequalification documents.
- Announced 552 contractor selection plans with a total of 1540 bidding packages, of which 93 prequalification documents have not found the investment project.
- Has invited bids for 388 packages (with 463 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 683 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 365 packages with results that do not have tender notice or prequalification notice.
- There are 828 packages that have not fully posted the contractor selection results. Of these 790 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.46 contractors.
- Breakdown by bidding field: Goods 1.30%, Construction 72.14%, Consultancy 22.89%, Non-consultancy 3.67%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 4,493,015,483,558 VND, of which the total winning bid value is: 4,260,665,994,971 VND.
- The savings rate is: 5.17%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn as follows:
- Has relationships with 323 contractor.
- The average number of contractors participating in each bidding package is: 1.46 contractors.
- Proportion of bidding fields: Goods 1.30%, Construction 72.14%, Consulting 22.89%, Non-consulting 3.67%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 4,493,015,483,558 VND, in which the total winning value is: 4,260,665,994,971 VND.
- The savings rate is: 5.17%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 123 investment and development projects.
- As the owner of 219 Contractor selection plan in which 219 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 221 bidding packages in which 221 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted the results of the bidding package Tender package No 01: Construction of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn.
- Winning bidder: CÔNG TY CỔ PHẦN MÔI TRƯỜNG ĐÔ THỊ VÀ DỊCH VỤ DU LỊCH SẦM SƠN
19/10/2024 10:43
The Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted the results of the bidding package Package 02: Construction work (including ensuring traffic safety) of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn.
17/10/2024 15:39
Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted Tender Notice Package 02: Construction work (including insurance costs) of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn with the form Open bidding.
14/10/2024 11:16
The Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted the results of the bidding package Package 01: Consultant selection of contractor (Bidding package No. 02) of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI TRƯỜNG BẢO
11/10/2024 15:23
The Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted the request Approving the design and construction plan for the project of Renovating and embellishing the medical station of Guangzhou ward, Sam Son city (Item: Functional area and ancillary items) of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn with 4 bidding package.
11/10/2024 15:17
Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted Tender Notice Bidding package No. 02: Prepare construction design and deploy after basic design of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn with the form Open bidding.
10/10/2024 17:19
The Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted the results of the bidding package Bidding package No. 06 - Consulting
construction supervision
construction and installation
Place the device of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn.
- Winning bidder: CÔNG TY CỔ PHẦN XD TUẤN HÙNG
07/10/2024 14:50
Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted Tender Notice Package 02: Making regulations on architecture management of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn with the form Open bidding.
30/09/2024 08:41
The Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted the request Establishing regulations on architectural management of Sam Son city, Thanh Hoa province of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn with 2 bidding package.
30/09/2024 08:05
Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted Tender Notice Package 05: Construction work (including procurement and installation of equipment) of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn with the form Open bidding.
23/09/2024 15:37
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn announced the results of the bid package Tender package No 01: Construction .
- Winning bidder: CÔNG TY CỔ PHẦN MÔI TRƯỜNG ĐÔ THỊ VÀ DỊCH VỤ DU LỊCH SẦM SƠN
19/10/2024 10:43
Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn announced the results of the bidding package Package 02: Making regulations on architecture management with 1 participating contractors .
18/10/2024 16:41
Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn announced the results of the bid package Package 02: Construction work (including ensuring traffic safety) .
- Winning bidder:
17/10/2024 15:39
Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn publishes Tender Notice Package 02: Construction work (including insurance costs) in the form Open bidding .
14/10/2024 11:16
Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn announced the results of the bid package Package 01: Consultant selection of contractor (Bidding package No. 02) .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI TRƯỜNG BẢO
11/10/2024 15:23
Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn publishes the plan Approving the design and construction plan for the project of Renovating and embellishing the medical station of Guangzhou ward, Sam Son city (Item: Functional area and ancillary items) with 4 bidding package .
11/10/2024 15:17
Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn publishes Tender Notice Bidding package No. 02: Prepare construction design and deploy after basic design in the form Open bidding .
10/10/2024 17:19
Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn announced the results of the bid package Bidding package No. 06 - Consulting
construction supervision
construction and installation
Place the device .
- Winning bidder: CÔNG TY CỔ PHẦN XD TUẤN HÙNG
07/10/2024 14:50
Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn announced the results of the bidding package Package 05: Construction work (including procurement and installation of equipment) with 1 participating contractors .
04/10/2024 16:04
Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn publishes Tender Notice Package 02: Making regulations on architecture management in the form Open bidding .
30/09/2024 08:41
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted the results of the bidding package Tender package No 01: Construction of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn.
- Winning bidder: CÔNG TY CỔ PHẦN MÔI TRƯỜNG ĐÔ THỊ VÀ DỊCH VỤ DU LỊCH SẦM SƠN
19/10/2024 10:43
The Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted the results of the bidding package Package 02: Construction work (including ensuring traffic safety) of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn.
17/10/2024 15:39
Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted Tender Notice Package 02: Construction work (including insurance costs) of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn with the form Open bidding.
14/10/2024 11:16
The Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted the results of the bidding package Package 01: Consultant selection of contractor (Bidding package No. 02) of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI TRƯỜNG BẢO
11/10/2024 15:23
The Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted the request Approving the design and construction plan for the project of Renovating and embellishing the medical station of Guangzhou ward, Sam Son city (Item: Functional area and ancillary items) of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn with 4 bidding package.
11/10/2024 15:17
Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted Tender Notice Bidding package No. 02: Prepare construction design and deploy after basic design of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn with the form Open bidding.
10/10/2024 17:19
The Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted the results of the bidding package Bidding package No. 06 - Consulting
construction supervision
construction and installation
Place the device of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn.
- Winning bidder: CÔNG TY CỔ PHẦN XD TUẤN HÙNG
07/10/2024 14:50
Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted Tender Notice Package 02: Making regulations on architecture management of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn with the form Open bidding.
30/09/2024 08:41
The Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted the request Establishing regulations on architectural management of Sam Son city, Thanh Hoa province of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn with 2 bidding package.
30/09/2024 08:05
Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted Tender Notice Package 05: Construction work (including procurement and installation of equipment) of the investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn with the form Open bidding.
23/09/2024 15:37
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted 552 of the contractor selection plan, which contains 1540 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted 463 Tender Notice in the 388 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has posted 683 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 683 package, canceled the bid 0 package (among the bidding packages above).
- There are 365 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has a relationship with 323 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn is the investor of 221 package, of which 221 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn is the owner of 219 contractor selection plan. In which, they self-invite 219 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn is an investor with 297 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản Lý Dự Án Đầu Tư Xây Dựng Thành phố Sầm Sơn is the investor of 123 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code