Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu as follows:
- Has relationships with 172 contractor.
- Announced 103 investment development project, of which 9 projects have not yet announced the prequalification documents.
- Announced 156 contractor selection plans with a total of 649 bidding packages, of which 41 prequalification documents have not found the investment project.
- Has invited bids for 95 packages (with 104 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 332 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 255 packages with results that do not have tender notice or prequalification notice.
- There are 317 packages that have not fully posted the contractor selection results. Of these 307 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.45 contractors.
- Breakdown by bidding field: Goods 0.96%, Construction 67.31%, Consultancy 25.00%, Non-consultancy 6.73%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,083,277,784,335 VND, of which the total winning bid value is: 853,429,620,397 VND.
- The savings rate is: 21.22%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu as follows:
- Has relationships with 172 contractor.
- The average number of contractors participating in each bidding package is: 2.45 contractors.
- Proportion of bidding fields: Goods 0.96%, Construction 67.31%, Consulting 25.00%, Non-consulting 6.73%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,083,277,784,335 VND, in which the total winning value is: 853,429,620,397 VND.
- The savings rate is: 21.22%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 103 investment and development projects.
- As the owner of 156 Contractor selection plan in which 156 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 104 bidding packages in which 104 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted Tender Notice Construction of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu with the form Open bidding.
25/10/2024 20:23
Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted Tender Notice Construction supervision of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu with the form Open bidding.
25/10/2024 20:15
The Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted the request Handling flooded spots in Vung Tau city of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu with 9 bidding package.
25/10/2024 15:09
The Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted the results of the bidding package Making economic - technical reports of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu.
- Winning bidder: VUNG TAU ENVIRONMENTAL MONITORING AND CONSULTING JOINT STOCK COMPANY
25/10/2024 14:23
The Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted the request Construction of water drainage outlet from Rach Ba street 1 to Rach Ba lake, Ward 11 of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu with 1 bidding package.
24/10/2024 16:58
Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu Posted Development Investment Project Construction of water drainage outlet from Rach Ba street 1 to Rach Ba lake, Ward 11.
24/10/2024 16:16
The Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted the results of the bidding package Green tree system of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu.
- Winning bidder: HAI DANG GREEN TREES COMPANY LIMITED
24/10/2024 14:26
The Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted the results of the bidding package Insurance of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu.
- Winning bidder: military insurance corporation
24/10/2024 09:13
The Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted the results of the bidding package Consulting on construction supervision and equipment installation (not including highlight projects) of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu.
- Winning bidder: 625 CIVIL ENGINEERING CONSULTANTS JOINT STOCK COMPANY
23/10/2024 11:23
The Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted the results of the bidding package Construction supervision consultancy of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ CÔNG CHÍNH
23/10/2024 09:00
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu publishes Tender Notice Construction in the form Open bidding .
25/10/2024 20:23
Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu publishes Tender Notice Construction supervision in the form Open bidding .
25/10/2024 20:15
Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu publishes the plan Handling flooded spots in Vung Tau city with 9 bidding package .
25/10/2024 15:09
Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu announced the results of the bid package Making economic - technical reports .
- Winning bidder: VUNG TAU ENVIRONMENTAL MONITORING AND CONSULTING JOINT STOCK COMPANY
25/10/2024 14:23
Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu publishes the plan Construction of water drainage outlet from Rach Ba street 1 to Rach Ba lake, Ward 11 with 1 bidding package .
24/10/2024 16:58
Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu announced the results of the bid package Green tree system .
- Winning bidder: HAI DANG GREEN TREES COMPANY LIMITED
24/10/2024 14:26
Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu announced the results of the bid package Insurance .
- Winning bidder: military insurance corporation
24/10/2024 09:13
Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu announced the results of the bid package Consulting on construction supervision and equipment installation (not including highlight projects) .
- Winning bidder: NATIONAL GENERAL CONSTRUCTION CONSULTING JOINT STOCK COMPANY, 625 CIVIL ENGINEERING CONSULTANTS JOINT STOCK COMPANY
23/10/2024 11:23
Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ CÔNG CHÍNH
23/10/2024 09:00
Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu announced the results of the bid package Consulting on setting up bidding documents and evaluating bids for construction and equipment bidding packages .
- Winning bidder: LIEN HIEP CONSULTANT CONSTRUCTION CORPORATION
22/10/2024 14:12
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted Tender Notice Construction of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu with the form Open bidding.
25/10/2024 20:23
Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted Tender Notice Construction supervision of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu with the form Open bidding.
25/10/2024 20:15
The Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted the request Handling flooded spots in Vung Tau city of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu with 9 bidding package.
25/10/2024 15:09
The Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted the results of the bidding package Making economic - technical reports of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu.
- Winning bidder: VUNG TAU ENVIRONMENTAL MONITORING AND CONSULTING JOINT STOCK COMPANY
25/10/2024 14:23
The Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted the request Construction of water drainage outlet from Rach Ba street 1 to Rach Ba lake, Ward 11 of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu with 1 bidding package.
24/10/2024 16:58
Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu Posted Development Investment Project Construction of water drainage outlet from Rach Ba street 1 to Rach Ba lake, Ward 11.
24/10/2024 16:16
The Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted the results of the bidding package Green tree system of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu.
- Winning bidder: HAI DANG GREEN TREES COMPANY LIMITED
24/10/2024 14:26
The Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted the results of the bidding package Insurance of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu.
- Winning bidder: military insurance corporation
24/10/2024 09:13
The Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted the results of the bidding package Consulting on construction supervision and equipment installation (not including highlight projects) of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu.
- Winning bidder: 625 CIVIL ENGINEERING CONSULTANTS JOINT STOCK COMPANY
23/10/2024 11:23
The Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted the results of the bidding package Construction supervision consultancy of the investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ CÔNG CHÍNH
23/10/2024 09:00
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted 156 of the contractor selection plan, which contains 649 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted 104 Tender Notice in the 95 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has posted 332 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 332 package, canceled the bid 0 package (among the bidding packages above).
- There are 255 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has a relationship with 172 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu is the investor of 104 package, of which 104 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu is the owner of 156 contractor selection plan. In which, they self-invite 156 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu is an investor with 172 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án Đầu tư xây dựng thành phố Vũng Tàu is the investor of 103 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code