Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án giao thông I Thanh Hóa as follows:
- Has relationships with 47 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 22 contractor selection plans with a total of 58 bidding packages, of which 9 prequalification documents have not found the investment project.
- Has invited bids for 24 packages (with 29 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 31 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 9 packages with results that do not have tender notice or prequalification notice.
- There are 23 packages that have not fully posted the contractor selection results. Of these 23 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.33 contractors.
- Breakdown by bidding field: Goods 0%, Construction 51.72%, Consultancy 48.28%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 754,546,598,000 VND, of which the total winning bid value is: 743,486,168,000 VND.
- The savings rate is: 1.47%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án giao thông I Thanh Hóa as follows:
- Has relationships with 47 contractor.
- The average number of contractors participating in each bidding package is: 2.33 contractors.
- Proportion of bidding fields: Goods 0%, Construction 51.72%, Consulting 48.28%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 754,546,598,000 VND, in which the total winning value is: 743,486,168,000 VND.
- The savings rate is: 1.47%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 8 Contractor selection plan in which 8 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 8 bidding packages in which 8 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted the results of the bidding package Package No. 3a.1: Surveying, making construction technical plans, cost estimate for demining, mines and explosives of the investor Ban Quản lý dự án giao thông I Thanh Hóa.
03/12/2020 10:57
The Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted the results of the bidding package Package No. 3a.3: Supervising the clearance of mines and explosives of the investor Ban Quản lý dự án giao thông I Thanh Hóa.
- Winning bidder: Lữ đoàn công binh 279 thuộc Bộ Tư lệnh Công Binh
03/12/2020 10:53
The Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted the results of the bidding package Package No. 3a.2: Construction of clearing mines and explosives of the investor Ban Quản lý dự án giao thông I Thanh Hóa.
- Winning bidder: Lữ đoàn 299, Quân đoàn 1
03/12/2020 10:46
The Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted the results of the bidding package Package 5a: Construction work and construction insurance (phase 2) of the investor Ban Quản lý dự án giao thông I Thanh Hóa.
- Winning bidder: TỔNG CÔNG TY CÔNG TRÌNH GIAO THÔNG I THANH HÓA - CÔNG TY CỔ PHẦN
26/10/2020 21:27
Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted Tender Notice Package 5a: Construction work and construction insurance (phase 2) of the investor Ban Quản lý dự án giao thông I Thanh Hóa with the form National competitive bidding.
16/09/2020 15:52
The Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted the results of the bidding package Package 4: Construction work and construction insurance of the investor Ban Quản lý dự án giao thông I Thanh Hóa.
- Winning bidder: TỔNG CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG MINH TUẤN
31/08/2020 16:30
Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted Tender Notice Package 5a: Construction work and construction insurance (phase 2) of the investor Ban Quản lý dự án giao thông I Thanh Hóa with the form National competitive bidding.
27/08/2020 16:38
The Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted the request Plan to select contractor for road construction from Thanh Hoa city center to the road from Tho Xuan airport to Nghi Son economic zone of the investor Ban Quản lý dự án giao thông I Thanh Hóa with 17 bidding package.
18/08/2020 10:20
Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted Tender Notice Package 4: Construction work and construction insurance of the investor Ban Quản lý dự án giao thông I Thanh Hóa with the form National competitive bidding.
20/06/2020 23:28
Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted Tender Notice Package 4: Construction work and construction insurance of the investor Ban Quản lý dự án giao thông I Thanh Hóa with the form National competitive bidding.
20/06/2020 23:28
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án giao thông I Thanh Hóa announced the results of the bid package Package No. 3a.1: Surveying, making construction technical plans, cost estimate for demining, mines and explosives .
- Winning bidder: TRƯỜNG TRUNG CẤP KỸ THUẬT CÔNG BINH
03/12/2020 10:57
Ban Quản lý dự án giao thông I Thanh Hóa announced the results of the bid package Package No. 3a.3: Supervising the clearance of mines and explosives .
- Winning bidder: Lữ đoàn công binh 279 thuộc Bộ Tư lệnh Công Binh
03/12/2020 10:53
Ban Quản lý dự án giao thông I Thanh Hóa announced the results of the bid package Package No. 3a.2: Construction of clearing mines and explosives .
- Winning bidder: Lữ đoàn 299, Quân đoàn 1
03/12/2020 10:46
Ban Quản lý dự án giao thông I Thanh Hóa announced the results of the bid package Package 5a: Construction work and construction insurance (phase 2) .
- Winning bidder: CÔNG TY CỔ PHẦN TÂN THÀNH, TỔNG CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG MINH TUẤN, Tổng Công ty Đầu tư xây dựng Hoàng Long Công ty Cổ phần, TỔNG CÔNG TY CÔNG TRÌNH GIAO THÔNG I THANH HÓA - CÔNG TY CỔ PHẦN
26/10/2020 21:27
Ban Quản lý dự án giao thông I Thanh Hóa publishes Tender Notice Package 5a: Construction work and construction insurance (phase 2) in the form National competitive bidding .
16/09/2020 15:52
Ban Quản lý dự án giao thông I Thanh Hóa announced the results of the bid package Package 4: Construction work and construction insurance .
- Winning bidder: TỔNG CÔNG TY CÔNG TRÌNH GIAO THÔNG I THANH HÓA - CÔNG TY CỔ PHẦN, TỔNG CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG MINH TUẤN
31/08/2020 16:30
Ban Quản lý dự án giao thông I Thanh Hóa publishes Tender Notice Package 5a: Construction work and construction insurance (phase 2) in the form National competitive bidding .
27/08/2020 16:38
Ban Quản lý dự án giao thông I Thanh Hóa publishes the plan Plan to select contractor for road construction from Thanh Hoa city center to the road from Tho Xuan airport to Nghi Son economic zone with 17 bidding package .
18/08/2020 10:20
Ban Quản lý dự án giao thông I Thanh Hóa publishes Tender Notice Package 4: Construction work and construction insurance in the form National competitive bidding .
20/06/2020 23:28
Ban Quản lý dự án giao thông I Thanh Hóa publishes Tender Notice Package 4: Construction work and construction insurance in the form National competitive bidding .
20/06/2020 23:28
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted the results of the bidding package Package No. 3a.1: Surveying, making construction technical plans, cost estimate for demining, mines and explosives of the investor Ban Quản lý dự án giao thông I Thanh Hóa.
03/12/2020 10:57
The Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted the results of the bidding package Package No. 3a.3: Supervising the clearance of mines and explosives of the investor Ban Quản lý dự án giao thông I Thanh Hóa.
- Winning bidder: Lữ đoàn công binh 279 thuộc Bộ Tư lệnh Công Binh
03/12/2020 10:53
The Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted the results of the bidding package Package No. 3a.2: Construction of clearing mines and explosives of the investor Ban Quản lý dự án giao thông I Thanh Hóa.
- Winning bidder: Lữ đoàn 299, Quân đoàn 1
03/12/2020 10:46
The Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted the results of the bidding package Package 5a: Construction work and construction insurance (phase 2) of the investor Ban Quản lý dự án giao thông I Thanh Hóa.
- Winning bidder: TỔNG CÔNG TY CÔNG TRÌNH GIAO THÔNG I THANH HÓA - CÔNG TY CỔ PHẦN
26/10/2020 21:27
Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted Tender Notice Package 5a: Construction work and construction insurance (phase 2) of the investor Ban Quản lý dự án giao thông I Thanh Hóa with the form National competitive bidding.
16/09/2020 15:52
The Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted the results of the bidding package Package 4: Construction work and construction insurance of the investor Ban Quản lý dự án giao thông I Thanh Hóa.
- Winning bidder: TỔNG CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG MINH TUẤN
31/08/2020 16:30
Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted Tender Notice Package 5a: Construction work and construction insurance (phase 2) of the investor Ban Quản lý dự án giao thông I Thanh Hóa with the form National competitive bidding.
27/08/2020 16:38
The Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted the request Plan to select contractor for road construction from Thanh Hoa city center to the road from Tho Xuan airport to Nghi Son economic zone of the investor Ban Quản lý dự án giao thông I Thanh Hóa with 17 bidding package.
18/08/2020 10:20
Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted Tender Notice Package 4: Construction work and construction insurance of the investor Ban Quản lý dự án giao thông I Thanh Hóa with the form National competitive bidding.
20/06/2020 23:28
Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted Tender Notice Package 4: Construction work and construction insurance of the investor Ban Quản lý dự án giao thông I Thanh Hóa with the form National competitive bidding.
20/06/2020 23:28
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án giao thông I Thanh Hóa has posted 22 of the contractor selection plan, which contains 58 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted 29 Tender Notice in the 24 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has posted 31 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 31 package, canceled the bid 0 package (among the bidding packages above).
- There are 9 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án giao thông I Thanh Hóa has a relationship with 47 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án giao thông I Thanh Hóa has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án giao thông I Thanh Hóa is the investor of 8 package, of which 8 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án giao thông I Thanh Hóa is the owner of 8 contractor selection plan. In which, they self-invite 8 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban Quản lý dự án giao thông I Thanh Hóa is an investor with 40 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án giao thông I Thanh Hóa is the investor of 0 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code