Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án khu vực 06 as follows:
- Has relationships with 1 project owners.
- Has relationships with 115 contractor.
- Announced 206 investment development project, of which 9 projects have not yet announced the prequalification documents.
- Announced 97 contractor selection plans with a total of 465 bidding packages, of which 16 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 292 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 291 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 203 packages that have not fully posted the contractor selection results. Of these 202 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 406,861,686,747 VND, of which the total winning bid value is: 345,541,487,567 VND.
- The savings rate is: 15.07%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án khu vực 06 as follows:
- Has relationships with 115 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 406,861,686,747 VND, in which the total winning value is: 345,541,487,567 VND.
- The savings rate is: 15.07%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban Quản lý dự án khu vực 06 are as follows:
- Is the investor of 206 development investment projects.
- Is the investor of 117 contractor selection plans, of which 93 were self-published, and 24 were published by other entities.
- Is the investor of 127 Tender Notices, of which 0 were self-invited, and 127 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Investor Ban Quản lý dự án khu vực 06 has posted an investment and development project Upgrading and expanding Pham Thai Buong street, Dai Phuoc commune, Dong Nai province..
05/01/2026 09:09
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package 04 (non -advice): Building insurance .
- Winning bidder: Vien Dong Assurance Corporation
30/12/2025 10:57
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package No. 03 (Consulting): Construction supervision .
- Winning bidder: NHAN ANH DESIGN CONSULTANCY CONSTRUCTION COMPANY LIMITED
30/12/2025 10:54
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package number 30: Construction supervision of package 23 .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG THIỆN MỸ
30/12/2025 10:46
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package No. 29: Appraisal of QLCNT results for Package No. 23 .
30/12/2025 10:43
Ban Quản lý dự án khu vực 06 announced the results of the bid package Bidding Package No. 24: Preparation of Documents of Requirements and Evaluation of Proposals for Bidding Package No. 23 .
30/12/2025 10:41
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package No. 23 (construction): Relocation of electrical system .
- Winning bidder: VIET NAM ENVIROMENT AND ELECTRICAL MECHANIC JOINT STOCK COMPANY
30/12/2025 10:38
Ban Quản lý dự án khu vực 06 publishes the plan Approve adjustments to sections 12 and 13 of the appendix issued with Decision 12/QD-BQLDAKV06 dated August 4, 2025 of the Director of Regional Project Management Board 06 and approve the contractor selection plan for (next) bidding packages under the Lien Cang Road Construction Project, Nhon Trach district (phase 1) with 4 bidding package .
25/12/2025 11:00
Ban Quản lý dự án khu vực 06 announced the results of the bid package Bidding package number 01: Construction .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN THIẾT KẾ XÂY DỰNG ĐÌNH BÁCH
22/12/2025 09:01
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package 18 (Consulting): Specialized experiment .
- Winning bidder: SIEU VIET VERIFY AND MATERIALS JOINT STOCK COMPANY
03/12/2025 08:38
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package No. 09: Consulting, Testing and accepting the project into operation and use .
- Winning bidder: NHAT PHAT DESIGN CONSTRUCTION COMPANY LIMITED
02/12/2025 08:34
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package No. 08: Consulting on traffic safety verification .
- Winning bidder: Công ty Cổ phần Long Bình Mê Kông
20/11/2025 09:57
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package No. 17 (Consulting): Supervision of construction of package No. 08.09. .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG SÔNG ĐÀ (TÊN CŨ: CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG QUỲNH CHÂU), TRANSPORT ENGINEERING DESIGN INCORPORATED NORTH JOINT STOCK COMPANY
20/08/2025 10:27
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package 22 (Consulting): E-HSMT and E-HSDT Package 21. .
- Winning bidder: 360 CONSTRUCTION BUILDING COMPANY LIMITED
18/08/2025 10:20
Ban Quản lý dự án khu vực 06 announced the results of the bid package Bidding package No. 15 (Consulting): E-HSMT and E-HSDT assessment package 14. .
- Winning bidder: DANG KHOA INVESTMENT AND BIDDING CONSULTANCY COMPANY LIMITED
18/08/2025 08:49
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package No. 16 (Consulting): E-HSMT appraisal and evaluation of contractor selection results package No. 14 .
- Winning bidder: MINH DAO CONSTRUCTION MANAGEMENT COMPANY LIMITED
18/08/2025 08:43
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package 09 (Construction): section of Ong Keo Bridge, Rach La Bridge; Traffic safety parts and traffic safety during construction process .
- Winning bidder: DAI THIEN TRUONG JOINT STOCK COMPANY, MATERIAL EQUIPMENT AND CIVIL ENGINEERING JOINT-STOCK COMPANY 624
28/07/2025 17:34
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package No. 06 (Construction): Construction of drainage; Refining technical infrastructure (demolition and redoing gates, fences) and ensuring traffic security during the construction process. .
- Winning bidder: CUONG THUAN IDICO DEVELOPMENT INVESTMENT CORPORATION, VIET NAM CONSTRUCTION JOINT STOCK COMPANY NO 12
24/07/2025 15:05
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package 09 (Consulting): Supervision of construction package No. 06. .
- Winning bidder: NAM THANH CONSTRUCTION AND INVESTMENT CONSULTING COMPANY LIMITED
24/07/2025 08:30
Ban Quản lý dự án khu vực 06 publishes the plan Approving the contractor selection plan (continued) the road project to the Ong Kam Industrial Park (phase 1), Nhon Trach district with 8 bidding package .
17/07/2025 10:15
The data sheet has been partially hidden, to see the full information please Login or Register
Investor Ban Quản lý dự án khu vực 06 has posted an investment and development project Upgrading and expanding Pham Thai Buong street, Dai Phuoc commune, Dong Nai province..
05/01/2026 09:09
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package 04 (non -advice): Building insurance .
- Winning bidder: Vien Dong Assurance Corporation
30/12/2025 10:57
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package No. 03 (Consulting): Construction supervision .
- Winning bidder: NHAN ANH DESIGN CONSULTANCY CONSTRUCTION COMPANY LIMITED
30/12/2025 10:54
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package number 30: Construction supervision of package 23 .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG THIỆN MỸ
30/12/2025 10:46
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package No. 29: Appraisal of QLCNT results for Package No. 23 .
30/12/2025 10:43
Ban Quản lý dự án khu vực 06 announced the results of the bid package Bidding Package No. 24: Preparation of Documents of Requirements and Evaluation of Proposals for Bidding Package No. 23 .
30/12/2025 10:41
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package No. 23 (construction): Relocation of electrical system .
- Winning bidder: VIET NAM ENVIROMENT AND ELECTRICAL MECHANIC JOINT STOCK COMPANY
30/12/2025 10:38
Ban Quản lý dự án khu vực 06 publishes the plan Approve adjustments to sections 12 and 13 of the appendix issued with Decision 12/QD-BQLDAKV06 dated August 4, 2025 of the Director of Regional Project Management Board 06 and approve the contractor selection plan for (next) bidding packages under the Lien Cang Road Construction Project, Nhon Trach district (phase 1) with 4 bidding package .
25/12/2025 11:00
Ban Quản lý dự án khu vực 06 announced the results of the bid package Bidding package number 01: Construction .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN THIẾT KẾ XÂY DỰNG ĐÌNH BÁCH
22/12/2025 09:01
Ban Quản lý dự án khu vực 06 announced the results of the bid package Package 18 (Consulting): Specialized experiment .
- Winning bidder: SIEU VIET VERIFY AND MATERIALS JOINT STOCK COMPANY
03/12/2025 08:38
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án khu vực 06 has posted 97 of the contractor selection plan, which contains 465 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án khu vực 06 has posted 292 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 292 package, canceled the bid 0 package (among the bidding packages above).
- There are 291 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án khu vực 06 has a relationship with 115 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban Quản lý dự án khu vực 06 has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects