Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án khu vực Khu kinh tế Nghệ An as follows:
- Has relationships with 29 contractor.
- Announced 7 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 23 contractor selection plans with a total of 93 bidding packages, of which 13 prequalification documents have not found the investment project.
- Has invited bids for 22 packages (with 22 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 32 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 13 packages with results that do not have tender notice or prequalification notice.
- There are 65 packages that have not fully posted the contractor selection results. Of these 63 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.45 contractors.
- Breakdown by bidding field: Goods 0%, Construction 36.36%, Consultancy 54.55%, Non-consultancy 9.09%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 157,096,040,000 VND, of which the total winning bid value is: 129,785,083,999 VND.
- The savings rate is: 17.38%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án khu vực Khu kinh tế Nghệ An as follows:
- Has relationships with 29 contractor.
- The average number of contractors participating in each bidding package is: 1.45 contractors.
- Proportion of bidding fields: Goods 0%, Construction 36.36%, Consulting 54.55%, Non-consulting 9.09%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 157,096,040,000 VND, in which the total winning value is: 129,785,083,999 VND.
- The savings rate is: 17.38%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 7 investment and development projects.
- As the owner of 23 Contractor selection plan in which 23 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 22 bidding packages in which 22 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted Tender Notice Consulting on surveying and planning construction subdivision plans at a scale of 1/2,000 in Dong Hoi Industrial Park, in Quynh Loc commune and Quynh Lap commune, Hoang Mai town. of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An with the form Open bidding.
28/10/2024 15:41
The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted the request Overall adjustment of construction zoning planning at 1/2,000 scale of Nghia Dan Industrial Park in Nghia Hoi commune, Nghia Dan district of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An with 4 bidding package.
21/10/2024 08:56
The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted the request Survey and prepare a 1/2,000 scale construction zoning plan for Dong Hoi Industrial Park, in Quynh Loc commune and Quynh Lap commune, Hoang Mai town of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An with 3 bidding package.
10/10/2024 15:27
The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted the request Installer of automatic wastewater monitoring system at Wastewater Treatment Station Area B - Nam Cam Industrial Park of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An with 3 bidding package.
12/09/2024 10:43
Ban Quản lý dự án khu vực Khu kinh tế Nghệ An Posted Development Investment Project Installer of automatic wastewater monitoring system at Wastewater Treatment Station Area B - Nam Cam Industrial Park.
12/09/2024 10:10
The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted the request Survey and prepare zoning plans for construction of Bai Lu 2 urban and tourist area in Nghi Yen commune and Nghi Tien commune, Nghi Loc district in Southeast Nghe An economic zone of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An with 4 bidding package.
23/08/2024 13:58
The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted the request Contractor selection plan for project investment preparation phase: Lighting system TL.536 section National Highway 1-N5 of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An with 3 bidding package.
22/07/2024 17:15
The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted the results of the bidding package Package No. 09: The entire construction and installation part of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An.
- Winning bidder: THANH PHAT CONSTRUCTION COMPANY LIMITED
19/07/2024 17:11
The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted the results of the bidding package The entire construction and installation part of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An.
- Winning bidder: CÔNG TY TNHH MINH QUANG
19/07/2024 16:49
The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted the results of the bidding package Consulting on surveys and planning plans for 1/2000 scale construction zones in Zone D - Nam Cam Industrial Park, belonging to Southeast Nghe An Economic Zone of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An.
- Winning bidder: DELTA VIET CONSULTANCY JOINT STOCK COMPANY
03/06/2024 15:54
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án khu vực Khu kinh tế Nghệ An publishes Tender Notice Consulting on surveying and planning construction subdivision plans at a scale of 1/2,000 in Dong Hoi Industrial Park, in Quynh Loc commune and Quynh Lap commune, Hoang Mai town. in the form Open bidding .
28/10/2024 15:41
Ban Quản lý dự án khu vực Khu kinh tế Nghệ An publishes the plan Overall adjustment of construction zoning planning at 1/2,000 scale of Nghia Dan Industrial Park in Nghia Hoi commune, Nghia Dan district with 4 bidding package .
21/10/2024 08:56
Ban Quản lý dự án khu vực Khu kinh tế Nghệ An publishes the plan Survey and prepare a 1/2,000 scale construction zoning plan for Dong Hoi Industrial Park, in Quynh Loc commune and Quynh Lap commune, Hoang Mai town with 3 bidding package .
10/10/2024 15:27
Ban Quản lý dự án khu vực Khu kinh tế Nghệ An publishes the plan Installer of automatic wastewater monitoring system at Wastewater Treatment Station Area B - Nam Cam Industrial Park with 3 bidding package .
12/09/2024 10:43
Ban Quản lý dự án khu vực Khu kinh tế Nghệ An publishes the plan Survey and prepare zoning plans for construction of Bai Lu 2 urban and tourist area in Nghi Yen commune and Nghi Tien commune, Nghi Loc district in Southeast Nghe An economic zone with 4 bidding package .
23/08/2024 13:58
Ban Quản lý dự án khu vực Khu kinh tế Nghệ An publishes the plan Contractor selection plan for project investment preparation phase: Lighting system TL.536 section National Highway 1-N5 with 3 bidding package .
22/07/2024 17:15
Ban Quản lý dự án khu vực Khu kinh tế Nghệ An announced the results of the bid package Package No. 09: The entire construction and installation part .
- Winning bidder: THANH PHAT CONSTRUCTION COMPANY LIMITED
19/07/2024 17:11
Ban Quản lý dự án khu vực Khu kinh tế Nghệ An announced the results of the bid package The entire construction and installation part .
- Winning bidder: CÔNG TY TNHH MINH QUANG
19/07/2024 16:49
Ban Quản lý dự án khu vực Khu kinh tế Nghệ An announced the results of the bidding package The entire construction and installation part with 1 participating contractors .
18/06/2024 09:34
Ban Quản lý dự án khu vực Khu kinh tế Nghệ An announced the results of the bidding package Tender package No 09: The entire construction and installation part with 2 participating contractors .
10/06/2024 09:32
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted Tender Notice Consulting on surveying and planning construction subdivision plans at a scale of 1/2,000 in Dong Hoi Industrial Park, in Quynh Loc commune and Quynh Lap commune, Hoang Mai town. of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An with the form Open bidding.
28/10/2024 15:41
The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted the request Overall adjustment of construction zoning planning at 1/2,000 scale of Nghia Dan Industrial Park in Nghia Hoi commune, Nghia Dan district of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An with 4 bidding package.
21/10/2024 08:56
The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted the request Survey and prepare a 1/2,000 scale construction zoning plan for Dong Hoi Industrial Park, in Quynh Loc commune and Quynh Lap commune, Hoang Mai town of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An with 3 bidding package.
10/10/2024 15:27
The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted the request Installer of automatic wastewater monitoring system at Wastewater Treatment Station Area B - Nam Cam Industrial Park of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An with 3 bidding package.
12/09/2024 10:43
Ban Quản lý dự án khu vực Khu kinh tế Nghệ An Posted Development Investment Project Installer of automatic wastewater monitoring system at Wastewater Treatment Station Area B - Nam Cam Industrial Park.
12/09/2024 10:10
The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted the request Survey and prepare zoning plans for construction of Bai Lu 2 urban and tourist area in Nghi Yen commune and Nghi Tien commune, Nghi Loc district in Southeast Nghe An economic zone of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An with 4 bidding package.
23/08/2024 13:58
The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted the request Contractor selection plan for project investment preparation phase: Lighting system TL.536 section National Highway 1-N5 of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An with 3 bidding package.
22/07/2024 17:15
The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted the results of the bidding package Package No. 09: The entire construction and installation part of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An.
- Winning bidder: THANH PHAT CONSTRUCTION COMPANY LIMITED
19/07/2024 17:11
The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted the results of the bidding package The entire construction and installation part of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An.
- Winning bidder: CÔNG TY TNHH MINH QUANG
19/07/2024 16:49
The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted the results of the bidding package Consulting on surveys and planning plans for 1/2000 scale construction zones in Zone D - Nam Cam Industrial Park, belonging to Southeast Nghe An Economic Zone of the investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An.
- Winning bidder: DELTA VIET CONSULTANCY JOINT STOCK COMPANY
03/06/2024 15:54
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted 23 of the contractor selection plan, which contains 93 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted 22 Tender Notice in the 22 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has posted 32 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 32 package, canceled the bid 0 package (among the bidding packages above).
- There are 13 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has a relationship with 29 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An is the investor of 22 package, of which 22 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An is the owner of 23 contractor selection plan. In which, they self-invite 23 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An is an investor with 29 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án khu vực Khu kinh tế Nghệ An is the investor of 7 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code