Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án khu vực Năm Căn as follows:
- Has relationships with 1 project owners.
- Has relationships with 17 contractor.
- Announced 4 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 4 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 4 packages that have not fully posted the contractor selection results. Of these 4 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án khu vực Năm Căn as follows:
- Has relationships with 17 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban Quản lý dự án khu vực Năm Căn are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 8 contractor selection plans, of which 1 were self-published, and 7 were published by other entities.
- Is the investor of 7 Tender Notices, of which 0 were self-invited, and 7 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 0 bidding packages.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Ban Quản lý dự án khu vực Năm Căn announced the results of the bid package Package No. 11: Construction supervision of construction and installation package No. 12 .
- Winning bidder: CÔNG TY TNHH TMDV XÂY DỰNG TAM GIANG
31/12/2025 13:41
Ban Quản lý dự án khu vực Năm Căn publishes the plan Vo Thi Sau Primary School. with 6 bidding package .
31/12/2025 13:35
Investor Ban Quản lý dự án khu vực Năm Căn has posted an investment and development project Vo Thi Sau Primary School..
30/12/2025 17:17
Ban Quản lý dự án khu vực Năm Căn announced the results of the bid package Bidding package number 21: Construction insurance for bidding packages numbered: 14, 15, 16, 17, 18. .
- Winning bidder: PVI Insurance
29/12/2025 08:20
Ban Quản lý dự án khu vực Năm Căn announced the results of the bid package Package No. 16: Construction of Cai Trang bridge. .
- Winning bidder: SOUTH EAST ASEAN CONSTRUCTION AND TRADING CORPORATION
22/12/2025 16:43
Ban Quản lý dự án khu vực Năm Căn announced the results of the bid package Package number 12: Construction supervision of package numbers: 14, 15, 16, 17, 18. .
- Winning bidder: CÔNG TY TNHH NHẬT PHÁT CÀ MAU
22/12/2025 15:45
Ban Quản lý dự án khu vực Năm Căn announced the results of the bid package Package No. 19: Ensuring water traffic for construction and installation packages No. 14, 15, 16, 17, 18. .
16/12/2025 17:42
Ban Quản lý dự án khu vực Năm Căn announced the results of the bid package Package No. 20: Ensuring road traffic for construction and installation packages No. 14, 15, 16, 17, 18. .
- Winning bidder: CÔNG TY TNHH VÕ HUỲNH CM
16/12/2025 17:42
Ban Quản lý dự án khu vực Năm Căn announced the results of the bid package Package No. 14: Construction of Xeo Lon bridge. .
11/12/2025 09:53
Ban Quản lý dự án khu vực Năm Căn announced the results of the bid package Package No. 15: Construction of Ong Do bridge. .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ - XÂY DỰNG NAM VIỆT
11/12/2025 09:52
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án khu vực Năm Căn publishes the plan Project upgrading and expanding car roads to the center of Tam Giang commune, Tam Giang Dong, Nam Can district with 4 bidding package .
17/09/2025 16:06
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án khu vực Năm Căn announced the results of the bid package Package No. 11: Construction supervision of construction and installation package No. 12 .
- Winning bidder: CÔNG TY TNHH TMDV XÂY DỰNG TAM GIANG
31/12/2025 13:41
Ban Quản lý dự án khu vực Năm Căn publishes the plan Vo Thi Sau Primary School. with 6 bidding package .
31/12/2025 13:35
Investor Ban Quản lý dự án khu vực Năm Căn has posted an investment and development project Vo Thi Sau Primary School..
30/12/2025 17:17
Ban Quản lý dự án khu vực Năm Căn announced the results of the bid package Bidding package number 21: Construction insurance for bidding packages numbered: 14, 15, 16, 17, 18. .
- Winning bidder: PVI Insurance
29/12/2025 08:20
Ban Quản lý dự án khu vực Năm Căn announced the results of the bid package Package No. 16: Construction of Cai Trang bridge. .
- Winning bidder: SOUTH EAST ASEAN CONSTRUCTION AND TRADING CORPORATION
22/12/2025 16:43
Ban Quản lý dự án khu vực Năm Căn announced the results of the bid package Package number 12: Construction supervision of package numbers: 14, 15, 16, 17, 18. .
- Winning bidder: CÔNG TY TNHH NHẬT PHÁT CÀ MAU
22/12/2025 15:45
Ban Quản lý dự án khu vực Năm Căn announced the results of the bid package Package No. 19: Ensuring water traffic for construction and installation packages No. 14, 15, 16, 17, 18. .
16/12/2025 17:42
Ban Quản lý dự án khu vực Năm Căn announced the results of the bid package Package No. 20: Ensuring road traffic for construction and installation packages No. 14, 15, 16, 17, 18. .
- Winning bidder: CÔNG TY TNHH VÕ HUỲNH CM
16/12/2025 17:42
Ban Quản lý dự án khu vực Năm Căn announced the results of the bid package Package No. 14: Construction of Xeo Lon bridge. .
11/12/2025 09:53
Ban Quản lý dự án khu vực Năm Căn announced the results of the bid package Package No. 15: Construction of Ong Do bridge. .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ - XÂY DỰNG NAM VIỆT
11/12/2025 09:52
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án khu vực Năm Căn has posted 1 of the contractor selection plan, which contains 4 of the bidding package. See full list here
Summary: The Bid solicitor Ban Quản lý dự án khu vực Năm Căn has a relationship with 17 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án khu vực Năm Căn has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban Quản lý dự án khu vực Năm Căn has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects