Data analysis results of DauThau.info software for bid solicitors BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH as follows:
- Has relationships with 8 project owners.
- Has relationships with 238 contractor.
- Announced 114 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 1361 contractor selection plans with a total of 3730 bidding packages, of which 780 prequalification documents have not found the investment project.
- Has invited bids for 253 packages (with 255 tender notices), and conducted prequalification for 0 packages.
- There are 3 bidding packages with content that needs clarification.
- Announced the results of 2585 package, and canceled bids for 1 packages (among the packages mentioned above).
- There are 2341 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1203 packages that have not fully posted the contractor selection results. Of these 1202 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.33 contractors.
- Breakdown by bidding field: Goods 10.98%, Construction 87.06%, Consultancy 1.96%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,266,881,290,246 VND, of which the total winning bid value is: 1,219,448,349,025 VND.
- The savings rate is: 3.74%.
Data analysis results of DauThau.info software for bid solicitors BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH as follows:
- Has relationships with 238 contractor.
- The average number of contractors participating in each bidding package is: 2.33 contractors.
- Proportion of bidding fields: Goods 10.98%, Construction 87.06%, Consulting 1.96%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,266,881,290,246 VND, in which the total winning value is: 1,219,448,349,025 VND.
- The savings rate is: 3.74%.
This Bid solicitor is also an investor. The analysis results of data for the investor BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH are as follows:
- Is the investor of 114 development investment projects.
- Is the investor of 705 contractor selection plans, of which 700 were self-published, and 5 were published by other entities.
- Is the investor of 163 Tender Notices, of which 117 were self-invited, and 46 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Package 03: Verification of construction drawing design and cost estimate .
- Winning bidder: CÔNG TY TNHH VÕ HUỲNH CM
30/12/2025 10:28
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Package No. 04: Make construction drawing designs - Estimates .
- Winning bidder: HOANG MINH TRADING CONSTRUCTION CONSULTANT INVESTMENT CORPORATION
03/12/2025 11:00
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Package No. 05: Geological survey and topographic survey step to create construction drawing design .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG THANH QUẢNG
03/12/2025 10:57
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH publishes the plan Investment project to build, upgrade and expand motorway to the center of Tri Luc commune, Thoi Binh district with 15 bidding package .
18/11/2025 09:38
Investor BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH has posted an investment and development project Investment project to build, upgrade and expand motorway to the center of Tri Luc commune, Thoi Binh district.
18/11/2025 08:08
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Package 09: Construction and installation works .
- Winning bidder: SAO NAM. CO
27/10/2025 10:31
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Package No. 03: Supervision of construction and installation of works .
- Winning bidder: HOANG MINH TRADING CONSTRUCTION CONSULTANT INVESTMENT CORPORATION
09/10/2025 13:53
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Package No. 03: Verification of Feasibility Study Report .
- Winning bidder: CÔNG TY TNHH VÕ HUỲNH CM
15/09/2025 08:25
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH publishes Tender Notice Package 09: Construction and installation works in the form Open bidding .
08/08/2025 07:00
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH publishes the plan Investment project to build bridges (Mr. Vinh Bridge, White Buffalo Bridge, C4 Bridge) on the automotive route to the center of Tan Loc Dong commune, Thoi Binh district with 14 bidding package .
06/08/2025 14:18
The data sheet has been partially hidden, to see the full information please Login or Register
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH publishes the plan Investment project to build bridges (Mr. Vinh Bridge, White Buffalo Bridge, C4 Bridge) on the automotive route to the center of Tan Loc Dong commune, Thoi Binh district with 12 bidding package .
24/07/2025 09:05
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Supervision of construction works .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG HÒA THÀNH CÀ MAU
18/06/2025 13:45
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Civil Works .
- Winning bidder: Công ty TNHH Hữu Lâm Cà Mau
18/06/2025 13:43
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Supervision of construction works .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG HÒA THÀNH CÀ MAU
30/05/2025 08:34
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Supervision of construction works .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG HÒA THÀNH CÀ MAU
30/05/2025 08:31
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Supervision of construction works .
- Winning bidder: HOANG MINH TRADING CONSTRUCTION CONSULTANT INVESTMENT CORPORATION
30/05/2025 08:28
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Package No. 05: Relocation of domestic water supply pipes .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG CAO GIA TIẾN
14/05/2025 09:22
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Evaluation of bidding documents and results of selection of construction contractors .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ – XÂY DỰNG LẠC HỒNG
26/04/2025 08:18
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Evaluation of bidding documents and results of selection of construction contractors .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ – XÂY DỰNG LẠC HỒNG
26/04/2025 08:14
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Evaluation of bidding documents and results of selection of construction contractors .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ – XÂY DỰNG LẠC HỒNG
26/04/2025 08:11
The data sheet has been partially hidden, to see the full information please Login or Register
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Package 03: Verification of construction drawing design and cost estimate .
- Winning bidder: CÔNG TY TNHH VÕ HUỲNH CM
30/12/2025 10:28
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Package No. 04: Make construction drawing designs - Estimates .
- Winning bidder: HOANG MINH TRADING CONSTRUCTION CONSULTANT INVESTMENT CORPORATION
03/12/2025 11:00
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Package No. 05: Geological survey and topographic survey step to create construction drawing design .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG THANH QUẢNG
03/12/2025 10:57
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH publishes the plan Investment project to build, upgrade and expand motorway to the center of Tri Luc commune, Thoi Binh district with 15 bidding package .
18/11/2025 09:38
Investor BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH has posted an investment and development project Investment project to build, upgrade and expand motorway to the center of Tri Luc commune, Thoi Binh district.
18/11/2025 08:08
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Package 09: Construction and installation works .
- Winning bidder: SAO NAM. CO
27/10/2025 10:31
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Package No. 03: Supervision of construction and installation of works .
- Winning bidder: HOANG MINH TRADING CONSTRUCTION CONSULTANT INVESTMENT CORPORATION
09/10/2025 13:53
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH announced the results of the bid package Package No. 03: Verification of Feasibility Study Report .
- Winning bidder: CÔNG TY TNHH VÕ HUỲNH CM
15/09/2025 08:25
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH publishes Tender Notice Package 09: Construction and installation works in the form Open bidding .
08/08/2025 07:00
BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH publishes the plan Investment project to build bridges (Mr. Vinh Bridge, White Buffalo Bridge, C4 Bridge) on the automotive route to the center of Tan Loc Dong commune, Thoi Binh district with 14 bidding package .
06/08/2025 14:18
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH has posted 1361 of the contractor selection plan, which contains 3730 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH has posted 255 Tender Notices in 253 bidding packages. Among these, 115 Tender Notices were self-invited, and 140 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH has posted 2585 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 2585 package, canceled the bid 1 package (among the bidding packages above).
- There are 2341 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH has a relationship with 238 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH has a relationship with 67 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity BAN QUẢN LÝ DỰ ÁN KHU VỰC THỚI BÌNH has a relationship with 10 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects