Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án nghành xây dựng as follows:
- Has relationships with 15 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 11 contractor selection plans with a total of 28 bidding packages, of which 11 prequalification documents have not found the investment project.
- Has invited bids for 25 packages (with 25 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 21 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 28 packages that have not fully posted the contractor selection results. Of these 28 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 88.00%, Consultancy 12.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 80,206,659,689 VND, of which the total winning bid value is: 79,987,884,541 VND.
- The savings rate is: 0.27%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án nghành xây dựng as follows:
- Has relationships with 15 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 88.00%, Consulting 12.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 80,206,659,689 VND, in which the total winning value is: 79,987,884,541 VND.
- The savings rate is: 0.27%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 2 Contractor selection plan in which 2 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 0 bidding packages in which 0 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor Ban quản lý dự án nghành xây dựng has posted Tender Notice Renovating, repairing and installing equipment at the office of the Public Administration Center of Binh Phuoc province. Symbol: XL of the investor Ban quản lý dự án nghành xây dựng with the form Open bidding (Only select domestic contractors).
10/04/2017 14:38
The Bid solicitor Ban quản lý dự án nghành xây dựng has posted the request Office of the Public Administration Center of Binh Phuoc Province of the investor Ban quản lý dự án nghành xây dựng with 1 bidding package.
05/04/2017 14:20
The Bid solicitor Ban quản lý dự án nghành xây dựng has posted the results of the bidding package To maintain and repair Truong Chinh street (section from Tran Hung Dao street to the foot of the bridge over the spillway of Suoi Cam lake). Symbol: XL01 of the investor Ban quản lý dự án nghành xây dựng.
03/03/2017 09:04
The Bid solicitor Ban quản lý dự án nghành xây dựng has posted the results of the bidding package Upgrading Phan Boi Chau Street. Symbol: XL01 of the investor Ban quản lý dự án nghành xây dựng.
03/03/2017 09:02
The Bid solicitor Ban quản lý dự án nghành xây dựng has posted the results of the bidding package Upgrading Ly Thuong Kiet Street (section from Le Duan Street to Phu Rieng Do Street). Symbol: XL01 of the investor Ban quản lý dự án nghành xây dựng.
03/03/2017 09:00
The Bid solicitor Ban quản lý dự án nghành xây dựng has posted the results of the bidding package Construction package 01: construction of road and storm water drainage system on Nguyen Binh Khiem street, road 14A, road number 7 (N2), a section of Ham Nghi road and road number 7 (N1) from Km0+340 to the end of the route of the investor Ban quản lý dự án nghành xây dựng.
03/03/2017 08:58
The Bid solicitor Ban quản lý dự án nghành xây dựng has posted the request To maintain and repair Truong Chinh road (the section from Tran Hung Dao street to the foot of the bridge over the spillway of Suoi Cam lake); of the investor Ban quản lý dự án nghành xây dựng with 1 bidding package.
16/02/2017 10:01
The Bid solicitor Ban quản lý dự án nghành xây dựng has posted the request Upgrading Phan Boi Chau Street of the investor Ban quản lý dự án nghành xây dựng with 1 bidding package.
16/02/2017 09:57
The Bid solicitor Ban quản lý dự án nghành xây dựng has posted the request Upgrading Ly Thuong Kiet Street (section from Le Duan Street to Phu Rieng Do Street) of the investor Ban quản lý dự án nghành xây dựng with 1 bidding package.
16/02/2017 09:52
Bid solicitor Ban quản lý dự án nghành xây dựng has posted Tender Notice To maintain and repair Truong Chinh street (section from Tran Hung Dao street to the foot of the bridge over the spillway of Suoi Cam lake). Symbol: XL01 of the investor Ban quản lý dự án nghành xây dựng with the form National Competitive Bidding.
08/02/2017 09:48
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án nghành xây dựng publishes Tender Notice Renovating, repairing and installing equipment at the office of the Public Administration Center of Binh Phuoc province. Symbol: XL in the form Open bidding (Only select domestic contractors) .
10/04/2017 14:38
Ban quản lý dự án nghành xây dựng publishes the plan Office of the Public Administration Center of Binh Phuoc Province with 1 bidding package .
05/04/2017 14:20
Ban quản lý dự án nghành xây dựng announced the results of the bid package To maintain and repair Truong Chinh street (section from Tran Hung Dao street to the foot of the bridge over the spillway of Suoi Cam lake). Symbol: XL01 .
- Winning bidder: Công ty TNHH Đầu tư Xây dựng Hoàng An
03/03/2017 09:04
Ban quản lý dự án nghành xây dựng announced the results of the bid package Upgrading Phan Boi Chau Street. Symbol: XL01 .
- Winning bidder: Công ty TNHH Sáu Phát
03/03/2017 09:02
Ban quản lý dự án nghành xây dựng announced the results of the bid package Upgrading Ly Thuong Kiet Street (section from Le Duan Street to Phu Rieng Do Street). Symbol: XL01 .
- Winning bidder: Công ty Cổ phần đầu tư xây lắp Miền Nam
03/03/2017 09:00
Ban quản lý dự án nghành xây dựng announced the results of the bid package Construction package 01: construction of road and storm water drainage system on Nguyen Binh Khiem street, road 14A, road number 7 (N2), a section of Ham Nghi road and road number 7 (N1) from Km0+340 to the end of the route .
- Winning bidder: Công ty TNHH Xây dựng Hữu Nhu
03/03/2017 08:58
Ban quản lý dự án nghành xây dựng publishes the plan To maintain and repair Truong Chinh road (the section from Tran Hung Dao street to the foot of the bridge over the spillway of Suoi Cam lake); with 1 bidding package .
16/02/2017 10:01
Ban quản lý dự án nghành xây dựng publishes the plan Upgrading Phan Boi Chau Street with 1 bidding package .
16/02/2017 09:57
Ban quản lý dự án nghành xây dựng publishes the plan Upgrading Ly Thuong Kiet Street (section from Le Duan Street to Phu Rieng Do Street) with 1 bidding package .
16/02/2017 09:52
Ban quản lý dự án nghành xây dựng publishes Tender Notice To maintain and repair Truong Chinh street (section from Tran Hung Dao street to the foot of the bridge over the spillway of Suoi Cam lake). Symbol: XL01 in the form National Competitive Bidding .
08/02/2017 09:48
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Ban quản lý dự án nghành xây dựng has posted Tender Notice Renovating, repairing and installing equipment at the office of the Public Administration Center of Binh Phuoc province. Symbol: XL of the investor Ban quản lý dự án nghành xây dựng with the form Open bidding (Only select domestic contractors).
10/04/2017 14:38
The Bid solicitor Ban quản lý dự án nghành xây dựng has posted the request Office of the Public Administration Center of Binh Phuoc Province of the investor Ban quản lý dự án nghành xây dựng with 1 bidding package.
05/04/2017 14:20
The Bid solicitor Ban quản lý dự án nghành xây dựng has posted the results of the bidding package To maintain and repair Truong Chinh street (section from Tran Hung Dao street to the foot of the bridge over the spillway of Suoi Cam lake). Symbol: XL01 of the investor Ban quản lý dự án nghành xây dựng.
03/03/2017 09:04
The Bid solicitor Ban quản lý dự án nghành xây dựng has posted the results of the bidding package Upgrading Phan Boi Chau Street. Symbol: XL01 of the investor Ban quản lý dự án nghành xây dựng.
03/03/2017 09:02
The Bid solicitor Ban quản lý dự án nghành xây dựng has posted the results of the bidding package Upgrading Ly Thuong Kiet Street (section from Le Duan Street to Phu Rieng Do Street). Symbol: XL01 of the investor Ban quản lý dự án nghành xây dựng.
03/03/2017 09:00
The Bid solicitor Ban quản lý dự án nghành xây dựng has posted the results of the bidding package Construction package 01: construction of road and storm water drainage system on Nguyen Binh Khiem street, road 14A, road number 7 (N2), a section of Ham Nghi road and road number 7 (N1) from Km0+340 to the end of the route of the investor Ban quản lý dự án nghành xây dựng.
03/03/2017 08:58
The Bid solicitor Ban quản lý dự án nghành xây dựng has posted the request To maintain and repair Truong Chinh road (the section from Tran Hung Dao street to the foot of the bridge over the spillway of Suoi Cam lake); of the investor Ban quản lý dự án nghành xây dựng with 1 bidding package.
16/02/2017 10:01
The Bid solicitor Ban quản lý dự án nghành xây dựng has posted the request Upgrading Phan Boi Chau Street of the investor Ban quản lý dự án nghành xây dựng with 1 bidding package.
16/02/2017 09:57
The Bid solicitor Ban quản lý dự án nghành xây dựng has posted the request Upgrading Ly Thuong Kiet Street (section from Le Duan Street to Phu Rieng Do Street) of the investor Ban quản lý dự án nghành xây dựng with 1 bidding package.
16/02/2017 09:52
Bid solicitor Ban quản lý dự án nghành xây dựng has posted Tender Notice To maintain and repair Truong Chinh street (section from Tran Hung Dao street to the foot of the bridge over the spillway of Suoi Cam lake). Symbol: XL01 of the investor Ban quản lý dự án nghành xây dựng with the form National Competitive Bidding.
08/02/2017 09:48
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án nghành xây dựng has posted 11 of the contractor selection plan, which contains 28 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án nghành xây dựng has posted 25 Tender Notice in the 25 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án nghành xây dựng has posted 21 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 21 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý dự án nghành xây dựng has a relationship with 15 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án nghành xây dựng has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án nghành xây dựng is the owner of 2 contractor selection plan. In which, they self-invite 2 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban quản lý dự án nghành xây dựng is an investor with 15 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code