Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long as follows:
- Has relationships with 1 project owners.
- Has relationships with 53 contractor.
- Announced 31 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 18 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 15 packages that have not fully posted the contractor selection results. Of these 15 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long as follows:
- Has relationships with 53 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long are as follows:
- Is the investor of 31 development investment projects.
- Is the investor of 49 contractor selection plans, of which 3 were self-published, and 46 were published by other entities.
- Is the investor of 44 Tender Notices, of which 0 were self-invited, and 44 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 14 bidding packages, of which 14 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Vĩnh Long (14)
- Provinces before the merger where the contractor has participated in bidding : Trà Vinh (12), Undefined (2)
- Has relationships with 1 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 33 bidding packages with 5 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Civil Works .
31/12/2025 16:16
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Construction work and equipment installation .
31/12/2025 16:16
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Surveying, designing construction and cost estimates .
- Winning bidder: BENTRE CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
31/12/2025 16:15
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Package No. 22: Construction of tree planting for Quoi An market embankment, Tan An Luong market embankment, Cai Nhum town embankment, Tra On town embankment, Ba Pho market embankment and Tam Binh town embankment, dike section connecting the dike line from Mang Thit ferry - National Highway 53 (south bank), dike section connecting the dike route from Mang Thit ferry - National Highway 53 (north bank) .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ THƯƠNG MẠI MINH THÔNG
27/12/2025 15:02
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Package No. 2: Construction and installation of dredging items combined with dykes surrounding the Cai Son Regional Canal; Dredging combined with dykes for level II canals: Rach Rung, Xeo Cao; 03 open culverts: Rach Rung, Xeo Cao 1, Xeo Cao 2 and ensure water traffic safety for construction works .
- Winning bidder: HOAN MY CONSTRUCT COMPANY LIMITED
23/12/2025 14:52
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Package No. 2: Construction and installation of items: Upgrading dikes combined with rural roads (starting from Mai Dam open sewer to Kenh Dao bridge); Ensuring water traffic safety for construction works .
- Winning bidder: hoang giang technical Joint Stock Company
23/12/2025 14:52
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long publishes the plan Contractor selection plan (construction phase) of the Freshwater Reservoir Infrastructure project along the banks of Lang The River to ensure water source security in Cang Long, Chau Thanh districts and Tra Vinh city (Completing phase 1 of embankments and sidewalks) with 1 bidding package .
22/12/2025 14:51
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Package No. 11: Consulting on supervision of bomb and mine clearance .
- Winning bidder: LỮ ĐOÀN 299/QUÂN ĐOÀN 12
21/12/2025 10:26
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Package 12: Construction of mines and mines and explosives .
- Winning bidder: 319 BOM, MINS, UXO ONE MEMBER COMPANY LIMITED
21/12/2025 10:16
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Package No. 09: Risk insurance in construction .
- Winning bidder: PVI Insurance
21/12/2025 09:35
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long publishes the plan The plan to select contractors of the road project combined with floods and saline intrusion in Tan Thanh Binh - Thanh Ngai - Phu My and Mo Cay Bac districts (phase 2) with 6 bidding package .
03/10/2025 11:52
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long publishes the plan Project contractor selection plan: Upgrading the dike dike line in combination with roads of An Dien commune, Thanh Phu district with 7 bidding package .
03/10/2025 11:34
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long publishes the plan The plan for contractor selection phase preparation of feasibility study reports for reinforcing landslide for land erosion of Ham Luong river bank in Ben Tre city in Ben Tre province with 5 bidding package .
08/09/2025 08:57
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Civil Works .
31/12/2025 16:16
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Construction work and equipment installation .
31/12/2025 16:16
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Surveying, designing construction and cost estimates .
- Winning bidder: BENTRE CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
31/12/2025 16:15
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Package No. 22: Construction of tree planting for Quoi An market embankment, Tan An Luong market embankment, Cai Nhum town embankment, Tra On town embankment, Ba Pho market embankment and Tam Binh town embankment, dike section connecting the dike line from Mang Thit ferry - National Highway 53 (south bank), dike section connecting the dike route from Mang Thit ferry - National Highway 53 (north bank) .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ THƯƠNG MẠI MINH THÔNG
27/12/2025 15:02
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Package No. 2: Construction and installation of dredging items combined with dykes surrounding the Cai Son Regional Canal; Dredging combined with dykes for level II canals: Rach Rung, Xeo Cao; 03 open culverts: Rach Rung, Xeo Cao 1, Xeo Cao 2 and ensure water traffic safety for construction works .
- Winning bidder: HOAN MY CONSTRUCT COMPANY LIMITED
23/12/2025 14:52
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Package No. 2: Construction and installation of items: Upgrading dikes combined with rural roads (starting from Mai Dam open sewer to Kenh Dao bridge); Ensuring water traffic safety for construction works .
- Winning bidder: hoang giang technical Joint Stock Company
23/12/2025 14:52
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long publishes the plan Contractor selection plan (construction phase) of the Freshwater Reservoir Infrastructure project along the banks of Lang The River to ensure water source security in Cang Long, Chau Thanh districts and Tra Vinh city (Completing phase 1 of embankments and sidewalks) with 1 bidding package .
22/12/2025 14:51
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Package No. 11: Consulting on supervision of bomb and mine clearance .
- Winning bidder: LỮ ĐOÀN 299/QUÂN ĐOÀN 12
21/12/2025 10:26
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Package 12: Construction of mines and mines and explosives .
- Winning bidder: 319 BOM, MINS, UXO ONE MEMBER COMPANY LIMITED
21/12/2025 10:16
Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long announced the results of the bid package Package No. 09: Risk insurance in construction .
- Winning bidder: PVI Insurance
21/12/2025 09:35
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long has posted 3 of the contractor selection plan, which contains 18 of the bidding package. See full list here
Summary: The Bid solicitor Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long has a relationship with 53 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long has a relationship with 35 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban Quản lý dự án nông nghiệp tỉnh Vĩnh Long has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects