Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên as follows:
- Has relationships with 48 contractor.
- Announced 4 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 11 contractor selection plans with a total of 43 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 21 packages (with 28 tender notices), and conducted prequalification for 6 packages.
- Announced the results of 26 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 19 packages that have not fully posted the contractor selection results. Of these 19 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.45 contractors.
- Breakdown by bidding field: Goods 10.71%, Construction 75.00%, Consultancy 14.29%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,536,215,097,518 VND, of which the total winning bid value is: 1,464,840,854,980 VND.
- The savings rate is: 4.65%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên as follows:
- Has relationships with 48 contractor.
- The average number of contractors participating in each bidding package is: 2.45 contractors.
- Proportion of bidding fields: Goods 10.71%, Construction 75.00%, Consulting 14.29%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,536,215,097,518 VND, in which the total winning value is: 1,464,840,854,980 VND.
- The savings rate is: 4.65%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 4 investment and development projects.
- As the owner of 3 Contractor selection plan in which 3 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 5 bidding packages in which 5 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted Tender Notice Package TN-CS-13: Consultancy on quality inspection of construction items of Huong Thuong bridge, Mo Linh 1 bridge, Mo Linh 2 bridge of the investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên with the form Open bidding.
04/08/2023 16:40
Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên Posted Development Investment Project Integrated development of dynamic urban - Thai Nguyen city.
04/08/2023 15:15
The Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted the results of the bidding package Package 03: Moving the power line within the site clearance for construction of the following works: Building North-South road and Huong Thuong bridge and Renovating the drainage system of Mo Bach canal of the investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên.
09/06/2023 10:49
Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted Tender Notice Package 03: Moving the power line within the site clearance for construction of the following works: Building North-South road and Huong Thuong bridge and Renovating the drainage system of Mo Bach canal of the investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên with the form Open bidding.
12/04/2023 16:43
Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên Posted Development Investment Project Moving power lines within the scope of site clearance for construction of construction works: Building North-South road and Huong Thuong bridge and Renovating the drainage system of Mo Bach canal under the Urban General Development project Motivation - Thai Nguyen City.
08/04/2023 16:16
The Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted the results of the bidding package Technical support for asset management of the investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên.
07/01/2022 17:10
The Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted the results of the bidding package Technical assistance to develop integrated urban development strategy of the investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên.
07/01/2022 17:05
The Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted the results of the bidding package Building North-South road and lighting electricity for North-South road, Huong Thuong bridge of the investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên.
27/12/2021 17:43
The Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted the results of the bidding package Renovating the drainage system of the Cactus ditch of the investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên.
17/12/2021 17:46
The Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted the results of the bidding package Upgrading Le Huu Trac Street of the investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên.
16/12/2021 15:07
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên announced the results of the bidding package Package TN-CS-13: Consultancy on quality inspection of construction items of Huong Thuong bridge, Mo Linh 1 bridge, Mo Linh 2 bridge with 1 participating contractors .
14/08/2023 17:06
Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên publishes Tender Notice Package TN-CS-13: Consultancy on quality inspection of construction items of Huong Thuong bridge, Mo Linh 1 bridge, Mo Linh 2 bridge in the form Open bidding .
04/08/2023 16:40
Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên announced the results of the bid package Package 03: Moving the power line within the site clearance for construction of the following works: Building North-South road and Huong Thuong bridge and Renovating the drainage system of Mo Bach canal .
- Winning bidder: VIET AN CONSTRUCTION CONSULTANCY AND COMMERCIAL JOINT STOCK COMPANY, KETKIN TRADING AND DESIGN INVESTMENT JOINT STOCK COMPANY
09/06/2023 10:49
Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên announced the results of the bidding package Package 03: Moving the power line within the site clearance for construction of the following works: Building North-South road and Huong Thuong bridge and Renovating the drainage system of Mo Bach canal with 1 participating contractors .
22/04/2023 17:10
Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên publishes Tender Notice Package 03: Moving the power line within the site clearance for construction of the following works: Building North-South road and Huong Thuong bridge and Renovating the drainage system of Mo Bach canal in the form Open bidding .
12/04/2023 16:43
Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên announced the results of the bid package Technical support for asset management .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VĂN PHÚ, Công ty Cổ phần MacroNT Việt Nam
07/01/2022 17:10
Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên announced the results of the bid package Technical assistance to develop integrated urban development strategy .
- Winning bidder: CÔNG TY CỔ PHẦN PDIC VIỆT NAM, CÔNG TY TNHH TƯ VẤN ĐẠI HỌC XÂY DỰNG
07/01/2022 17:05
Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên announced the results of the bid package Building North-South road and lighting electricity for North-South road, Huong Thuong bridge .
- Winning bidder: CÔNG TY TNHH THI SƠN, CÔNG TY CỔ PHẦN SẢN XUẤT CÔNG NGHIỆP XÂY LẮP 3
27/12/2021 17:43
Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên announced the results of the bid package Renovating the drainage system of the Cactus ditch .
- Winning bidder: CÔNG TY CP XÂY DỰNG VÀ PHÁT TRIỂN NÔNG THÔN 10
17/12/2021 17:46
Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên announced the results of the bid package Upgrading Le Huu Trac Street .
- Winning bidder: CÔNG TY CP XÂY DỰNG THĂNG LONG
16/12/2021 15:07
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted Tender Notice Package TN-CS-13: Consultancy on quality inspection of construction items of Huong Thuong bridge, Mo Linh 1 bridge, Mo Linh 2 bridge of the investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên with the form Open bidding.
04/08/2023 16:40
Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên Posted Development Investment Project Integrated development of dynamic urban - Thai Nguyen city.
04/08/2023 15:15
The Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted the results of the bidding package Package 03: Moving the power line within the site clearance for construction of the following works: Building North-South road and Huong Thuong bridge and Renovating the drainage system of Mo Bach canal of the investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên.
09/06/2023 10:49
Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted Tender Notice Package 03: Moving the power line within the site clearance for construction of the following works: Building North-South road and Huong Thuong bridge and Renovating the drainage system of Mo Bach canal of the investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên with the form Open bidding.
12/04/2023 16:43
Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên Posted Development Investment Project Moving power lines within the scope of site clearance for construction of construction works: Building North-South road and Huong Thuong bridge and Renovating the drainage system of Mo Bach canal under the Urban General Development project Motivation - Thai Nguyen City.
08/04/2023 16:16
The Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted the results of the bidding package Technical support for asset management of the investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên.
07/01/2022 17:10
The Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted the results of the bidding package Technical assistance to develop integrated urban development strategy of the investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên.
07/01/2022 17:05
The Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted the results of the bidding package Building North-South road and lighting electricity for North-South road, Huong Thuong bridge of the investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên.
27/12/2021 17:43
The Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted the results of the bidding package Renovating the drainage system of the Cactus ditch of the investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên.
17/12/2021 17:46
The Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted the results of the bidding package Upgrading Le Huu Trac Street of the investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên.
16/12/2021 15:07
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted 11 of the contractor selection plan, which contains 43 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên posted 6 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted 28 Tender Notice in the 21 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has posted 26 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 26 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has a relationship with 48 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên is the investor of 5 package, of which 5 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên is the owner of 3 contractor selection plan. In which, they self-invite 3 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên is an investor with 47 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên is the investor of 4 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code