Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên as follows:
- Has relationships with 54 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 19 contractor selection plans with a total of 52 bidding packages, of which 18 prequalification documents have not found the investment project.
- Has invited bids for 18 packages (with 21 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 15 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 33 packages that have not fully posted the contractor selection results. Of these 32 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 5.09 contractors.
- Breakdown by bidding field: Goods 9.52%, Construction 42.86%, Consultancy 33.33%, Non-consultancy 4.76%, Mixed 9.52%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 36,529,874,174 VND, of which the total winning bid value is: 26,661,271,655 VND.
- The savings rate is: 27.02%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên as follows:
- Has relationships with 54 contractor.
- The average number of contractors participating in each bidding package is: 5.09 contractors.
- Proportion of bidding fields: Goods 9.52%, Construction 42.86%, Consulting 33.33%, Non-consulting 4.76%, Mixed 9.52%, Other 0%.
- The total value according to the bidding package with valid IMP is: 36,529,874,174 VND, in which the total winning value is: 26,661,271,655 VND.
- The savings rate is: 27.02%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 1 Contractor selection plan in which 1 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 0 bidding packages in which 0 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted the results of the bidding package Package No. 21 (XL-07): Construction of road construction and operation phase 2 of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên.
- Winning bidder: CÔNG TY CỔ PHẦN THÀNH ĐẠT
15/04/2022 14:17
Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted Tender Notice Package 21 (XL-07): Construction of road construction and operation phase 2 of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên with the form National competitive bidding.
26/02/2022 11:36
Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted Tender Notice Package 21 (XL-07): Construction of road construction and operation phase 2 of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên with the form National competitive bidding.
21/02/2022 09:39
The Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted the results of the bidding package Package No. 20 (TV-11): Surveying consultancy, preparation of technical documents, preparation of bidding documents for operating roads (phase 2) of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ ĐẦU TƯ TRƯỜNG ĐỊNH
08/09/2021 11:21
Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted Tender Notice Tender package No 20 (TV-11): Surveying consultancy, preparation of technical documents, preparation of bidding documents for operating roads (phase 2) of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên with the form National competitive bidding.
24/06/2021 14:35
The Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted the results of the bidding package Package No. 19 (TV-10): Consulting on establishing reservoir operating procedures of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI ĐIỆN NĂNG
05/01/2021 10:35
Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted Tender Notice Tender package No 19 (TV-10): Consulting on setting up reservoir operation process of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên with the form National competitive bidding.
15/10/2020 15:15
Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted Tender Notice Package 11 (EPC): Design, supply, transport, storage and storage, installation, testing, calibration and commissioning of electromechanical equipment and technical services for wind power plant Phung 1 of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên with the form International Open Bidding.
06/10/2020 10:47
Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted Tender Notice Package 11 (EPC): Design, supply, transport, storage and storage, installation, testing, calibration and commissioning of electromechanical equipment and technical services for wind power plant Phung 1 of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên with the form International Open Bidding.
06/10/2020 09:46
The Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted the results of the bidding package Package No. 13 (TV-07): Completed project settlement audit consulting of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên.
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN VÀ TƯ VẤN TÀI CHÍNH CHÂU Á
25/08/2020 13:31
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên announced the results of the bid package Package No. 21 (XL-07): Construction of road construction and operation phase 2 .
- Winning bidder: CÔNG TY CỔ PHẦN THÀNH ĐẠT
15/04/2022 14:17
Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên announced the results of the bidding package Package 21 (XL-07): Construction of road construction and operation phase 2 with 6 participating contractors .
07/03/2022 09:53
Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên publishes Tender Notice Package 21 (XL-07): Construction of road construction and operation phase 2 in the form National competitive bidding .
26/02/2022 11:36
Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên publishes Tender Notice Package 21 (XL-07): Construction of road construction and operation phase 2 in the form National competitive bidding .
21/02/2022 09:39
Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên announced the results of the bid package Package No. 20 (TV-11): Surveying consultancy, preparation of technical documents, preparation of bidding documents for operating roads (phase 2) .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG 23, CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ ĐẦU TƯ TRƯỜNG ĐỊNH
08/09/2021 11:21
Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên announced the results of the bidding package Tender package No 20 (TV-11): Surveying consultancy, preparation of technical documents, preparation of bidding documents for operating roads (phase 2) with 3 participating contractors .
18/08/2021 14:34
Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên publishes Tender Notice Tender package No 20 (TV-11): Surveying consultancy, preparation of technical documents, preparation of bidding documents for operating roads (phase 2) in the form National competitive bidding .
24/06/2021 14:35
Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên announced the results of the bid package Package No. 19 (TV-10): Consulting on establishing reservoir operating procedures .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI ĐIỆN NĂNG
05/01/2021 10:35
Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên announced the results of the bidding package Tender package No 19 (TV-10): Consulting on setting up reservoir operation process with 3 participating contractors .
10/12/2020 13:42
Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên publishes Tender Notice Tender package No 19 (TV-10): Consulting on setting up reservoir operation process in the form National competitive bidding .
15/10/2020 15:15
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted the results of the bidding package Package No. 21 (XL-07): Construction of road construction and operation phase 2 of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên.
- Winning bidder: CÔNG TY CỔ PHẦN THÀNH ĐẠT
15/04/2022 14:17
Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted Tender Notice Package 21 (XL-07): Construction of road construction and operation phase 2 of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên with the form National competitive bidding.
26/02/2022 11:36
Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted Tender Notice Package 21 (XL-07): Construction of road construction and operation phase 2 of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên with the form National competitive bidding.
21/02/2022 09:39
The Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted the results of the bidding package Package No. 20 (TV-11): Surveying consultancy, preparation of technical documents, preparation of bidding documents for operating roads (phase 2) of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ ĐẦU TƯ TRƯỜNG ĐỊNH
08/09/2021 11:21
Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted Tender Notice Tender package No 20 (TV-11): Surveying consultancy, preparation of technical documents, preparation of bidding documents for operating roads (phase 2) of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên with the form National competitive bidding.
24/06/2021 14:35
The Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted the results of the bidding package Package No. 19 (TV-10): Consulting on establishing reservoir operating procedures of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI ĐIỆN NĂNG
05/01/2021 10:35
Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted Tender Notice Tender package No 19 (TV-10): Consulting on setting up reservoir operation process of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên with the form National competitive bidding.
15/10/2020 15:15
Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted Tender Notice Package 11 (EPC): Design, supply, transport, storage and storage, installation, testing, calibration and commissioning of electromechanical equipment and technical services for wind power plant Phung 1 of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên with the form International Open Bidding.
06/10/2020 10:47
Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted Tender Notice Package 11 (EPC): Design, supply, transport, storage and storage, installation, testing, calibration and commissioning of electromechanical equipment and technical services for wind power plant Phung 1 of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên with the form International Open Bidding.
06/10/2020 09:46
The Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted the results of the bidding package Package No. 13 (TV-07): Completed project settlement audit consulting of the investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên.
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN VÀ TƯ VẤN TÀI CHÍNH CHÂU Á
25/08/2020 13:31
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted 19 of the contractor selection plan, which contains 52 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted 21 Tender Notice in the 18 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has posted 15 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 15 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has a relationship with 54 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên is the owner of 1 contractor selection plan. In which, they self-invite 1 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban quản lý dự án thủy điện Sông Bung 2 - Chi nhánh Tổng Công ty Phát điện 2 - Công ty TNHH một thành viên is an investor with 13 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code