Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự as follows:
- Has relationships with 7 project owners.
- Has relationships with 259 contractor.
- Announced 147 investment development project, of which 9 projects have not yet announced the prequalification documents.
- Announced 244 contractor selection plans with a total of 988 bidding packages, of which 42 prequalification documents have not found the investment project.
- Has invited bids for 231 packages (with 269 tender notices), and conducted prequalification for 0 packages.
- There are 7 bidding packages with content that needs clarification.
- Announced the results of 230 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 31 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 800 packages that have not fully posted the contractor selection results. Of these 788 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.30 contractors.
- Breakdown by bidding field: Goods 11.52%, Construction 71.75%, Consultancy 13.01%, Non-consultancy 3.72%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,444,225,996,674 VND, of which the total winning bid value is: 1,314,110,230,188 VND.
- The savings rate is: 9.01%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự as follows:
- Has relationships with 259 contractor.
- The average number of contractors participating in each bidding package is: 2.30 contractors.
- Proportion of bidding fields: Goods 11.52%, Construction 71.75%, Consulting 13.01%, Non-consulting 3.72%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,444,225,996,674 VND, in which the total winning value is: 1,314,110,230,188 VND.
- The savings rate is: 9.01%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự are as follows:
- Is the investor of 147 development investment projects.
- Is the investor of 217 contractor selection plans, of which 186 were self-published, and 31 were published by other entities.
- Is the investor of 301 Tender Notices, of which 254 were self-invited, and 47 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted the results of the bidding package Package No. 01: Construction and renovation of the road surface (including traffic safety expenses) of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự.
- Winning bidder: MEKONG VIETNAM CONSTRUCTION AND TRADING COMPANY LIMITED
21/06/2025 09:41
The Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted the results of the bidding package Package No. 17: Construction supervision consultancy and construction equipment and equipment according to the work; Paragraph 1+2+3 from So Thuong River to So Ha River (including around the boat) of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự.
- Winning bidder: HYDRAULIC ENGINEERING CONSULTANT CORPORATION II
12/06/2025 15:32
The Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted the results of the bidding package Package No. 01: Construction of technical infrastructure system of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự.
- Winning bidder: CÔNG TY TNHH THÁI HOÀNG THÔNG
06/06/2025 16:10
Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted Tender Notice Tender package No 01: Construction and renovation of the road surface (including traffic safety expenses) of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự with the form Competitive Offer.
27/05/2025 15:34
The Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted the request Nguyen Du of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự with 4 bidding package.
20/05/2025 08:23
Investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted an investment and development project Nguyen Du Street.
20/05/2025 08:08
Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted Tender Notice Tender package No 17: Construction supervision consultancy and construction equipment and equipment according to the work; Paragraph 1+2+3 from So Thuong River to So Ha River (including around the boat) of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự with the form Open bidding.
16/05/2025 10:41
Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted Tender Notice Tender package No 17: Construction supervision consultancy and construction equipment and equipment according to the work; Paragraph 1+2+3 from So Thuong River to So Ha River (including around the boat) of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự with the form Open bidding.
12/05/2025 17:12
The Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted the request Urban embellishment and environmental improvement Residential line Canal Factory of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự with 24 bidding package.
12/05/2025 14:47
Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted Tender Notice Tender package No 01: Construction of technical infrastructure system of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự with the form Open bidding.
06/05/2025 15:08
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự announced the results of the bid package Package No. 01: Construction and renovation of the road surface (including traffic safety expenses) .
- Winning bidder: MEKONG VIETNAM CONSTRUCTION AND TRADING COMPANY LIMITED
21/06/2025 09:41
Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự announced the results of the bid package Package No. 17: Construction supervision consultancy and construction equipment and equipment according to the work; Paragraph 1+2+3 from So Thuong River to So Ha River (including around the boat) .
- Winning bidder: HYDRAULIC ENGINEERING CONSULTANT CORPORATION II
12/06/2025 15:32
Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự announced the results of the bid package Package No. 01: Construction of technical infrastructure system .
- Winning bidder: CÔNG TY TNHH THÁI HOÀNG THÔNG
06/06/2025 16:10
Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự announced the results of the bidding package Tender package No 01: Construction and renovation of the road surface (including traffic safety expenses) with 1 participating contractors .
03/06/2025 14:03
Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự announced the results of the bidding package Tender package No 17: Construction supervision consultancy and construction equipment and equipment according to the work; Paragraph 1+2+3 from So Thuong River to So Ha River (including around the boat) with 1 participating contractors .
30/05/2025 09:10
Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự publishes Tender Notice Tender package No 01: Construction and renovation of the road surface (including traffic safety expenses) in the form Competitive Offer .
27/05/2025 15:34
Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự publishes the plan Nguyen Du with 4 bidding package .
20/05/2025 08:23
Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự publishes Tender Notice Tender package No 17: Construction supervision consultancy and construction equipment and equipment according to the work; Paragraph 1+2+3 from So Thuong River to So Ha River (including around the boat) in the form Open bidding .
16/05/2025 10:41
Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự announced the results of the bidding package Tender package No 01: Construction of technical infrastructure system with 2 participating contractors .
15/05/2025 08:52
Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự publishes Tender Notice Tender package No 17: Construction supervision consultancy and construction equipment and equipment according to the work; Paragraph 1+2+3 from So Thuong River to So Ha River (including around the boat) in the form Open bidding .
12/05/2025 17:12
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted the results of the bidding package Package No. 01: Construction and renovation of the road surface (including traffic safety expenses) of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự.
- Winning bidder: MEKONG VIETNAM CONSTRUCTION AND TRADING COMPANY LIMITED
21/06/2025 09:41
The Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted the results of the bidding package Package No. 17: Construction supervision consultancy and construction equipment and equipment according to the work; Paragraph 1+2+3 from So Thuong River to So Ha River (including around the boat) of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự.
- Winning bidder: HYDRAULIC ENGINEERING CONSULTANT CORPORATION II
12/06/2025 15:32
The Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted the results of the bidding package Package No. 01: Construction of technical infrastructure system of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự.
- Winning bidder: CÔNG TY TNHH THÁI HOÀNG THÔNG
06/06/2025 16:10
Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted Tender Notice Tender package No 01: Construction and renovation of the road surface (including traffic safety expenses) of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự with the form Competitive Offer.
27/05/2025 15:34
The Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted the request Nguyen Du of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự with 4 bidding package.
20/05/2025 08:23
Investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted an investment and development project Nguyen Du Street.
20/05/2025 08:08
Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted Tender Notice Tender package No 17: Construction supervision consultancy and construction equipment and equipment according to the work; Paragraph 1+2+3 from So Thuong River to So Ha River (including around the boat) of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự with the form Open bidding.
16/05/2025 10:41
Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted Tender Notice Tender package No 17: Construction supervision consultancy and construction equipment and equipment according to the work; Paragraph 1+2+3 from So Thuong River to So Ha River (including around the boat) of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự with the form Open bidding.
12/05/2025 17:12
The Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted the request Urban embellishment and environmental improvement Residential line Canal Factory of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự with 24 bidding package.
12/05/2025 14:47
Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted Tender Notice Tender package No 01: Construction of technical infrastructure system of the investor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự with the form Open bidding.
06/05/2025 15:08
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted 244 of the contractor selection plan, which contains 988 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted 269 Tender Notices in 231 bidding packages. Among these, 253 Tender Notices were self-invited, and 16 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has posted 230 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 230 package, canceled the bid 0 package (among the bidding packages above).
- There are 31 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has a relationship with 259 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has a relationship with 121 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban quản lý dự án và Phát triển quỹ đất thành phố Hồng Ngự has a relationship with 9 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects