Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy as follows:
- Has relationships with 2 project owners.
- Has relationships with 138 contractor.
- Announced 252 investment development project, of which 19 projects have not yet announced the prequalification documents.
- Announced 247 contractor selection plans with a total of 801 bidding packages, of which 28 prequalification documents have not found the investment project.
- Has invited bids for 115 packages (with 135 tender notices), and conducted prequalification for 0 packages.
- There are 2 bidding packages with content that needs clarification.
- Announced the results of 235 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 120 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 559 packages that have not fully posted the contractor selection results. Of these 559 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.86 contractors.
- Breakdown by bidding field: Goods 5.19%, Construction 92.59%, Consultancy 2.22%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 548,084,373,587 VND, of which the total winning bid value is: 521,533,591,000 VND.
- The savings rate is: 4.84%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy as follows:
- Has relationships with 138 contractor.
- The average number of contractors participating in each bidding package is: 2.86 contractors.
- Proportion of bidding fields: Goods 5.19%, Construction 92.59%, Consulting 2.22%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 548,084,373,587 VND, in which the total winning value is: 521,533,591,000 VND.
- The savings rate is: 4.84%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy are as follows:
- Is the investor of 252 development investment projects.
- Is the investor of 219 contractor selection plans, of which 216 were self-published, and 3 were published by other entities.
- Is the investor of 241 Tender Notices, of which 117 were self-invited, and 124 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted the results of the bidding package Construction and renovation of land and office office (old) of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN XÂY DỰNG HOÀNG THÀNH
27/06/2025 07:50
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted the results of the bidding package Construction and installation - upgrading and expanding district road 58B (section from University.59 to My Hanh Trung Secondary and Secondary School) of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy.
- Winning bidder: CÔNG TY TNHH HÒA HÂN
27/06/2025 07:49
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted the results of the bidding package Construction and upgrading of road surface, sidewalk of Ong Hieu street of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI XÂY DỰNG HOÀNG HIỆP
25/06/2025 10:07
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted the results of the bidding package Construction and installation - Upgrading the canal route of Ong Nhi - My Hanh Trung commune of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy.
- Winning bidder: CÔNG TY TNHH NHỰT TIẾN TG
16/06/2025 10:16
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted the results of the bidding package Construction and installation - Repairing and renovating alley Group 30, Quarter 1, Ward 1 of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy.
- Winning bidder: BAO GIANG CONTRUCTION AND SERVICE COMPANY LIMITED
11/06/2025 11:43
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted the results of the bidding package Kindergarten repair and repair 3/2 of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy.
- Winning bidder: CÔNG TY TNHH PHONG VÂN PHÚ
11/06/2025 11:42
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted Tender Notice Construction and upgrading of road surface, sidewalk of Ong Hieu street of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy with the form Open bidding.
09/06/2025 18:02
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted Tender Notice Construction and renovation of land and office office (old) of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy with the form Open bidding.
09/06/2025 17:53
The Bid solicitor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy has posted the request Upgrade the road surface, sidewalk of Ong Hieu street of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy with 6 bidding package.
09/06/2025 16:29
Investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy has posted an investment and development project Upgrade the road surface, sidewalk of Ong Hieu street.
09/06/2025 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy publishes the plan Upgrade the road surface, sidewalk of Ong Hieu street with 6 bidding package .
09/06/2025 16:29
Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy publishes the plan Renovating land and working offices (old) with 7 bidding package .
06/06/2025 17:08
Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy publishes the plan Upgrade and expand district road 58B (section from University.59 to My Hanh Trung Secondary School and Secondary School) with 6 bidding package .
06/06/2025 14:55
Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy announced the results of the bid package Construction supervision .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN NGUYÊN PHÁT TG
03/06/2025 11:13
Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy announced the results of the bid package Construction insurance .
- Winning bidder: Vien Dong Assurance Corporation
31/05/2025 08:35
Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy announced the results of the bid package Construction insurance .
- Winning bidder: Vien Dong Assurance Corporation
31/05/2025 08:32
Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy announced the results of the bid package Construction insurance .
- Winning bidder: Vien Dong Assurance Corporation
31/05/2025 08:30
Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy announced the results of the bid package Construction insurance .
- Winning bidder: Vien Dong Assurance Corporation
31/05/2025 08:28
Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy announced the results of the bid package Construction and repair of Nguyen Van Lo Secondary School .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN XÂY DỰNG HẢI THÀNH CAI LẬY
28/05/2025 08:05
Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy announced the results of the bid package Construction supervision .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG HIỆP THÀNH
27/05/2025 15:49
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted the results of the bidding package Construction and renovation of land and office office (old) of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN XÂY DỰNG HOÀNG THÀNH
27/06/2025 07:50
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted the results of the bidding package Construction and installation - upgrading and expanding district road 58B (section from University.59 to My Hanh Trung Secondary and Secondary School) of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy.
- Winning bidder: CÔNG TY TNHH HÒA HÂN
27/06/2025 07:49
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted the results of the bidding package Construction and upgrading of road surface, sidewalk of Ong Hieu street of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI XÂY DỰNG HOÀNG HIỆP
25/06/2025 10:07
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted the results of the bidding package Construction and installation - Upgrading the canal route of Ong Nhi - My Hanh Trung commune of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy.
- Winning bidder: CÔNG TY TNHH NHỰT TIẾN TG
16/06/2025 10:16
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted the results of the bidding package Construction and installation - Repairing and renovating alley Group 30, Quarter 1, Ward 1 of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy.
- Winning bidder: BAO GIANG CONTRUCTION AND SERVICE COMPANY LIMITED
11/06/2025 11:43
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted the results of the bidding package Kindergarten repair and repair 3/2 of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy.
- Winning bidder: CÔNG TY TNHH PHONG VÂN PHÚ
11/06/2025 11:42
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted Tender Notice Construction and upgrading of road surface, sidewalk of Ong Hieu street of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy with the form Open bidding.
09/06/2025 18:02
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted Tender Notice Construction and renovation of land and office office (old) of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy with the form Open bidding.
09/06/2025 17:53
The Bid solicitor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy has posted the request Upgrade the road surface, sidewalk of Ong Hieu street of the investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy with 6 bidding package.
09/06/2025 16:29
Investor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy has posted an investment and development project Upgrade the road surface, sidewalk of Ong Hieu street.
09/06/2025 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy has posted 247 of the contractor selection plan, which contains 801 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy has posted 135 Tender Notices in 115 bidding packages. Among these, 123 Tender Notices were self-invited, and 12 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy has posted 235 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 235 package, canceled the bid 0 package (among the bidding packages above).
- There are 120 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy has a relationship with 138 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy has a relationship with 40 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban quản lý dự án và phát triển quỹ đất thị xã Cai Lậy has a relationship with 4 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects