Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án xã Lương Sơn as follows:
- Has relationships with 3 project owners.
- Has relationships with 240 contractor.
- Announced 144 investment development project, of which 5 projects have not yet announced the prequalification documents.
- Announced 162 contractor selection plans with a total of 660 bidding packages, of which 9 prequalification documents have not found the investment project.
- Has invited bids for 214 packages (with 257 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 347 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 155 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 351 packages that have not fully posted the contractor selection results. Of these 347 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.28 contractors.
- Breakdown by bidding field: Goods 3.11%, Construction 73.15%, Consultancy 22.18%, Non-consultancy 1.56%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,383,375,390,241 VND, of which the total winning bid value is: 2,342,597,947,245 VND.
- The savings rate is: 1.71%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án xã Lương Sơn as follows:
- Has relationships with 240 contractor.
- The average number of contractors participating in each bidding package is: 1.28 contractors.
- Proportion of bidding fields: Goods 3.11%, Construction 73.15%, Consulting 22.18%, Non-consulting 1.56%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,383,375,390,241 VND, in which the total winning value is: 2,342,597,947,245 VND.
- The savings rate is: 1.71%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban quản lý dự án xã Lương Sơn are as follows:
- Is the investor of 144 development investment projects.
- Is the investor of 145 contractor selection plans, of which 139 were self-published, and 6 were published by other entities.
- Is the investor of 236 Tender Notices, of which 233 were self-invited, and 3 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 4 bidding packages, of which 4 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Phú Thọ (4)
- Provinces before the merger where the contractor has participated in bidding : Hòa Bình (4)
- Has relationships with 1 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 15 bidding packages with 7 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Ban quản lý dự án xã Lương Sơn announced the results of the bid package Order No. 01: Construction .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN TUẤN DŨNG
24/12/2025 08:34
Ban quản lý dự án xã Lương Sơn announced the results of the bid package Package No. 1: Construction .
- Winning bidder: CÔNG TY TNHH THIỆN PHÁT 68
23/12/2025 11:00
Ban quản lý dự án xã Lương Sơn publishes Tender Notice Order No. 01: Construction in the form Competitive Offer .
16/12/2025 17:13
Ban quản lý dự án xã Lương Sơn publishes Tender Notice Order No. 01: Construction in the form Competitive Offer .
10/12/2025 17:57
Ban quản lý dự án xã Lương Sơn publishes Tender Notice Tender package No 1: Construction in the form Competitive Offer .
10/12/2025 17:54
Ban quản lý dự án xã Lương Sơn publishes the plan Repairing classrooms, function rooms and auxiliary items of Truong Son Kindergarten with 4 bidding package .
10/12/2025 09:23
Ban quản lý dự án xã Lương Sơn publishes the plan Repairing classrooms, function rooms and auxiliary items of Truong Son Kindergarten with 4 bidding package .
10/12/2025 09:06
Ban quản lý dự án xã Lương Sơn publishes the plan Plan for selecting contractors for the project of repairing classrooms, function rooms and auxiliary items at Hung Son Primary and Secondary School with 4 bidding package .
10/12/2025 07:55
Ban quản lý dự án xã Lương Sơn publishes the plan Plan for selecting contractors for the project of repairing classrooms, function rooms and auxiliary items at Hung Son Primary and Secondary School with 4 bidding package .
09/12/2025 17:42
Investor Ban quản lý dự án xã Lương Sơn has posted an investment and development project Repairing classrooms, function rooms and auxiliary items at Hung Son Primary and Secondary School.
09/12/2025 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án xã Lương Sơn announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI XÂY DỰNG MINH CHÍNH
15/11/2025 12:35
Ban quản lý dự án xã Lương Sơn announced the results of the bid package Package 5: Consulting on preparing bidding documents, evaluating bidding documents for supervision consulting packages .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG AN PHÁT 2
15/11/2025 12:29
Ban quản lý dự án xã Lương Sơn announced the results of the bid package Package 3: Consulting on preparing bidding documents and evaluating bidding documents for construction packages .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG AN PHÁT 2
15/11/2025 12:26
Ban quản lý dự án xã Lương Sơn announced the results of the bid package Package 4: Consulting on appraisal of bidding documents and LCNT results for construction bidding packages .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN LONG TIẾN ĐẠT HÒA BÌNH
15/11/2025 12:23
Ban quản lý dự án xã Lương Sơn announced the results of the bid package Package 6: Consulting on appraisal of bidding documents and LCNT results of supervision consulting package .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN LONG TIẾN ĐẠT HÒA BÌNH
15/11/2025 12:20
Ban quản lý dự án xã Lương Sơn announced the results of the bid package Package 02: Consulting on equipment installation supervision .
- Winning bidder: MINH KHANG CONSTRUCTION CONSULTING AND TRADING JOINT STOCK COMPANY
15/11/2025 12:16
Ban quản lý dự án xã Lương Sơn announced the results of the bid package Bidding package 04: Consulting on appraisal of bidding documents and appraisal of contractor selection results .
- Winning bidder: THANH PHAT INVESTMENTS DEVELOPMENT CONSTRUCTION TRADING JOINT STOCK COMPANY
15/11/2025 12:13
Ban quản lý dự án xã Lương Sơn announced the results of the bid package Bidding package 03: Consulting on preparation of bidding documents and evaluation of contractor selection results .
- Winning bidder: HA NOI 368 CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY
15/11/2025 12:09
Ban quản lý dự án xã Lương Sơn announced the results of the bid package Package No. 1: Construction of works .
- Winning bidder: Công ty TNHH MTV xây dựng và đầu tư Cộng Lực
18/09/2025 08:19
Ban quản lý dự án xã Lương Sơn announced the results of the bidding package Construction supervision consultant with 1 participating contractors .
30/06/2025 08:04
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án xã Lương Sơn announced the results of the bid package Order No. 01: Construction .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN TUẤN DŨNG
24/12/2025 08:34
Ban quản lý dự án xã Lương Sơn announced the results of the bid package Package No. 1: Construction .
- Winning bidder: CÔNG TY TNHH THIỆN PHÁT 68
23/12/2025 11:00
Ban quản lý dự án xã Lương Sơn publishes Tender Notice Order No. 01: Construction in the form Competitive Offer .
16/12/2025 17:13
Ban quản lý dự án xã Lương Sơn publishes Tender Notice Order No. 01: Construction in the form Competitive Offer .
10/12/2025 17:57
Ban quản lý dự án xã Lương Sơn publishes Tender Notice Tender package No 1: Construction in the form Competitive Offer .
10/12/2025 17:54
Ban quản lý dự án xã Lương Sơn publishes the plan Repairing classrooms, function rooms and auxiliary items of Truong Son Kindergarten with 4 bidding package .
10/12/2025 09:23
Ban quản lý dự án xã Lương Sơn publishes the plan Repairing classrooms, function rooms and auxiliary items of Truong Son Kindergarten with 4 bidding package .
10/12/2025 09:06
Ban quản lý dự án xã Lương Sơn publishes the plan Plan for selecting contractors for the project of repairing classrooms, function rooms and auxiliary items at Hung Son Primary and Secondary School with 4 bidding package .
10/12/2025 07:55
Ban quản lý dự án xã Lương Sơn publishes the plan Plan for selecting contractors for the project of repairing classrooms, function rooms and auxiliary items at Hung Son Primary and Secondary School with 4 bidding package .
09/12/2025 17:42
Investor Ban quản lý dự án xã Lương Sơn has posted an investment and development project Repairing classrooms, function rooms and auxiliary items at Hung Son Primary and Secondary School.
09/12/2025 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án xã Lương Sơn has posted 162 of the contractor selection plan, which contains 660 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án xã Lương Sơn has posted 257 Tender Notices in 214 bidding packages. Among these, 232 Tender Notices were self-invited, and 25 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án xã Lương Sơn has posted 347 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 347 package, canceled the bid 0 package (among the bidding packages above).
- There are 155 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý dự án xã Lương Sơn has a relationship with 240 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án xã Lương Sơn has a relationship with 131 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban quản lý dự án xã Lương Sơn has a relationship with 6 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects