Data analysis results of DauThau.info software for bid solicitors PROJECT MANAGEMENT CONSTRUCTION DAK MIL as follows:
- Has relationships with 123 contractor.
- Announced 15 investment development project, of which 4 projects have not yet announced the prequalification documents.
- Announced 276 contractor selection plans with a total of 904 bidding packages, of which 158 prequalification documents have not found the investment project.
- Has invited bids for 72 packages (with 80 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 415 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 356 packages with results that do not have tender notice or prequalification notice.
- There are 561 packages that have not fully posted the contractor selection results. Of these 554 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 4.00 contractors.
- Breakdown by bidding field: Goods 6.25%, Construction 86.25%, Consultancy 7.50%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 456,910,949,375 VND, of which the total winning bid value is: 447,689,582,420 VND.
- The savings rate is: 2.02%.
Data analysis results of DauThau.info software for bid solicitors PROJECT MANAGEMENT CONSTRUCTION DAK MIL as follows:
- Has relationships with 123 contractor.
- The average number of contractors participating in each bidding package is: 4.00 contractors.
- Proportion of bidding fields: Goods 6.25%, Construction 86.25%, Consulting 7.50%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 456,910,949,375 VND, in which the total winning value is: 447,689,582,420 VND.
- The savings rate is: 2.02%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 15 investment and development projects.
- As the owner of 130 Contractor selection plan in which 129 Contractor selection plan is self-published, and 1 Contractor selection plan is posted by other units.
- Being the investor of 11 bidding packages in which 10 packages are self-invited, and 1 packages are invited by other units.
You need to Login or Sign up to view all informations.
- Participated in 17 bidding packages, of which 17 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 0% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.12% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Undefined (17)
- Has relationships with 2 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the request Le Loi Secondary School; Categories: 08-room classroom, library room, equipment room of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL with 4 bidding package.
05/08/2022 11:08
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Consultantcy on surveying, preparing finance and technical reports of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
- Winning bidder: Công ty trách nhiệm hữu hạn một thành viên Kiến trúc Xây dựng DAKNONGLAND
05/08/2022 10:57
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the request Le Loi Secondary School in project preparation stage of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL with 1 bidding package.
05/08/2022 10:53
PROJECT MANAGEMENT CONSTRUCTION DAK MIL Posted Development Investment Project Le Loi Secondary School; Categories: 08-room classroom, library room, equipment room.
05/08/2022 10:10
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Expenses for making bid documents, evaluating bids for consulting and designing BVTC-DT of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
- Winning bidder: Công ty cổ phần đầu tư và xây dựng An Phát Đắk Nông
04/08/2022 14:28
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Survey consulting of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
19/07/2022 16:16
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Consultancy on making feasibility study report of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
19/07/2022 16:14
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the request Road from NH14 connecting Duc Minh - Thuan An inter-commune road (Phase 1) project preparation phase of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL with 4 bidding package.
19/07/2022 16:10
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Consulting survey, making feasibility study report of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
19/07/2022 16:00
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the request Renovating, upgrading and expanding Nguyen Trai Street in the project preparation phase of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL with 3 bidding package.
19/07/2022 15:55
The data sheet has been partially hidden, to see the full information please Login or Register
PROJECT MANAGEMENT CONSTRUCTION DAK MIL publishes the plan Le Loi Secondary School; Categories: 08-room classroom, library room, equipment room with 4 bidding package .
05/08/2022 11:08
PROJECT MANAGEMENT CONSTRUCTION DAK MIL announced the results of the bid package Consultantcy on surveying, preparing finance and technical reports .
- Winning bidder: Công ty trách nhiệm hữu hạn một thành viên Kiến trúc Xây dựng DAKNONGLAND
05/08/2022 10:57
PROJECT MANAGEMENT CONSTRUCTION DAK MIL publishes the plan Le Loi Secondary School in project preparation stage with 1 bidding package .
05/08/2022 10:53
PROJECT MANAGEMENT CONSTRUCTION DAK MIL announced the results of the bid package Expenses for making bid documents, evaluating bids for consulting and designing BVTC-DT .
- Winning bidder: Công ty cổ phần đầu tư và xây dựng An Phát Đắk Nông
04/08/2022 14:28
PROJECT MANAGEMENT CONSTRUCTION DAK MIL announced the results of the bid package Survey consulting .
- Winning bidder: Công ty TNHH Tư vấn xây dựng Vạn Tường
19/07/2022 16:16
PROJECT MANAGEMENT CONSTRUCTION DAK MIL announced the results of the bid package Consultancy on making feasibility study report .
- Winning bidder: Công ty TNHH Tư vấn xây dựng Vạn Tường
19/07/2022 16:14
PROJECT MANAGEMENT CONSTRUCTION DAK MIL publishes the plan Road from NH14 connecting Duc Minh - Thuan An inter-commune road (Phase 1) project preparation phase with 4 bidding package .
19/07/2022 16:10
PROJECT MANAGEMENT CONSTRUCTION DAK MIL announced the results of the bid package Consulting survey, making feasibility study report .
- Winning bidder: Công ty TNHH DTAH
19/07/2022 16:00
PROJECT MANAGEMENT CONSTRUCTION DAK MIL publishes the plan Renovating, upgrading and expanding Nguyen Trai Street in the project preparation phase with 3 bidding package .
19/07/2022 15:55
PROJECT MANAGEMENT CONSTRUCTION DAK MIL announced the results of the bid package Consultancy on making feasibility study report .
- Winning bidder: Công ty TNHH tư vấn xây dựng P-T
19/07/2022 15:13
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the request Le Loi Secondary School; Categories: 08-room classroom, library room, equipment room of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL with 4 bidding package.
05/08/2022 11:08
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Consultantcy on surveying, preparing finance and technical reports of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
- Winning bidder: Công ty trách nhiệm hữu hạn một thành viên Kiến trúc Xây dựng DAKNONGLAND
05/08/2022 10:57
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the request Le Loi Secondary School in project preparation stage of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL with 1 bidding package.
05/08/2022 10:53
PROJECT MANAGEMENT CONSTRUCTION DAK MIL Posted Development Investment Project Le Loi Secondary School; Categories: 08-room classroom, library room, equipment room.
05/08/2022 10:10
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Expenses for making bid documents, evaluating bids for consulting and designing BVTC-DT of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
- Winning bidder: Công ty cổ phần đầu tư và xây dựng An Phát Đắk Nông
04/08/2022 14:28
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Survey consulting of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
19/07/2022 16:16
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Consultancy on making feasibility study report of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
19/07/2022 16:14
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the request Road from NH14 connecting Duc Minh - Thuan An inter-commune road (Phase 1) project preparation phase of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL with 4 bidding package.
19/07/2022 16:10
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Consulting survey, making feasibility study report of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
19/07/2022 16:00
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the request Renovating, upgrading and expanding Nguyen Trai Street in the project preparation phase of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL with 3 bidding package.
19/07/2022 15:55
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted 276 of the contractor selection plan, which contains 904 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted 80 Tender Notice in the 72 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted 415 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 415 package, canceled the bid 0 package (among the bidding packages above).
- There are 356 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has a relationship with 123 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has a relationship with 2 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL is the investor of 11 package, of which 10 package is self-invited, other units invite bid 1 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL is the owner of 130 contractor selection plan. In which, they self-invite 129 of contractor selection plan, other units invite bids of 1 of contractor selection plan.
Summary: Investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL is an investor with 112 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL is the investor of 15 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code