Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án xây dựng huyện Tháp Mười as follows:
- Has relationships with 157 contractor.
- Announced 5 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 549 contractor selection plans with a total of 1299 bidding packages, of which 47 prequalification documents have not found the investment project.
- Has invited bids for 398 packages (with 415 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 5 packages with results that do not have tender notice or prequalification notice.
- There are 747 packages that have not fully posted the contractor selection results. Of these 743 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.92 contractors.
- Breakdown by bidding field: Goods 5.78%, Construction 91.08%, Consultancy 2.17%, Non-consultancy 0.96%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án xây dựng huyện Tháp Mười as follows:
- Has relationships with 157 contractor.
- The average number of contractors participating in each bidding package is: 3.92 contractors.
- Proportion of bidding fields: Goods 5.78%, Construction 91.08%, Consulting 2.17%, Non-consulting 0.96%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 5 investment and development projects.
- As the owner of 352 Contractor selection plan in which 351 Contractor selection plan is self-published, and 1 Contractor selection plan is posted by other units.
- Being the investor of 199 bidding packages in which 193 packages are self-invited, and 6 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án xây dựng huyện Tháp Mười has posted the request Combined dredging and embankment of the south side of Thuy Loi canal (Tu Cu canal - 1000 canal) of the investor Ban quản lý dự án xây dựng huyện Tháp Mười with 2 bidding package.
05/08/2022 15:05
The Bid solicitor Ban quản lý dự án xây dựng huyện Tháp Mười has posted the request Dredging to create sources combined with embankment of the East bank of Nhat canal (tel 846 - 8000) of the investor Ban quản lý dự án xây dựng huyện Tháp Mười with 3 bidding package.
05/08/2022 14:51
The Bid solicitor Ban quản lý dự án xây dựng huyện Tháp Mười has posted the request Upgrading Phu Dien market of the investor Ban quản lý dự án xây dựng huyện Tháp Mười with 2 bidding package.
05/08/2022 14:36
The Bid solicitor Ban quản lý dự án xây dựng huyện Tháp Mười has posted the request Dredging to create sources combined with embankment of the west bank of canal 1000 Ham 2 (from NVTA - Canal Five) of the investor Ban quản lý dự án xây dựng huyện Tháp Mười with 2 bidding package.
05/08/2022 14:26
The Bid solicitor Ban quản lý dự án xây dựng huyện Tháp Mười has posted the request Upgrading and embellishing the old market of the investor Ban quản lý dự án xây dựng huyện Tháp Mười with 2 bidding package.
05/08/2022 14:07
Ban quản lý dự án xây dựng huyện Tháp Mười Posted Development Investment Project Upgrading and embellishing the old market.
05/08/2022 07:00
Ban quản lý dự án xây dựng huyện Tháp Mười Posted Development Investment Project Dredging to create sources combined with embankment of the west bank of canal 1000 Ham 2 (from NVTA - Canal Five).
05/08/2022 07:00
Ban quản lý dự án xây dựng huyện Tháp Mười Posted Development Investment Project Upgrading Phu Dien market.
05/08/2022 07:00
Ban quản lý dự án xây dựng huyện Tháp Mười Posted Development Investment Project Combined dredging and embankment of the south side of Thuy Loi canal (Tu Cu canal - 1000 canal).
05/08/2022 07:00
The Bid solicitor Ban quản lý dự án xây dựng huyện Tháp Mười has posted the request Low voltage grid at My Hoa market of the investor Ban quản lý dự án xây dựng huyện Tháp Mười with 2 bidding package.
14/07/2022 10:39
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án xây dựng huyện Tháp Mười publishes the plan Combined dredging and embankment of the south side of Thuy Loi canal (Tu Cu canal - 1000 canal) with 2 bidding package .
05/08/2022 15:05
Ban quản lý dự án xây dựng huyện Tháp Mười publishes the plan Dredging to create sources combined with embankment of the East bank of Nhat canal (tel 846 - 8000) with 3 bidding package .
05/08/2022 14:51
Ban quản lý dự án xây dựng huyện Tháp Mười publishes the plan Upgrading Phu Dien market with 2 bidding package .
05/08/2022 14:36
Ban quản lý dự án xây dựng huyện Tháp Mười publishes the plan Dredging to create sources combined with embankment of the west bank of canal 1000 Ham 2 (from NVTA - Canal Five) with 2 bidding package .
05/08/2022 14:26
Ban quản lý dự án xây dựng huyện Tháp Mười publishes the plan Upgrading and embellishing the old market with 2 bidding package .
05/08/2022 14:07
Ban quản lý dự án xây dựng huyện Tháp Mười announced the results of the bidding package Tender package No 02: Leveling the ground; Foundation and pavement; Electric lighting system with 2 participating contractors .
21/07/2022 11:00
Ban quản lý dự án xây dựng huyện Tháp Mười publishes the plan Low voltage grid at My Hoa market with 2 bidding package .
14/07/2022 10:39
Ban quản lý dự án xây dựng huyện Tháp Mười announced the results of the bidding package Package 03: Renovating the Headquarters with 3 participating contractors .
04/07/2022 16:37
Ban quản lý dự án xây dựng huyện Tháp Mười announced the results of the bidding package Tender package No 02: Foundation, road surface; drainage system and relocation of power grid with 2 participating contractors .
01/07/2022 16:06
Ban quản lý dự án xây dựng huyện Tháp Mười publishes Tender Notice Tender package No 02: Leveling the ground; Foundation and pavement; Electric lighting system in the form National competitive bidding .
27/06/2022 16:18
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý dự án xây dựng huyện Tháp Mười has posted the request Combined dredging and embankment of the south side of Thuy Loi canal (Tu Cu canal - 1000 canal) of the investor Ban quản lý dự án xây dựng huyện Tháp Mười with 2 bidding package.
05/08/2022 15:05
The Bid solicitor Ban quản lý dự án xây dựng huyện Tháp Mười has posted the request Dredging to create sources combined with embankment of the East bank of Nhat canal (tel 846 - 8000) of the investor Ban quản lý dự án xây dựng huyện Tháp Mười with 3 bidding package.
05/08/2022 14:51
The Bid solicitor Ban quản lý dự án xây dựng huyện Tháp Mười has posted the request Upgrading Phu Dien market of the investor Ban quản lý dự án xây dựng huyện Tháp Mười with 2 bidding package.
05/08/2022 14:36
The Bid solicitor Ban quản lý dự án xây dựng huyện Tháp Mười has posted the request Dredging to create sources combined with embankment of the west bank of canal 1000 Ham 2 (from NVTA - Canal Five) of the investor Ban quản lý dự án xây dựng huyện Tháp Mười with 2 bidding package.
05/08/2022 14:26
The Bid solicitor Ban quản lý dự án xây dựng huyện Tháp Mười has posted the request Upgrading and embellishing the old market of the investor Ban quản lý dự án xây dựng huyện Tháp Mười with 2 bidding package.
05/08/2022 14:07
Ban quản lý dự án xây dựng huyện Tháp Mười Posted Development Investment Project Upgrading and embellishing the old market.
05/08/2022 07:00
Ban quản lý dự án xây dựng huyện Tháp Mười Posted Development Investment Project Dredging to create sources combined with embankment of the west bank of canal 1000 Ham 2 (from NVTA - Canal Five).
05/08/2022 07:00
Ban quản lý dự án xây dựng huyện Tháp Mười Posted Development Investment Project Upgrading Phu Dien market.
05/08/2022 07:00
Ban quản lý dự án xây dựng huyện Tháp Mười Posted Development Investment Project Combined dredging and embankment of the south side of Thuy Loi canal (Tu Cu canal - 1000 canal).
05/08/2022 07:00
The Bid solicitor Ban quản lý dự án xây dựng huyện Tháp Mười has posted the request Low voltage grid at My Hoa market of the investor Ban quản lý dự án xây dựng huyện Tháp Mười with 2 bidding package.
14/07/2022 10:39
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án xây dựng huyện Tháp Mười has posted 549 of the contractor selection plan, which contains 1299 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án xây dựng huyện Tháp Mười has posted 415 Tender Notice in the 398 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án xây dựng huyện Tháp Mười has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 5 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý dự án xây dựng huyện Tháp Mười has a relationship with 157 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
The data declared by the procuring entity is incorrect (missing agency code and having the same name as many other parties)
Summary: Investor Ban quản lý dự án xây dựng huyện Tháp Mười has a relationship with 3 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án xây dựng huyện Tháp Mười is the investor of 199 package, of which 193 package is self-invited, other units invite bid 6 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án xây dựng huyện Tháp Mười is the owner of 352 contractor selection plan. In which, they self-invite 351 of contractor selection plan, other units invite bids of 1 of contractor selection plan.
Summary: Investor Ban quản lý dự án xây dựng huyện Tháp Mười is an investor with 118 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án xây dựng huyện Tháp Mười is the investor of 5 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code