Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban quản lý Khu du lịch Mũi Cà Mau as follows:
- Has relationships with 9 contractor.
- Announced 16 investment development project, of which 6 projects have not yet announced the prequalification documents.
- Announced 16 contractor selection plans with a total of 33 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 27 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 3 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,925,224,558 VND, of which the total winning bid value is: 1,916,460,000 VND.
- The savings rate is: 0.46%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý Khu du lịch Mũi Cà Mau as follows:
- Has relationships with 9 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,925,224,558 VND, in which the total winning value is: 1,916,460,000 VND.
- The savings rate is: 0.46%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 16 investment and development projects.
- As the owner of 16 Contractor selection plan in which 16 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 3 bidding packages in which 0 packages are self-invited, and 3 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban quản lý Khu du lịch Mũi Cà Mau has posted the results of the bidding package Package 2: Construction of works of the investor Ban quản lý Khu du lịch Mũi Cà Mau.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN ĐÔ LƯƠNG CÀ MAU
02/10/2024 09:35
The Bid solicitor Ban quản lý Khu du lịch Mũi Cà Mau has posted the results of the bidding package Package 1: Supervision of construction works of the investor Ban quản lý Khu du lịch Mũi Cà Mau.
- Winning bidder: CÔNG TY TNHH THIẾT KẾ - XÂY DỰNG AN DUY
02/10/2024 09:32
The Bid solicitor Ban quản lý Khu du lịch Mũi Cà Mau has posted the request Repairing the stop floor in the Pier area at Ca Mau Cape Cultural and Tourism Park of the investor Ban quản lý Khu du lịch Mũi Cà Mau with 2 bidding package.
02/10/2024 09:27
The Bid solicitor Ban quản lý Khu du lịch Mũi Cà Mau has posted the request Repairing the roof of the Pier area at Ca Mau Cape Cultural and Tourism Park. of the investor Ban quản lý Khu du lịch Mũi Cà Mau with 1 bidding package.
02/10/2024 09:19
Ban quản lý Khu du lịch Mũi Cà Mau Posted Development Investment Project Repairing the stop floor in the Pier area at Ca Mau Cape Cultural and Tourism Park.
02/10/2024 09:09
The Bid solicitor Ban quản lý Khu du lịch Mũi Cà Mau has posted the results of the bidding package Package: Repairing the roof of the Pier area at Ca Mau Cape Cultural and Tourism Park of the investor Ban quản lý Khu du lịch Mũi Cà Mau.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN ĐÔ LƯƠNG CÀ MAU
22/08/2024 09:12
The Bid solicitor Ban quản lý Khu du lịch Mũi Cà Mau has posted the request Repairing the roof of the Pier area at Ca Mau Cape Cultural and Tourism Park. of the investor Ban quản lý Khu du lịch Mũi Cà Mau with 1 bidding package.
22/08/2024 09:08
Ban quản lý Khu du lịch Mũi Cà Mau Posted Development Investment Project Repairing the roof of the Pier area at Ca Mau Cape Cultural and Tourism Park..
22/08/2024 08:08
Ban quản lý Khu du lịch Mũi Cà Mau Posted Development Investment Project Repairing the roof of the Pier area at Ca Mau Cape Cultural and Tourism Park..
22/08/2024 08:08
The Bid solicitor Ban quản lý Khu du lịch Mũi Cà Mau has posted the results of the bidding package Package 1: Supervision of construction works of the investor Ban quản lý Khu du lịch Mũi Cà Mau.
12/08/2024 16:08
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý Khu du lịch Mũi Cà Mau announced the results of the bid package Package 2: Construction of works .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN ĐÔ LƯƠNG CÀ MAU
02/10/2024 09:35
Ban quản lý Khu du lịch Mũi Cà Mau announced the results of the bid package Package 1: Supervision of construction works .
- Winning bidder: CÔNG TY TNHH THIẾT KẾ - XÂY DỰNG AN DUY
02/10/2024 09:32
Ban quản lý Khu du lịch Mũi Cà Mau publishes the plan Repairing the stop floor in the Pier area at Ca Mau Cape Cultural and Tourism Park with 2 bidding package .
02/10/2024 09:27
Ban quản lý Khu du lịch Mũi Cà Mau publishes the plan Repairing the roof of the Pier area at Ca Mau Cape Cultural and Tourism Park. with 1 bidding package .
02/10/2024 09:19
Ban quản lý Khu du lịch Mũi Cà Mau announced the results of the bid package Package: Repairing the roof of the Pier area at Ca Mau Cape Cultural and Tourism Park .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN ĐÔ LƯƠNG CÀ MAU
22/08/2024 09:12
Ban quản lý Khu du lịch Mũi Cà Mau publishes the plan Repairing the roof of the Pier area at Ca Mau Cape Cultural and Tourism Park. with 1 bidding package .
22/08/2024 09:08
Ban quản lý Khu du lịch Mũi Cà Mau announced the results of the bid package Package 1: Supervision of construction works .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN ĐÔ LƯƠNG CÀ MAU
12/08/2024 16:08
Ban quản lý Khu du lịch Mũi Cà Mau announced the results of the bid package Goi 2: Construction work .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN ĐÔ LƯƠNG CÀ MAU
12/08/2024 16:04
Ban quản lý Khu du lịch Mũi Cà Mau announced the results of the bid package Contract package: Construction of a temporary roof for the embankment area to prevent landslides at Mui Ca Mau Cultural and Tourism Park .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN ĐÔ LƯƠNG CÀ MAU
08/08/2024 15:44
Ban quản lý Khu du lịch Mũi Cà Mau publishes the plan Construction of a temporary shelter for the embankment area to prevent landslides at Ca Mau Cape Cultural and Tourism Park with 1 bidding package .
08/08/2024 15:40
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý Khu du lịch Mũi Cà Mau has posted the results of the bidding package Package 2: Construction of works of the investor Ban quản lý Khu du lịch Mũi Cà Mau.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN ĐÔ LƯƠNG CÀ MAU
02/10/2024 09:35
The Bid solicitor Ban quản lý Khu du lịch Mũi Cà Mau has posted the results of the bidding package Package 1: Supervision of construction works of the investor Ban quản lý Khu du lịch Mũi Cà Mau.
- Winning bidder: CÔNG TY TNHH THIẾT KẾ - XÂY DỰNG AN DUY
02/10/2024 09:32
The Bid solicitor Ban quản lý Khu du lịch Mũi Cà Mau has posted the request Repairing the stop floor in the Pier area at Ca Mau Cape Cultural and Tourism Park of the investor Ban quản lý Khu du lịch Mũi Cà Mau with 2 bidding package.
02/10/2024 09:27
The Bid solicitor Ban quản lý Khu du lịch Mũi Cà Mau has posted the request Repairing the roof of the Pier area at Ca Mau Cape Cultural and Tourism Park. of the investor Ban quản lý Khu du lịch Mũi Cà Mau with 1 bidding package.
02/10/2024 09:19
Ban quản lý Khu du lịch Mũi Cà Mau Posted Development Investment Project Repairing the stop floor in the Pier area at Ca Mau Cape Cultural and Tourism Park.
02/10/2024 09:09
The Bid solicitor Ban quản lý Khu du lịch Mũi Cà Mau has posted the results of the bidding package Package: Repairing the roof of the Pier area at Ca Mau Cape Cultural and Tourism Park of the investor Ban quản lý Khu du lịch Mũi Cà Mau.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN ĐÔ LƯƠNG CÀ MAU
22/08/2024 09:12
The Bid solicitor Ban quản lý Khu du lịch Mũi Cà Mau has posted the request Repairing the roof of the Pier area at Ca Mau Cape Cultural and Tourism Park. of the investor Ban quản lý Khu du lịch Mũi Cà Mau with 1 bidding package.
22/08/2024 09:08
Ban quản lý Khu du lịch Mũi Cà Mau Posted Development Investment Project Repairing the roof of the Pier area at Ca Mau Cape Cultural and Tourism Park..
22/08/2024 08:08
Ban quản lý Khu du lịch Mũi Cà Mau Posted Development Investment Project Repairing the roof of the Pier area at Ca Mau Cape Cultural and Tourism Park..
22/08/2024 08:08
The Bid solicitor Ban quản lý Khu du lịch Mũi Cà Mau has posted the results of the bidding package Package 1: Supervision of construction works of the investor Ban quản lý Khu du lịch Mũi Cà Mau.
12/08/2024 16:08
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý Khu du lịch Mũi Cà Mau has posted 16 of the contractor selection plan, which contains 33 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý Khu du lịch Mũi Cà Mau has posted 27 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 27 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý Khu du lịch Mũi Cà Mau has a relationship with 9 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý Khu du lịch Mũi Cà Mau has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý Khu du lịch Mũi Cà Mau is the owner of 16 contractor selection plan. In which, they self-invite 16 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban quản lý Khu du lịch Mũi Cà Mau is an investor with 11 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý Khu du lịch Mũi Cà Mau is the investor of 16 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code