Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Basic infracstructure project for inclusive growth in Quang Binh PMU as follows:
- Has relationships with 3 project owners.
- Has relationships with 46 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 22 contractor selection plans with a total of 84 bidding packages, of which 14 prequalification documents have not found the investment project.
- Has invited bids for 29 packages (with 40 tender notices), and conducted prequalification for 3 packages.
- There are 4 bidding packages with content that needs clarification.
- Announced the results of 39 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 10 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 38 packages that have not fully posted the contractor selection results. Of these 38 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.21 contractors.
- Breakdown by bidding field: Goods 5.00%, Construction 42.50%, Consultancy 47.50%, Non-consultancy 2.50%, Mixed 0%, Other fields 2.5%.
- The total value according to the packages with valid contractor selection results is: 543,074,791,669 VND, of which the total winning bid value is: 540,192,447,480 VND.
- The savings rate is: 0.53%.
Data analysis results of DauThau.info software for bid solicitors Basic infracstructure project for inclusive growth in Quang Binh PMU as follows:
- Has relationships with 46 contractor.
- The average number of contractors participating in each bidding package is: 1.21 contractors.
- Proportion of bidding fields: Goods 5.00%, Construction 42.50%, Consulting 47.50%, Non-consulting 2.50%, Mixed 0%, Other 2.5%.
- The total value according to the bidding package with valid IMP is: 543,074,791,669 VND, in which the total winning value is: 540,192,447,480 VND.
- The savings rate is: 0.53%.
This Bid solicitor is also an investor. The analysis results of data for the investor Basic infracstructure project for inclusive growth in Quang Binh PMU are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 2 contractor selection plans, of which 2 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package Consulting, surveying, making adjustments to the design of construction drawings and cost estimates of the tourist route connecting Dong Hoi city with the southern region of Quang Binh province (Adjustment of Bao Ninh - Hai Ninh branch route, Additional projection electricity) light on An Son line). of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
10/10/2022 09:17
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package TV05: Construction survey supervision consultant for Nhat Le 3 bridge and road 2 at the bridgehead (Step Preparation of feasibility study report for construction investment) of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
29/09/2022 09:23
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package TV06: Construction supervision of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
26/09/2022 14:32
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package Construction of Phu Hai - Luong Ninh route (including: Construction cost + contingency cost + traffic safety cost) of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
26/08/2022 10:40
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package TV04: Consulting survey, making feasibility study report for construction investment of Nhat Le 3 bridge and road 2 at the bridge end of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
12/04/2022 08:56
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package TV03: Consulting to set up tasks and estimate the investigation and survey of the current status of forests and forestry land in service of site clearance for Nhat Le 3 Bridge and 2 bridgehead roads of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
12/04/2022 08:45
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package TV02: Consulting to verify the survey, design and construction work of Nhat Le 3 Bridge and the road 2 at the bridgehead (Step Preparation of feasibility study report for construction investment) of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
12/04/2022 08:42
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package TV01: Consulting on setting up survey tasks, designing construction works of Nhat Le 3 Bridge and road 2 at the bridgehead (Step Preparation of feasibility study report for construction investment) of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
12/04/2022 08:30
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package TV02: Survey consultancy, construction drawing design and cost estimate of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
08/04/2022 08:36
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package Consulting to set up tasks and outlines, survey estimates, prepare project feasibility study reports of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
10/03/2022 17:08
The data sheet has been partially hidden, to see the full information please Login or Register
Basic infracstructure project for inclusive growth in Quang Binh PMU announced the results of the bid package QB01.1: Improve and upgrade the tourist route connecting Dong Hoi city with the southern region of Quang Binh province (Bao Ninh - Hai Ninh route, lighting electricity for An Son route) .
- Winning bidder: CÔNG TY CỔ PHẦN TẬP ĐOÀN TRƯỜNG THỊNH
04/07/2023 14:26
Basic infracstructure project for inclusive growth in Quang Binh PMU announced the results of the bidding package QB01.1: Improve and upgrade the tourist route connecting Dong Hoi city with the southern region of Quang Binh province (Bao Ninh - Hai Ninh route, lighting electricity for An Son route) with 1 participating contractors .
21/04/2023 09:34
Basic infracstructure project for inclusive growth in Quang Binh PMU publishes Tender Notice QB01.1: Improve and upgrade the tourist route connecting Dong Hoi city with the southern region of Quang Binh province (Bao Ninh - Hai Ninh route, lighting electricity for An Son route) in the form Competitive Bidding .
31/03/2023 17:06
Basic infracstructure project for inclusive growth in Quang Binh PMU publishes the plan Supplementing the Contractor Selection Plan for Basic Infrastructure Project for Comprehensive Development in Nghe An, Ha Tinh, Quang Binh and Quang Tri Provinces - Quang Binh Province Subproject with 2 bidding package .
08/03/2023 14:16
Basic infracstructure project for inclusive growth in Quang Binh PMU announced the results of the bid package Consulting, surveying, making adjustments to the design of construction drawings and cost estimates of the tourist route connecting Dong Hoi city with the southern region of Quang Binh province (Adjustment of Bao Ninh - Hai Ninh branch route, Additional projection electricity) light on An Son line). .
- Winning bidder: Viện Quy hoạch xây dựng Quảng Bình, CÔNG TY CỔ PHẦN ĐẦU TƯ QBC
10/10/2022 09:17
Basic infracstructure project for inclusive growth in Quang Binh PMU announced the results of the bid package TV05: Construction survey supervision consultant for Nhat Le 3 bridge and road 2 at the bridgehead (Step Preparation of feasibility study report for construction investment) .
- Winning bidder: Công ty TNHH Tư vấn và công nghệ TECHCO
29/09/2022 09:23
Basic infracstructure project for inclusive growth in Quang Binh PMU announced the results of the bid package TV06: Construction supervision .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG GIAO THÔNG QUẢNG BÌNH
26/09/2022 14:32
Basic infracstructure project for inclusive growth in Quang Binh PMU announced the results of the bidding package Consulting, surveying, making adjustments to the design of construction drawings and cost estimates of the tourist route connecting Dong Hoi city with the southern region of Quang Binh province (Adjustment of Bao Ninh - Hai Ninh branch route, Additional projection electricity) light on An Son line). with 1 participating contractors .
26/09/2022 14:19
Basic infracstructure project for inclusive growth in Quang Binh PMU announced the results of the bidding package TV06: Construction supervision with 1 participating contractors .
17/09/2022 09:23
Basic infracstructure project for inclusive growth in Quang Binh PMU announced the results of the bid package Construction of Phu Hai - Luong Ninh route (including: Construction cost + contingency cost + traffic safety cost) .
- Winning bidder: CÔNG TY CỔ PHẦN TẬP ĐOÀN TRƯỜNG THỊNH
26/08/2022 10:40
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package Consulting, surveying, making adjustments to the design of construction drawings and cost estimates of the tourist route connecting Dong Hoi city with the southern region of Quang Binh province (Adjustment of Bao Ninh - Hai Ninh branch route, Additional projection electricity) light on An Son line). of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
10/10/2022 09:17
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package TV05: Construction survey supervision consultant for Nhat Le 3 bridge and road 2 at the bridgehead (Step Preparation of feasibility study report for construction investment) of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
29/09/2022 09:23
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package TV06: Construction supervision of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
26/09/2022 14:32
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package Construction of Phu Hai - Luong Ninh route (including: Construction cost + contingency cost + traffic safety cost) of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
26/08/2022 10:40
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package TV04: Consulting survey, making feasibility study report for construction investment of Nhat Le 3 bridge and road 2 at the bridge end of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
12/04/2022 08:56
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package TV03: Consulting to set up tasks and estimate the investigation and survey of the current status of forests and forestry land in service of site clearance for Nhat Le 3 Bridge and 2 bridgehead roads of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
12/04/2022 08:45
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package TV02: Consulting to verify the survey, design and construction work of Nhat Le 3 Bridge and the road 2 at the bridgehead (Step Preparation of feasibility study report for construction investment) of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
12/04/2022 08:42
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package TV01: Consulting on setting up survey tasks, designing construction works of Nhat Le 3 Bridge and road 2 at the bridgehead (Step Preparation of feasibility study report for construction investment) of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
12/04/2022 08:30
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package TV02: Survey consultancy, construction drawing design and cost estimate of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
08/04/2022 08:36
The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted the results of the bidding package Consulting to set up tasks and outlines, survey estimates, prepare project feasibility study reports of the investor Basic infracstructure project for inclusive growth in Quang Binh PMU.
10/03/2022 17:08
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Basic infracstructure project for inclusive growth in Quang Binh PMU has posted 22 of the contractor selection plan, which contains 84 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU posted 3 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted 40 Tender Notices in 29 bidding packages. Among these, 2 Tender Notices were self-invited, and 38 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has posted 39 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 39 package, canceled the bid 0 package (among the bidding packages above).
- There are 10 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Basic infracstructure project for inclusive growth in Quang Binh PMU has a relationship with 46 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Basic infracstructure project for inclusive growth in Quang Binh PMU has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects