Data analysis results of DauThau.info software for bid solicitors Bộ Tư lệnh Quân đoàn 4 as follows:
- Has relationships with 2 project owners.
- Has relationships with 43 contractor.
- Announced 14 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 53 contractor selection plans with a total of 135 bidding packages, of which 39 prequalification documents have not found the investment project.
- Has invited bids for 75 packages (with 79 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 52 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 10 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 84 packages that have not fully posted the contractor selection results. Of these 77 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.77 contractors.
- Breakdown by bidding field: Goods 29.11%, Construction 60.76%, Consultancy 7.59%, Non-consultancy 2.53%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 298,487,045,716 VND, of which the total winning bid value is: 294,889,444,920 VND.
- The savings rate is: 1.21%.
Data analysis results of DauThau.info software for bid solicitors Bộ Tư lệnh Quân đoàn 4 as follows:
- Has relationships with 43 contractor.
- The average number of contractors participating in each bidding package is: 1.77 contractors.
- Proportion of bidding fields: Goods 29.11%, Construction 60.76%, Consulting 7.59%, Non-consulting 2.53%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 298,487,045,716 VND, in which the total winning value is: 294,889,444,920 VND.
- The savings rate is: 1.21%.
This Bid solicitor is also an investor. The analysis results of data for the investor Bộ Tư lệnh Quân đoàn 4 are as follows:
- Is the investor of 14 development investment projects.
- Is the investor of 62 contractor selection plans, of which 51 were self-published, and 11 were published by other entities.
- Is the investor of 62 Tender Notices, of which 51 were self-invited, and 11 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted the results of the bidding package Package XL-01: Construction of architectural items + Technical infrastructure (except for termite protection + Communication + External network electrical system) of the investor Bộ Tư lệnh Quân đoàn 4.
29/09/2022 09:00
The Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted the results of the bidding package Tender package TV-07: Construction supervision consultancy of the investor Bộ Tư lệnh Quân đoàn 4.
27/09/2022 16:00
The Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted the results of the bidding package Bidding package for goods procurement (buying car engine oil in 2022) of the investor Bộ Tư lệnh Quân đoàn 4.
21/09/2022 13:00
Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted Tender Notice Package XL-01: Construction of architectural items + Technical infrastructure (except for termite protection + Communication + External network electrical system) of the investor Bộ Tư lệnh Quân đoàn 4 with the form National competitive bidding.
16/09/2022 21:52
Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted Tender Notice Package XL-01: Construction of architectural items + Technical infrastructure (except for termite protection + Communication + External network electrical system) of the investor Bộ Tư lệnh Quân đoàn 4 with the form National competitive bidding.
14/09/2022 21:50
Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted Tender Notice Bidding package for goods procurement (buying car engine oil in 2022) of the investor Bộ Tư lệnh Quân đoàn 4 with the form National Competitive Bidding.
14/09/2022 12:44
The Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted the request Buy car engine oil in 2022 of the investor Bộ Tư lệnh Quân đoàn 4 with 2 bidding package.
07/09/2022 17:07
Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted Tender Notice Tender package TV-07: Construction supervision consultancy of the investor Bộ Tư lệnh Quân đoàn 4 with the form National competitive bidding.
31/08/2022 23:03
The Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted the request Construction of barracks Regiment 141 / 7th Division / 4th Army Corps of the investor Bộ Tư lệnh Quân đoàn 4 with 6 bidding package.
31/08/2022 22:48
Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted Tender Notice Package XL-01: Construction of architectural items + Technical infrastructure (except for termite protection + Communication + External network electrical system) of the investor Bộ Tư lệnh Quân đoàn 4 with the form National competitive bidding.
31/08/2022 22:19
The data sheet has been partially hidden, to see the full information please Login or Register
Bộ Tư lệnh Quân đoàn 4 announced the results of the bid package Package XL-01: Construction of architectural items + Technical infrastructure (except for termite protection + Communication + External network electrical system) .
- Winning bidder: Công ty TNHH Một thành viên Tổng công ty Thái Sơn
29/09/2022 09:00
Bộ Tư lệnh Quân đoàn 4 announced the results of the bid package Tender package TV-07: Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN TƯ VẤN THIẾT KẾ VÀ ĐẦU TƯ XÂY DỰNG - BỘ QUỐC PHÒNG
27/09/2022 16:00
Bộ Tư lệnh Quân đoàn 4 announced the results of the bidding package Package XL-01: Construction of architectural items + Technical infrastructure (except for termite protection + Communication + External network electrical system) with 1 participating contractors .
27/09/2022 15:54
Bộ Tư lệnh Quân đoàn 4 announced the results of the bidding package Tender package TV-07: Construction supervision consultancy with 1 participating contractors .
23/09/2022 09:26
Bộ Tư lệnh Quân đoàn 4 announced the results of the bidding package Bidding package for goods procurement (buying car engine oil in 2022) with 6 participating contractors .
21/09/2022 13:38
Bộ Tư lệnh Quân đoàn 4 announced the results of the bid package Bidding package for goods procurement (buying car engine oil in 2022) .
- Winning bidder: There are no winning bidders
21/09/2022 13:00
Bộ Tư lệnh Quân đoàn 4 publishes Tender Notice Package XL-01: Construction of architectural items + Technical infrastructure (except for termite protection + Communication + External network electrical system) in the form National competitive bidding .
16/09/2022 21:52
Bộ Tư lệnh Quân đoàn 4 publishes Tender Notice Package XL-01: Construction of architectural items + Technical infrastructure (except for termite protection + Communication + External network electrical system) in the form National competitive bidding .
14/09/2022 21:50
Bộ Tư lệnh Quân đoàn 4 publishes Tender Notice Bidding package for goods procurement (buying car engine oil in 2022) in the form National Competitive Bidding .
14/09/2022 12:44
Bộ Tư lệnh Quân đoàn 4 publishes the plan Buy car engine oil in 2022 with 2 bidding package .
07/09/2022 17:07
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted the results of the bidding package Package XL-01: Construction of architectural items + Technical infrastructure (except for termite protection + Communication + External network electrical system) of the investor Bộ Tư lệnh Quân đoàn 4.
29/09/2022 09:00
The Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted the results of the bidding package Tender package TV-07: Construction supervision consultancy of the investor Bộ Tư lệnh Quân đoàn 4.
27/09/2022 16:00
The Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted the results of the bidding package Bidding package for goods procurement (buying car engine oil in 2022) of the investor Bộ Tư lệnh Quân đoàn 4.
21/09/2022 13:00
Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted Tender Notice Package XL-01: Construction of architectural items + Technical infrastructure (except for termite protection + Communication + External network electrical system) of the investor Bộ Tư lệnh Quân đoàn 4 with the form National competitive bidding.
16/09/2022 21:52
Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted Tender Notice Package XL-01: Construction of architectural items + Technical infrastructure (except for termite protection + Communication + External network electrical system) of the investor Bộ Tư lệnh Quân đoàn 4 with the form National competitive bidding.
14/09/2022 21:50
Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted Tender Notice Bidding package for goods procurement (buying car engine oil in 2022) of the investor Bộ Tư lệnh Quân đoàn 4 with the form National Competitive Bidding.
14/09/2022 12:44
The Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted the request Buy car engine oil in 2022 of the investor Bộ Tư lệnh Quân đoàn 4 with 2 bidding package.
07/09/2022 17:07
Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted Tender Notice Tender package TV-07: Construction supervision consultancy of the investor Bộ Tư lệnh Quân đoàn 4 with the form National competitive bidding.
31/08/2022 23:03
The Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted the request Construction of barracks Regiment 141 / 7th Division / 4th Army Corps of the investor Bộ Tư lệnh Quân đoàn 4 with 6 bidding package.
31/08/2022 22:48
Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted Tender Notice Package XL-01: Construction of architectural items + Technical infrastructure (except for termite protection + Communication + External network electrical system) of the investor Bộ Tư lệnh Quân đoàn 4 with the form National competitive bidding.
31/08/2022 22:19
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Bộ Tư lệnh Quân đoàn 4 has posted 53 of the contractor selection plan, which contains 135 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted 79 Tender Notices in 75 bidding packages. Among these, 40 Tender Notices were self-invited, and 39 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Bộ Tư lệnh Quân đoàn 4 has posted 52 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 52 package, canceled the bid 0 package (among the bidding packages above).
- There are 10 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Bộ Tư lệnh Quân đoàn 4 has a relationship with 43 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Bộ Tư lệnh Quân đoàn 4 has a relationship with 13 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Bộ Tư lệnh Quân đoàn 4 has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects