Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Tuy Hoa Air as follows:
- Has relationships with 0 project owners.
- Has relationships with 0 contractor.
- Announced 10 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Tuy Hoa Air as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Tuy Hoa Air are as follows:
- Is the investor of 10 development investment projects.
- Is the investor of 10 contractor selection plans, of which 0 were self-published, and 10 were published by other entities.
- Is the investor of 14 Tender Notices, of which 0 were self-invited, and 14 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Bid solicitor CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG THỐNG NHẤT has posted Tender Notice Tender package No 01MS: Procurement and installation of equipment of the investor Tuy Hoa Air with the form National competitive bidding.
25/03/2022 10:47
The Bid solicitor CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG THỐNG NHẤT has posted the request Repairing existing VRFs central refrigeration system in 2022 of the investor Tuy Hoa Air with 2 bidding package.
23/03/2022 16:41
Bid solicitor CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG THỐNG NHẤT has posted Tender Notice Tender package No 06XL: Construction work of the investor Tuy Hoa Air with the form National Competitive Bidding.
11/10/2021 10:11
The Bid solicitor CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG THỐNG NHẤT has posted the request Repairing airport security fence - CHKTH of the investor Tuy Hoa Air with 4 bidding package.
06/10/2021 17:56
Bid solicitor CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG THỐNG NHẤT has posted Tender Notice Tender package No 01MS: Procurement and installation of equipment of the investor Tuy Hoa Air with the form National Competitive Bidding.
27/05/2021 10:45
The Bid solicitor CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG THỐNG NHẤT has posted the request Repair existing VRFs central refrigeration system of the investor Tuy Hoa Air with 3 bidding package.
25/05/2021 17:21
Bid solicitor CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG THỐNG NHẤT has posted Tender Notice Tender package No 6: Construction of works of the investor Tuy Hoa Air with the form National competitive bidding.
02/12/2019 10:45
The Bid solicitor CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG THỐNG NHẤT has posted the request Construction of a toll station for cars entering/exiting Tuy Hoa Airport of the investor Tuy Hoa Air with 4 bidding package.
30/11/2019 06:01
Bid solicitor CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG THỐNG NHẤT has posted Tender Notice Package 06: Construction work: Passenger motorbike garage of the investor Tuy Hoa Air with the form National competitive bidding.
01/11/2019 06:47
The Bid solicitor CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG THỐNG NHẤT has posted the request Passenger motorbike garage - Tuy Hoa Airport of the investor Tuy Hoa Air with 4 bidding package.
29/10/2019 13:48
The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects